Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

Translated from Chinese (Simplified) to English - www.onlinedoctranslator.

com

9000t lct type transport barge 276TEU


(for heavy equipment&vehicles,containers,coal,stone,heavy cargo,etc)
built in 2022
gross tonnage 3960
net tonnage 2217
LOA 109.69M
beam 22m
depth 6.25m
light draft 3.214m
loaded draft 4.5m Multipurpose LCT type transport barge
loaded displacement 9184.700t
light displacement 2266.796t
max full load capacity 9000t
main engine NINGBO CSI diesel engines two units 1103+1103kw
max selfsail speed 13kn/h
Hull Instructions WUT4837A-100-01SM page 2

target record

1 Overall ..................................................................... .................................3


1.1 General description of the ship................................................ .................................3
1.2 Classes, Rules and Regulations ................................................ ................................3
1.3 Main dimensions ................................................ .................................3
1.4 Capacity and tonnage ................................................ .................................4
1.5 tons ................................................ .................................5
1.6 Freeboard ..................................................................... .................................5
1.7 Deadweight and cargo capacity...................................................................... .................................5
1.8 Powerplant...................................................................... .................................5
1.9 Speed and endurance ................................................ .................................6
1.10 Stability ..................................................................... .................................7
1.11 Crew quota ................................................ .................................7
1.12 General arrangement overview ................................................ .................................7
2 Hull structure and painting...................................................... .................................8
2.1 Hull structure...................................................... ..............................8
2.2 Surface preparation and painting................................................................ ..........................9
3 Outfitting equipment...................................................... .................................10
3.1 Anchoring equipment and mooring equipment ................................................ ................................10
3.2 Rudder equipment ................................................ .................................10
3.3 Life-saving equipment...................................................... .................................11
3.4 Fire fighting equipment................................................ .................................11
3.5 Metal doors, windows, covers ................................................ .................................12
3.6 Escalators, railings and handrails ................................................ ................................12
3.7 Crew safe passage ................................................ ................................13
3.8 Navigation and signalling equipment ................................................ ................................13
4 Outfitting part of the cabin................................................................ .................................13
4.1 Fireproof structure...................................................................... .................................13
4.2 Wood insulation...................................................................... .................................13
4.3 Fire doors...................................................................... .................................14
4.4 Deck dressings ................................................ ................................14
4.5 Crew cabins ................................................ ................................14
Hull Instructions WUT4837A-100-01SM page 3

1 Overall

1.1 General description of the ship

1.1.1 Purpose

This ship is a multi-purpose deck transport ship, mainly carrying large machine parts and cargo, and can load coal mines, stones, large industrial/construction

Vehicles, etc., loaded with non-combustible engineering accessories, block stones and non-toxic block minerals and containers are

auxiliary. The design load of the cargo deck is 16t/m2.

1.1.2 Ship Type

The ship is made of steel, continuous single deck, double bottom in cargo and engine rooms, bulbous bow, welded steel plate stern post with stern frame bottom frame, port and starboard sides

The bilge part is provided with a bilge keel, which is transmitted by two marine diesel engines through a gear box to drive two fixed-pitch propellers propulsion double-engine, double-propeller, double

Rudder-stern boat. There are four deckhouses on the upper deck of the bow.

1.2 Classification, Rules and Regulations

The design and construction of the ship's hull structure, outfitting equipment, electrical machinery and all installations have been reviewed and inspected by the China Ship Inspection

The design and manufacture of the hull, machinery and equipment of this ship are mainly based on the following rules and regulations, including any

The revised notification/circular letter that will be enforced upon entry into force will carry out:

— China Classification Society (CCS) "Code for Construction of Sea-going Ships on Domestic Voyages" (2018) and its amendment notices (2019,2020)

— China Classification Society (CCS) "Code for Materials and Welding" (2018) and its amendment notices (2019,2020)

— The Maritime Safety Administration of the People's Republic of China (CHINA MSA) "Regulations on Statutory Inspection of Ships and Offshore Installations" (Domestic Seagoing Vessels

Statutory inspection technical rules) (2020)

— “Guidelines for Plan Approval of Self-propelled Deck Cargo Ships at Sea” by Zhejiang Ship Inspection Bureau (2015)

