4020-188-S-010 - PipeRack Structure Plan Sheet 1 of 2-Rev5 (Signed) 2
4020-188-S-010 - PipeRack Structure Plan Sheet 1 of 2-Rev5 (Signed) 2
5
E1 F F1 G 4A
N
4020-186-S-001/002
1350 250 350 N 0°
2
6000 6400
N 350 750
MACTCH LINE
N 1150 850 2000 2000 2150 2100 2150
1 TYP
SSDST-0002
3
014 WP (TYP)
20°
125
B3 B3 RL 340,100 TOS
4A B3 C3
2000
B3
B3
B3
1 A3
1000
014
125
B3 B3
4 WP (TYP)
THIS DRAWING
KEY PLAN
(SCALE: 1:5000)
PLAN VIEW RL 341.930 TOS
B3
B3
(SCALE: 1:100 mm) A3 NOTES :
1035
5 ALL MEMBER TO BE B2 UNO
ALL BRACING TO BE A4 (-110) UNO
1. FOR STRUCTURAL GENERAL NOTES REFER TO
DWG No: 000-SSDST-0001
E1 F F1 G RL 337,940 TOS C3 (REF) 2. FOR STRUCTURAL STEEL WORK MEMBER LEGEND REFER TO
DWG No : 000-SSDST-0040
4020-186-S-001/002
2425 6000 6400
3. ALL CONNECTION BEAM DETAILS REFER TO
= = 1000 1000 1000 1000 1000 1000 1075 1075 1050 1050 1075 1075 DWG No : 000-SDST-0002 U.N.O
MACTCH LINE
4. FOR HORIZONTAL BRACING CONNECTION DETAILS REFER TO
522 521 648 DWG No : 000-SDST-0003 U.N.O
STAIR-01 DOWN TO SECTION A 5. FOR VERTICAL BRACING CONNECTION DETAILS REFER TO
A 3
Ø2584
600
3
C
C3
C3
C3
C3
C3
C3
DWG No : 000-SDST-0013~0014 U.N.O
C
3
B3
1350
1750
B3
B2
B2
B2
B2
1700
B2
B3
9. THIS AREA TO USE SURFACE PROTECTION SYSTEM H
750
B3
B2
B2
B2
B2
B2
B2
B3
350
B3 B3 12. ALL BOLTS SHOULD BE GALVANIZED
SSDST-0010
4A
HANDRAIL (TYP) GRP GRATING 38 THK B3
5 RL 340.138 TOG STAIR (REF) 4A
2 1 WP (TYP)
UP TO RL 342.218 TOG
2000
- 014 1100 600
B3
H1
H3
B4 350 750
4
1150
PLAN VIEW RL 340.100 TOS 2
125
TYP RL 340.100 TOS B3 B3 C3
(SCALE: 1:100 mm)
SSDST-0002
ALL MEMBER TO BE B2 UNO
ALL BRACING TO BE A3 (-110) UNO
(TYP.) SECTION B
(SCALE: 1:50 mm) - 1
D E E1 -
P2
6450
1
4020-188-S-001/002
H3
TYP
MACTCH LINE
4 STAIR-01 UP TO
FRAME VIEW ELEVATION E1
014 5 (SCALE: 1:50 mm)
RL 340.138 TOG
4A
632 579 632
B8 ( REF )
B3 1700
750
UP (TYP.)
4
1350
B3
014 B3 C3
125
C3
RL 340.100 TOS
600
B3
4A
B3
B3
0)
11
11
0 )
(-
H3
WP (TYP)
125
51
P2
B3 5
4 1
DETAIL 1 1
2500 (SCALE: 1:20 mm) -
2150 2150 2150
2
PLAN VIEW RL 337.940 TOS 012
(SCALE: 1:100 mm) DETAIL 2
ALL MEMBER TO BE B2 UNO (SCALE: 1:20 mm) -
ALL BRACING TO BE A3 (-110) UNO FRAME VIEW ELEVATION F1
(SCALE: 1:50 mm)
GREEN GOLD TECHNOLOGY
ENGINEERING MANAGER
DRAWN 05.04.2024 ITY ReCYN PROJECT
CHECKED
ITY ReCYN PLANT
5 05.04.2024 MODIFICATION PLAN VIEW RL 340.100 TFS MTI
DATE : PROCESS
4020-188-S-010 MECHANICAL ARRANGEMENT ELEVATION 3 OF 4 4 29.11.2022 EXTEND ACCESS TO VALVE AND ADD SUPPORT WIN MTI PIPERACK
PROJECT MANAGER 4020-188-S-013 MECHANICAL ARRANGEMENT ReCYN PLANT 2 OF 2 3 25.10.2022 DELETE STAIR AND EXTEND HANDRAIL WIN MTI
MECHANICAL/PIPING
4020-00-M-001 MECHANICAL ARRANGEMENT GENERAL PLAN 2 07.10.2022 ISSUED FOR CONSTRUCTION WIN MTI
STRUCTURE PLAN SHEET 1 OF 2
HEAD OFFICE :
Sahid Sudirman Center (SSC), 39th floor CIVIL/STRUCTURAL 4020-188-R-010 CYANIDE LOADED SCREEN-CONFINEMENT SLAB SECT. 1 29.09.2022 ISSUED FOR CONSTRUCTION WIN MTI SCALE PAPER SIZE DRAWING NUMBER REV.
Jl. Jend. Sudirman Kav. 86 4020-188-R-009 CYANIDE LOADED SCREEN-CONFINEMENT SLAB PLAN 0 26.08.2022 ISSUED FOR CONSTRUCTION WIN JPP
Phone : +62-21-50810000 (hunting)
Jakarta Pusat 10220 - INDONESIA
DATE :
ELECTRICAL/INSTRUMENT DWG. NUMBER REFERENCES TITLE NO. DATE REVISION DESCRIPTION BY CHKD. 1:100 A3 4020-188-S-010 5