TIE BEAMS CHECKLIST

Project Inspection No.


Client Date
Project Manager Location
Consultant
Contractor Element
Sub-Contractor
Reference Documents (Specifications, Drawings, others)

Activity / Item: Yes No


1 All materials comply with project specifications † †
2 All materials in the tie beams are according to approved material submittals † †
3 Masonry solid blocks for the periphery are complete † †
4 Top of tie beam level established and cross - checked † †
5 Form work checked for alignment, depth, width and supports release agent applied † †
6 Reinforcement placed as per drawings and specifications † †
7 Necessary gate level achieved † †
Floating columns and main columns, walls, staircases etc, reinforcement placed as per
8
drawings and specifications
† †
9 Chamfers to concrete edges are provided as per drawings / specifications † †
Inspection from survey department (if any), and consultant complete and approved for
10
concreting
† †
11 Authority approval obtained prior to casting † †
Remarks:

Civil Works Checked By:


Name: Signature
Position: Date:
MEP Works Checked By:
Name: Signature
Position: Date:

Archcorp
AC.CL 004 Rev:00, Dated:04/09/2007