1.3 Main dimensions

1.3.1 Main dimensions

Overall length (with attachment) L 119.80 m

total long L OA 109.69 m

Design waterline length L WL 106.51 m

Length between vertical lines L pp 104.22 m

type width B 22.00 m

type deep D 6.25 m


Hull Instructions WUT4837A-100-01SM page 4

Design draft d 4.50 m

1.3.2 Center height between decks

From the upper deck edge to the first deck edge 3.00 m

from the first deck to the captain's deck 3.00 m

Captain's Deck to Driving Deck 2.40 m

Flying Deck to Compass Deck 2.40 m

upper deck to canopy deck 2.90 m

1.3.3 Beam arch

Main hull and canopy beam arch 0.00 m

The rest are built on beam arches 0.20 m

1.4 Capacity and tonnage

1.4.1 Capacity

The net volume of cargo tanks and liquid tanks of this ship is calculated by COMPASS-RULES. (1)

Fresh water tank

serial number cabin name rib Net volume (m 3 )


1 Fresh water tank (left) FR144〜FR156 67.64
2 Fresh water tank (right) FR144〜FR156 67.64
∑ 135.28
(2) Diesel tank

serial number cabin name rib Net volume (m 3 )


1 Diesel tank (left) FR43〜FR52 34.72
2 Diesel tank (right) FR43〜FR52 34.72
3 Diesel daily cabin (left) FR43〜FR46 7.36
4 Diesel daily cabin (right) FR43〜FR46 7.36
∑ 84.15
(3) Ballast water tank

serial number cabin name rib )


Net volume (m 3

1 Tail ballast tank (left,right) FR2〜FR23 499.66×2


2 NO.1Bottom ballast tank(left,right) FR113〜FR144 207.21/208.06
3 NO.2Bottom ballast tank(left,right) FR93〜FR113 145.35×2
4 NO.3Bottom ballast tank(left,right) FR73〜FR93 145.35×2
5 NO.4Bottom ballast tank(left,right) FR43〜FR73 217.90×2
6 first ballast tank FR156〜First 296.81
7 NO.1regulating water tank(left,right) FR113〜FR144 713.64×2
8 NO.2regulating water tank(left,right) FR93〜FR113 492.09×2
9 NO.3regulating water tank(left,right) FR73〜FR93 492.09×2
10 NO.4regulating water tank(left,right) FR43〜FR73 666.04×2
Hull Instructions WUT4837A-100-01SM page 5

∑ 7376.34
(4) Other cabins

serial number cabin name rib Net volume (m 3 )


1 Domestic sewage storage tank FR46〜FR49 3.70
2 Domestic sewage storage cabinet FR152+0.180〜FR155+0.380 9.60
3 residual oil tank FR40〜FR43 2.55
4 dirty oil tank FR40〜FR43 7.64
5 Main engine oil circulation tank(left,right) FR33〜FR37 2.41×2
6 Main engine oil storage tank FR30〜FR35 7.27
1.5 tons

The tonnage of this ship is calculated according to the provisions of Chapter 2 of the Regulations of the Maritime Safety Administration of the People's Republic of China (CHINA MSA).

Gross tonnage GT 3960

Net tonnage NT 2217

1.6 Freeboard

The freeboard of this ship is 1766mm when the design draft is 4.50m (that is, the summer load line), which meets the requirements of the Maritime Safety Administration of the People's Republic of China (CHINA).

MSA) Requirements for the minimum freeboard of Type B ships in domestic offshore areas in Part 3 of the Regulations.

1.7 Load capacity and cargo capacity


When the density of sea water is 1.025t/m, the design deadweight of this ship is about
3

6754.7t, the maximum full load is about 9000t. The loading area is FR23-FR137, and the maximum loading and unloading height of the cargo is

2.0m. The empty container capacity of the container is 276TEU, and the heavy container and homogeneous container are 207TEU.

When the vehicle ramp is closed, it should be close to the first sealing plate and keep it weathertight. The ship's vehicle ramp is provided with fastening, locking and supporting devices. When sailing,

the ramp is to be lifted and locked tightly with the deckhouse on each side, and corresponding sound and light alarm facilities are to be provided in the bridge. vehicle in cargo area

Loading and unloading operations are carried out on the deck, but the vehicle shall not be on board while the ship is sailing.

