Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

REFERENCES

Farni, I., Zin, R. M., & Alzahri. (2020). Issues and challenges in the implementation of public housing

redevelopment projects due to earthquakes. IOP Conference Series, 849, 012022.

https://doi.org/10.1088/1757-899x/849/1/012022

Finucane, M. L., Acosta, J. D., Wicker, A., & Whipkey, K. (2020). Short-Term solutions to a Long-Term

challenge: rethinking disaster recovery planning to reduce vulnerabilities and inequities.

International Journal of Environmental Research and Public Health, 17(2), 482.

https://doi.org/10.3390/ijerph17020482

Lerondeau, M. (2022, September 28). The post-disaster reconstruction challenges in an unstable

world. Leonard, Foresight and Innovation by VINCI. https://leonard.vinci.com/en/the-

post-disaster-reconstruction-challenges-in-an-unstable-world/

Monteil, C., Simmons, P., & Hicks, A. (2020). Post-disaster recovery and sociocultural change:

Rethinking social capital development for the new social fabric. International Journal of

Disaster Risk Reduction, 42, 101356. https://doi.org/10.1016/j.ijdrr.2019.101356

Pamidimukkala, A., Kermanshachi, S., & Safapour, E. (2020). Challenges in Post-Disaster Housing

Reconstruction: Analysis of Urban vs. Rural Communities. Challenges in Post-Disaster

Housing Reconstruction: Analysis of Urban Vs. Rural Communities.

https://doi.org/10.3311/ccc2020-061

Rani, W. N. M. W. M., Nifa, F. a. A., Ismail, M. N., & Khalid, K. N. (2017). Planning for post disaster

recovery: Lesson learnt from flood events in Kelantan Malaysia. Nucleation and

Atmospheric Aerosols. https://doi.org/10.1063/1.5005476

Roosli, R., Nordin, J., & O’Brien, G. (2018). The evaluation of community participation in Post-Disaster

housing reconstruction projects in Malaysia. Procedia Engineering, 212, 667–674.

https://doi.org/10.1016/j.proeng.2018.01.086
Rouhanizadeh, B., Kermanshachi, S., & Nipa, T. J. (2020). Exploratory analysis of barriers to effective

post-disaster recovery. International Journal of Disaster Risk Reduction, 50, 101735.

https://doi.org/10.1016/j.ijdrr.2020.101735

S Kuppusamy et al. (2019). Implementation of green building materials in the construction industry

in Johor Bahru, Malaysia. IOP Conf. Series: Earth and Environmental Science 268 012006

Solutions, S. R. C. (2017, November 13). Disaster Recovery and Reconstruction: 4 Challenges to

Overcome - Risk & Insurance. Risk & Insurance. https://riskandinsurance.com/disaster-

recovery-reconstruction-4-challenges-overcome/

Uddin, S.M.J., Ganapati, N.E., Pradhananga, N., Prajapati, J. and Albert, A. (2021) ‘Is the Workers’

Health and Safety Scenario Different in Post-Disaster Reconstruction from Conventional

Construction? A Case Study in Bhaktapur,Nepal’, International Journal of Disaster Risk

Reduction, 64(October 2021), p. 102529. Available at:

https://doi.org/10.1016/j.ijdrr.2021.102529

UNDRR (2020) Human Cost of Disasters, UN Office for Disaster Risk Reduction (UNDRR). United

Nations Office for Disarmament Affairs. Available at:

https://doi.org/10.18356/79b92774-en

You might also like