Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

BEARYS CHECKLIST FOR SHORING WORKS Quality Management System

Ref: BG - CL - PRJ - 006


GROUP Rev 0

Project:
Date:
Location of work:
Drawing Reference:
Verification /
No Activities Approval Status Remarks
Yes No N/A
A Preparation
1 Permit to work obtained?
2 Barricading the area completed?
3 Is the method of Shoring works approved by the
customer?
4 All personnel wearing PPEs?
5 Safety induction given to all personnel engaged at
work?
6 Quality induction including Dos and Don’ts explained to
all personnel engaged at work?
7 Is the Method statement explained to all stakeholders?
8 Are the materials to be used for shoring works are in
good condition?
9 Are the equipment to be used for shoring works are
checked and approved by HSE?
10 Are experienced and licensed operators are used for
operating the equipment?
11 Is signal man deployed to guide the operators?

B During De-watering works


1 Are locations identified for shoring as per the approved
drawing?
2 Are holes / steel sections inserted into the ground
vertical?
3 Is the depth to which the pipe / steel section to be
lowered is identified and reached?
4 Concrete poured (in case of diaphragm wall / secant
pile) as per approved mix design?
5 Steel sections (in case of Sheet pile) connected to each
other as per the method statement?

Inspected by: Reviewed and Approved by:

Page 1 of 1

You might also like