The actual maximum deadweight of the ship should be determined after the ship's completion inclination test and the measurement of the empty ship weight.

1.8 Power unit

1.8.1 Main propulsion plant

1.8.1.1 Host

Model and quantity G6300ZC6B 2 units

Rated power and speed 1103kW×500r/min

1.8.1.2 Gearbox

model GWC42.45
Hull Instructions WUT4837A-100-01SM page 6

Reduction ratio 2.95:1

1.8.1.3 Thrusters

The propeller of this ship adopts fixed pitch propeller.

Paddle type and number of blades MAU type 4 leaves

spin Towards external rotation

straight path 3.05 m

material material Cu3

Connection with propeller shaft Flat key connection

1.8.2 Generator set

1.8.2.1 Main generator set

Genset model and quantity CCFJ200J-Y 2 sets

Diesel model WP12CD235E201

output power and speed 235kW×1500r/min

Generator model SB-HW4(.D)-200

rated power 200kW

1.8.2.2 Parking diesel generator sets

Genset model and quantity CCFJ64J-Y 1 set

Diesel model WP4CD100E200

output power and speed 90kW×1500r/min

Generator model SB-HW4(.D)-64

rated power 64kW

1.9 Speed and endurance

1.9.1 Speed

Under the design draft of 4.50m and the following conditions, the design speed of the ship is about 12kn:

- under design

— The main engine runs at 90% rated power and has a 5% offshore wind and wave margin

— The hull is clean and free of fouling


Hull Instructions WUT4837A-100-01SM page 7

1.10 Stability

Title 4, Chapter 7 of the Code


The intact stability of the ship under various loading conditions meets the requirements of the Maritime Safety Administration of the People's Republic of China (CHINA MSA)

Requirements for cargo ships in offshore areas. Weathertight doors on the FR144 end walls of the upper deck (except CO2 room doors) and side walls of the engine room housing shall be permanently attached to the doors.

Long-term sign "keep closed while sailing". Hydraulic sliding watertight doors on the inner bottom plate shall remain closed during sailing unless in use.

1.11 Crew quota

The crew of the ship is 12 people.

category level number of people job title number of people job title number of people job title number of people

Level 1 2 captain 1 chief engineer 1


high level 2 2 first mate 1 Big tube wheel 1
class
Level 3 1 second mate 1
Boat
member
level 4 2 third mate 1 three-pipe wheel 1
total 7 4 3
ordinary
5 sailor 3 mechanic 2
crew
total 12 people

1.12 General arrangement overview

There are 5 watertight transverse bulkheads in the whole ship, which are located in FR2, FR23, FR43, FR144 and FR156 respectively. Set the steering gear compartment, tail

Ballast water tank, engine room, NO.4~NO.1 regulating water tank and bottom ballast water tank, emergency fire pump room and fresh water tank (left and right) and bow pressure

water tank. There are three deck houses above the first floor, with enclosed main stairway between each deck, and an outdoor inclined ladder to access.

(1) Aft cabin and engine room

Stern to FR2 are provided with steering gear compartment; FR3 to FR23 are to be provided with stern ballast tanks (left and right), of which FR2 to FR8 are empty spaces on the starboard and starboard sides; FR23 to

FR43 is the engine room, and the bottom of the double deck is the empty space, the main engine oil circulation tank (left and right), the dirty oil tank and the residual oil tank.

(2) Middle

On the inner bottom plate: Diesel tanks (left and right) are provided in the ballast tanks in the middle area of FR43~FR52;

NO.4〜NO.1 Adjust the water tank (left and right); the upper and middle of the inner bottom plate: FR46〜FR49 are equipped with toilets in the middle, and the middle area of the inner bottom plate is the ship

The main escape route from the first to the cabin.

In the double bottom: FR43~FR144 are set with bottom ballast water tanks (left and right) in order from NO.4 to NO.1.

(3) Bow cabin

FR144〜FR156, among them, the emergency fire pump room is under the platform; the fresh water tank (left and right), CO2 room and office are arranged on the platform .

FR156〜head is the head ballast tank.

