Defects in Bus bay and shelter

9. LOOP A

10. ECB

S.No Location Date of defect noticed Stage of work

1 1+350 16.06.2022 Not completed

2 29+700 16.06.2022 Not completed

11. VMS

S.No Location Date of defect noticed Stage of work

1 3+600 30.05.2022 Not completed

2 24+900 30.05.2022 Not completed


12. HM Stone/Kilo meter Stone Damaged

S.No Location Date of defect noticed Stage of work

1 10+500 (40/4) 8.06.2022 Not completed

2 18+950 (48/6) 8.06.2022 Not completed

3 18+000 (48/0) 21.06.2022 -

13. Parpet wall Missing/Damaged

S.No Location Date of defect noticed Stage of work

1 11+780 08.06.2022 Not completed

2 12+040 08.06.2022 Not completed

3 18+050 15.06.2022 Not completed

14.Road Safety
S.No Nature of defects Date of defect noticed Stage of work
Providing speed breakers
as per IRC standards in
1 service road nearer to 06.06.2022 Not completed
Entry and Exit
Providing sign points
boardsof
MCW & SR.
flickering lights in Service
road and Main
2 06.06.2022 Not completed
carriageway
All SOS (Save nearer to
our soul)
Entry
which and Exit points
is erected of
on Outer
MCW & SR(ORR) must be
Ring Road
visibly painted with solar
3 electronic scroll board 06.06.2022 Not completed
fixed on the top of post, so
that every
For the driver
2 KM can easily
there
accessbetheir
must one help
SOSwithout
post and
hindrance.
every 1km one signage
board carrying the
4 message of “SOS” facility, 06.06.2022 Not completed
with Toll free number
should to be erected.
(Suggested 5x4 feet) in
Every 1KM CCTV
Tamil and English.
Camera must be erected
5 06.06.2022 Not completed
and on all the entry & exit
of
In the
some service
Placesroad.
the parapet
wall and side iron railing
are not properly laid and
6 06.06.2022 Not completed
there is a discontinuity,
which have to be linked
for continuity.
All the sign boards may be
7 placed in English & Tamil 06.06.2022 Not completed
language.
Additional reflectors (or)
solar flickers should be
pasted on side iron railings
12 06.06.2022 Not completed
and side wall on the entire
stretch of Outer Ring
Extra transmitter (or)
Road.
some power backup must
13 be available so that power 06.06.2022 Not completed
cut during night time on
this stretch can be solved.
Yellow painted Rumbles
strip has to be provided
14 before all the entry points 06.06.2022 Not completed
into
In allservice Road
the entry andfrom
exit
400 Feet Outer Ring
points of 400 Feet RoadRoad.
to
Service Road in Outer
15 Ring Road, flickering 06.06.2022 Not completed
lights should be fixed, for
identification
By raising theduring
centre Night
hours. wall, iron railing
median
or parapet wall, will
16 prevent the cattle crossing 06.06.2022 Not completed
and also will prevent
accidents due to cattle
crossing.
1set of Heavy crane &
JCB Vehicle must be
17 06.06.2022 Not completed
placed near each Toll
Plaza.
Ambulance with life
support equipment must
18 06.06.2022 Not completed
be available round the
clock in each Toll plaza.

15.Balance work

Junction Improvement

Probable date of
S.No Location Stage of work
completion

1 5+100 (vellacheri) Yet to be commence -


Bus bays

Probable date of
S.No Location Stage of work
completion

1 Ch.11+665 (Vellanur) Yet to be commence -

2 Ch.19+590 (Pannivakkam) Yet to be commence -

3 Ch.20+180 (Angadu) Yet to be commence -

Rest Area
Probable
date of
completion

30.06.2022

30.06.2022

Probable
date of
completion

30.06.2022

30.06.2022
Probable
date of
completion

30.06.2022

30.06.2022

Probable
date of
completion

26.06.2022

26.06.2022

26.06.2022
Probable
date of
completion

Not given

Not given

Not given

Not given

Not given

Not given

Not given

Not given

Not given
Not given

Not given

Not given

Not given

Not given