(4) superstructure and deckhouse


Hull Instructions WUT4837A-100-01SM page 8

Below deck of the first floor: FR144~FR156 rib, with galley, dining room and entertainment area on the port side; 3 crew rooms on the starboard side ,

and third room; FR156 ~ bow, one toilet and one chain locker are provided on the starboard and starboard sides.

First floor deck: FR144〜FR156, with the chief engineer room and storage area on the port side, and the chief officer room and storage area on the starboard side; FR156〜Shoujia

Anchoring and mooring equipment are arranged on the deck.

Captain's deck: captain's room and its reception room, chief engineer's room and its reception room, second officer's room, third engineer's room and toilet.

Driving deck: from port side to starboard side, the chart area, crew room, toilet, battery room and wheelhouse are respectively reported.

Please refer to the "General Arrangement Plan" for the specific layout of the ship's architectural features and cabins, equipment, machinery and traffic routes.

(WUT4837A-100-02).

2 Hull structure and painting

2.1 Hull structure

2.1.1 Overview

2.1.1.1 Design basis

The ship's hull structural material, structural form, frame spacing, member size, connection method and welding specifications are all in accordance with the "Sea Code" "material

The relevant requirements for offshore cargo ships are designed according to the Regulations. and in accordance with Chapter 4, PART TWO of the Rules for Classification of Sea-going Steel Ships

Bone and side shells undergo Class B ice reinforcement.

2.1.1.2 Structure type

The main hull, superstructure and deckhouse of the ship are all welded steel structures. The hull structure adopts a hybrid skeleton type.

2.1.1.3 Aggregate spacing

1) Rib spacing

Tail-FR8 600mm

FR8-FR144 640mm

FR144-first 600mm

2) Longitudinal spacing

Double bottom and upper deck 615mm

side and longitudinal walls 625/530mm

3) Spacing of deck girder

deck stringer 1230/2460mm

4) Spacing between side keels

side keel 1230/2460mm

2.1.1.4 Construction Materials


Hull Instructions WUT4837A-100-01SM page 9

The hull structure material of this ship adopts marine low carbon steel, and the material grade shall be

The temperature, working environment, temperature and other conditions are determined in accordance with the requirements of the "Sea Regulations" and the "Material Regulations" for materials. The manufacturer of the material sha

Approved by the shipping department, and its products should be stamped with the seal of the surveying department.

The stern column is made of CCSD grade marine low carbon steel, the ice belt reinforcement area is made of CCSB grade low carbon steel, and the plates and profiles of other areas of the main hull are used

All use CCSA grade marine steel.

The bow and stern posts of this ship are welded from steel plates. The bulkheads are flat bulkheads.

2.1.1.5 Welding of hull structure

The welding of the hull structure is required to be carried out according to the "Welding Specification Sheet" (WUT4837A-190-01JB). Welding Welding of Hull Structures

The materials shall comply with the relevant requirements of the "Sea Regulations" and its "Material Regulations". For important technical procedures, the surveyor's approval is to be obtained.

2.1.2 Dimensions of main components

The dimensions of all hull structural members are calculated based on the design draught, and have been approved by the ship plan inspection agency.

For the dimensions of the main components of the hull structure, please refer to the "Design Calculation Book for Hull Structure Specifications" (WUT4837A-110-01JS) and "Main Components".

"Cross Section Drawing" (WUT4837A-110-04) and "Basic Structure Drawing" (WUT4837A-110-05) and other related drawings.

2.2 Surface pretreatment and coating

Steel Pretreatment: Steel should be pretreated before construction. The pretreatment should use shot peening in special equipment to remove rust, and spray

Shop primer. Rust removal level isSa2.5.

After processing and combining into sections, for parts that cannot be rusted by shot peening, use manual rust removal or power tools to remove rust before painting.

rust, the quality of rust removal should reachCB*3092-81middlet2level requirements.

The paint and color of the ship are designated by the shipowner. The paint brushing degree/reference thickness is only for reference. The specific use should be in accordance with the paint factory's specifications

The space at the hull structure with difficult access will be filled with cement and guided drainage; the main parts are painted as follows:

part paint name Brushing degree/reference thickness

Chlorinated Rubber Primer 1/100μm

below waterline High build chlorinated antirust paint 2/40μm

Long-lasting antifouling paint 2/100μm

Chlorinated Rubber Primer 1/100μm


Boat
waterline High build chlorinated rubber antirust paint 2/40μm
shell

Chlorinated rubber antirust paint 2/100μm

Chlorinated Rubber Primer 1/100μm

above waterline High build chlorinated rubber antirust paint 2/40μm

Chlorinated rubber waterline paint 2/100μm

Anti-rust primer 2/80μm


open deck
deck Phenolic Deck Paint 2/80μm

indoor deck Anti-rust primer 2/80μm


Hull Instructions WUT4837A-100-01SM page 10

(without dressing, outside wood) Phenolic Deck Paint 2/80μm

Anti-rust primer 2/80μm


Superstructure, deck exterior walls
Alkyd Cargo Paint 2/80μm

Anti-rust primer 2/80μm


cargo hold

Alkyd Cargo Paint 2/80μm

ballast tank Epoxy bituminous thick paste anti-rust paint 1/200μm

tank clear water tank Clear water tank paint 3/200μm

diesel tank clear oil 2

3 Outfitting equipment

3.1 Anchoring equipment and mooring equipment

The number of outfittings of this ship is about 1139, and anchoring and mooring equipment is provided in accordance with the requirements of Section 2, Chapter 3, PART TWO of the Sea Rules.

3.1.1 Anchoring equipment

(1) Anchor: The first anchor adopts the Spek anchor2Only, each anchor weighs 3300kg.

(2) Anchor chain: CCS grade 3 electric welding head anchor chain, diameter Φ46, total length 495m.

(3) Windlass: Model and quantity: 2 sets of YM2F46/3 hydraulic single-side windlasses (double drums).

3.1.2 Mooring equipment

(1) 1 tow rope,36 ZAB 6×37S+FC 1570 ZS 671Fiber core galvanized steel wire rope1Root, 200m long.

(2) 4 mooring cables, φ48 eight-strand polypropylene filament, each 180m long.

(3) Mooring winches: 2 sets of YB2F125 125KN hydraulic single-side mooring winches (double drums).

(4) Mooring attachments: Belt piles, fairlead holes and fairlead rollers adopt relevant national standards.

(5) The lower decks such as bollards, fairleads, fairlead rollers, etc. are partially reinforced.

Fairleads are welded with bulwark and reinforced with brackets.

For details of the ship's anchoring and mooring equipment layout, please refer to "Mooring Equipment Layout Plan" (WUT4837A-210-01) and "Mooring Equipment Layout"

Equipment Layout” (WUT4837A-220-01).

3.2 Rudder equipment

The structural dimensions of the rudder blade meet the specification requirements. There are horizontal and vertical partitions inside the rudder blade, and there are drainage holes on the partitions to ensure good

of internal drainage.

(1) rudder blade

Number of rudder blades 2indivual

single rudder areaA 7.26 m2

Aspect ratio λ 1.50


Hull Instructions WUT4837A-100-01SM page 11

Balance ratiok 0.227

(2) tiller

The rudder stock is a marine structural forged steel part, designed according to the requirements of the specification, and the horizontal flange connection is used between the rudder stock and the rudder blade. For the upper

The double key is connected to the tiller.

The diameter of the rudder stock at the tiller is150mm;

The diameter of the rudder stock at the lower rudder bearing is170mm;

(3) Servo

The ship adopts 1 hydraulic fork type hydraulic steering gear; nominal torque: 125kN-m; steering angle:±35 o .

3.3 Life-saving equipment

The ship's life-saving appliances are equipped in accordance with the requirements of Chapter 3, PART 4 of the Regulations for cargo ships in offshore areas.

(1) Life rafts, rescue boats

The ship has 2 fully enclosed lifeboats for 12 people (one is also a rescue boat) on the starboard and starboard sides of the bow deck.

There are 2 self-supporting formal inflatable life rafts for 12 people and 2 rope ladders for boarding; there are 6 people throwing inflatable life rafts on the starboard side of the upper deck at the stern (6

person) 1, and take 1 rope ladder.

(2) Life jackets, immersion suits and life buoys

The whole ship is equipped with 21 life jackets, and each life jacket is equipped with 1 life jacket light.

1 fitted thermal immersion suit per person for a total of 14 pieces.

The whole ship is equipped with 10 lifebuoys, including 3 with self-igniting light, 2 with buoyant lifeline, 2 with light and smoke signal

Only.

(3) Rope throwing equipment

The whole ship is equipped with 4 portable rope throwers.

(4) Pyrotechnic signal equipment

The whole ship is equipped with 12 approved rocket parachute flame signals.

(5) 3 two-way VHF radiotelephones for liferafts (see electrical equipment).

For details of the arrangement of the life-saving equipment of the ship, please refer to the "Arrangement of Life-saving Equipment" (WUT4837A-270-01).

3.4 Fire fighting equipment

Fire-fighting equipment shall be provided in accordance with the requirements for offshore cargo ships in Chapter 2-2, Part 4 of the Regulations. The whole ship is equipped with water fire extinguishing system and carbon diox

1 set of fire extinguishing system.

(1) Fire hydrant, hose box, hose and water gun

There are 19 fire hydrants and 19 hose boxes throughout the ship.
Hull Instructions WUT4837A-100-01SM page 12

(2) Fire extinguisher

The whole ship is equipped with 10 9L portable foam fire extinguishers, 10 spares, 11 5kg portable dry powder fire extinguishers, and 11 spares

. The cabin is equipped with a portable foam gun device or a related spare container, and a 45L cart-type foam fire extinguisher.

(3) 1 set of carbon dioxide cylinders.

(4) Firefighter equipment

The ship is equipped with 2 sets of firefighters' equipment, complete with the corresponding configuration required by the rules.

(5) The whole ship is equipped with 7 sets of emergency escape breathing devices (EEBD).

3.5 Metal doors, windows, covers

(1) Metal door

The entrances and exits of all cabins of this ship that communicate with the outside and the windows used as lighting or ventilation are provided with weathertight single-leaf steel doors and windows. Place

The doors on the outside open outboard, and the doors on the side walls of the deck outside open forward. Doors on the outer walls of the upper deck and forecastle deckhouses,

The height of the sill is 600mm; the height of the sill of the peripheral wall of the driving deck is 250mm, and the height of the sill of the other deckhouses is 380mm. Inside

The door for the safety passage area on the bottom plate to ensure the complete watertightness of the bulkhead is a hydraulic sliding watertight door. Bulkheads separating adjacent spaces of interior compartments

The fire integrity and the fire rating of the corresponding fire doors shall comply with the relevant requirements of the regulations. The door viewing position inside the cabin requires installation related

Fire doors, cabin empty doors and ordinary steel doors of the appropriate class.

(2) Metal windows

On the outer wall of the deck house on the upper deck, there are 350 light-transmitting marine portholes;

Except), bolts are installed on the peripheral wall to install openable steel marine ordinary rectangular windows;

Fixed steel marine rectangular windows with rotating windows on two of the windows in the front wall.

For the specific specifications and layout of the ship's metal doors and windows, please refer to the "Whole Ship Doors and Windows Layout Plan" (WUT4837A-260-01).

(3) Hatch covers and manhole covers

Small hatch covers of steel for access to the steering gear room from the upper deck;

Manhole cover.

For the specific specifications and arrangement of hatch covers and manhole covers of this ship, please refer to "Arrangement of Small Hatch Covers and Manhole Covers" (WUT4837-260

- 02).

3.6 Escalators, railings and handrails

(1) The main stairway surrounding each deck house is provided, and each upper deck house can be accessed from the upper deck house. The main stairway is inclined

A steel structure inclined ladder with an inclination angle of not more than 50° and a net width of not less than 700mm, and equipped with steel pipe handrails. Access the steering gear from the upper deck

The traffic escalator in the cabin adopts a steel straight ladder with a width of 400mm.

(2) Bulwarks and railings


Hull Instructions WUT4837A-100-01SM page 13

There is a 1000mm high bulwark at the front of the forecastle, the upper deck, captain's deck, driving deck, compass deck and the rear of the forecastle are all

Equipped with a railing with a height of 1000mm, the railing pillars are made of 60×16 flat steel, and the horizontal bars are made ofφ20×3 steel pipe with handrails

φ42.3×3.25 galvanized steel pipe.

For the specific structure type, specification, material and arrangement of bulwarks and railings, please refer to "Arrangement of Railings and Handrails of the Whole Ship and Structural Drawings of Bulwarks"

(WUT4837-260-03).

3.7 Crew safe passage

The ship has a cabin passage from the bow to the stern, from the inclined ladder on the starboard main deck in the forecastle to the empty cabin on the double bottom.

With a wire rope, slide the watertight door through the FR45 and access the engine room. The upper deck is surrounded by wire ropes around the cargo area, and there is a wire rope larger than 600mm

wide safe passage.

3.8 Navigation and signalling equipment

Navigation and signalling equipment shall be provided in accordance with the requirements of Chapter 5 and Chapter 8 of Part 4 of the Regulations for cargo ships in offshore areas.

(1) Radar mast

Two radar masts with steel pipe structure are installed on the compass deck, on which are equipped with the necessary navigation guidance such as radar antennas, lights, and whistles

Signal equipment and lightning rods and other facilities.

(2) Models, flags and sound signal devices

Except for signal lights and flashing lights, which are located at designated positions, the shapes (such as anchor balls), flags, and sound signal devices are required by regulations.

Please match.

For details of the layout of the signal equipment of the ship, please refer to the "Layout Plan of Sound and Light Signal Equipment" (WUT4837A-240-01).

For the specific configuration of electronic navigation equipment and instruments, please refer to the "Order Details of Electrical Equipment" (WUT4837A-608-01MX).

4 Cabin outfitting part

4.1 Fireproof structure

The fire protection structure of this ship is implemented in accordance with the requirements for offshore cargo ships in Chapter 2-2, PART 4 of the Regulations.

The ship adopts non-combustible B- or C-class divisions as internal dividing bulkheads in accommodation and service spaces; and in accommodation spaces

The bulkheads and decks adjacent to machinery spaces of category A and service spaces shall be divided by class A-60 fire resistance;

enclosure protection. All linings, ceilings and their associated linings in accommodation spaces, service spaces and control stations are to be of non-combustible materials

material.

4.2 Wood insulation

Ceramic wool is used as the insulation material for the fire insulation of bulkheads and/or decks with fire integrity grades above A-0;

Glass wool insulation shall be laid on the coamings and/or decks used as interior partitions of accommodation spaces and service spaces with properties above B-0, lining

Ceramic wool for slabs or ceilings. For the surrounding walls and decks adjacent to the open air, lay 50mm thick ultra-fine glass wool felt for thermal insulation
Hull Instructions WUT4837A-100-01SM page 14

edge.

4.3 Fire doors

The fire doors are to be installed in accordance with the requirements for the fire separation level of the bulkhead where they are located, and the fire doors are to be of a type approved by the ship inspection agency.

and have the corresponding product certificate. Fire doors at the stairway enclosure shall be equipped with door closers.

4.4 Deck dressings

Deck coverings shall meet the fire integrity required by the code. Areas requiring fire integrity grades above A-0 should use

Fire-resistant deck coverings. Other areas can be directly painted with paint or flame retardant light deck coverings can be used as appropriate. living room, driving

Room and other cabin floor, lay PVC floor on deck covering. The kitchen, dining room and bathroom floors are covered with non-slip floor coverings

brick.

4.5 Crew cabins

The ship is equipped with 6 single crew rooms with a net floor area greater than 5.5m 2;The net floor area of the third tube wheel, the second pair and the third pair is large

at 8.5m2;The captain, chief engineer, chief mate and chief engineer officer are equipped with separate reception rooms, and the net floor area of the living room is greater than 8.5m 2. on the first floor

There is a dining and entertainment room with a TV cabinet, medicine cabinet, bookcase and water dispenser. Crew cabin, wheelhouse, dining room and entertainment

The music room and monitoring room are air-conditioned.


Translated from Chinese (Simplified) to English - www.onlinedoctranslator.com
.
Mechanical Equipment List WUT4837A-408-01MX the first2Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

1 host Model: G6300ZC6B tower 2 17500 35000 Ningbo CSI 1. Equipped with all spare parts and

Type: four-stroke, upright six-cylinder, double-cycle

Water cooling, exhaust gas turbocharging 2. Complete the alarm according to the specification

Bore x Stroke: 300 x 380 mm point and secondary meter.

Rated power/speed: 1103 kW/500 rpm 3. Equipped with injector calibration table

Minimum fuel consumption rate: ≤195 g/kw.h set.


Oil consumption rate: ≤0.8 g/kw.h 4. A CCS certificate is required.

Average effective pressure: 1.65 MPa 5. A C1 certificate is required.

Compression ratio: 13:1, total displacement: 161 L 6. Order according to technical agreement.

Cooling method: closed circulating water cooling 7. Supporting high-pressure oil pipe leakage

Rotation direction (facing the flywheel end): Clockwise leakage protection.

Fire order: 1-5-3-6-2-4 8. Fuel: Diesel.


Start mode: compressed air start

Main accessories specifications (single machine): Starting pressure: 1.2-2.94 MPa

1.1 lubricating oil pump Flow: 24.8 m3/h, 0.34-0.44 MPa tower 1
1.2 oil pump Flow: 26.8 m3/h, 0.30-0.50 MPa tower 1
1.3 sea water pump Flow: 37.5 m3/h, head: 17.2 m tower 1
1.4 fresh water pump Flow: 37.5 m3/h, head: 17.2 m tower 1
1.5 fuel pump Flow: 1330 L/h, Pressure: 0.20 MPa tower 1 1 complete spare pump for easy installation and connection.

1.6 oil filter Model: SPL80-WX, 264 mesh/inch Only 1


.
Mechanical Equipment List WUT4837A-408-01MX the first3Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

1.7 primary fuel filter Model: SPL25-CT, 158.8 mesh/inch Only 1


1.8 fuel filter Model: SPL25-FT, 363 mesh/inch Only 1
1.9 oil cooler Type: shell and tube type, cooling area: 20 m2 Only 1
1.10 Fresh water cooler Type: shell and tube type, cooling area: 15 m2 Only 1
1.11 Host start air bottle Capacity: 500 L, 3 MPa Only 2 in total

2 High elastic coupling Model: HGT4020 Ⅲ D Only 2 699 1398 1. Hangzhou Advance Coupling has 1. Primary selection, torsional vibration meter

Rated torque: 40 KN.m limited company Determined after calculation.

Torsional stiffness: 320 KNm/rad 2. A CCS certificate is required.

Allowable speed: 1600rpm

3 Marine reduction gearbox Model: GWC42.45 tower 2 3980 7960 1. Hangzhou Advance Gearbox Set 1. Equipped with all spare parts and

Type: marine reverse clutch reduction gearbox regiment co., ltd. special tool.

Actual reduction ratio: 2.95:1 2. Dashboard beside the machine:

Transfer capacity: 2.22 KW/rpm Oil pressure gauge, slip

Rated propeller thrust: 220 KN Oil temperature gauge.

Steering: When the left machine is on the road, it is opposite to the direction of the input shaft 3. A CCS certificate is required.

The direction of the input shaft is the same when the right motor rides

Operation type: pneumatic control


.
Mechanical Equipment List WUT4837A-408-01MX the first4Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

4 Host remote control device 1. Please order according to the technical agreement. set 1 1. Anyang Shipmate Electric Co., Ltd. 1. A ship inspection certificate is required.

2. Pneumatic control - double machine and single handle. company

5 Main diesel generator set Model: CCFJ200J-Y tower 2 1960 3920 1. Zhejiang Lianda Power Equipment 1. Equipped with starting battery

limited company 4.
5.1 (diesel engine) Diesel engine model: WP12CD235E201 tower 2 1220 2440 2. Weichai Power Co., Ltd. 2. Equipped with all spare parts and

Bore x Stroke: 126 x 155 mm company special tool.

Rated power: 235 KW 3. Complete the alarm according to the specification

Rated speed: 1500 r/min and secondary instruments.

Minimum fuel consumption rate: ≤195 g/KW.h 4. A CCS certificate is required.

Oil consumption rate: ≤1.0 g/KW.h 5. Matching: high pressure oil pipe

Cooling method: closed circulating water cooling Leak protection device.

Rotation direction: counterclockwise (facing the flywheel end) 6. A C1 certificate is required.

Start mode: 24V electric start 7. With self-start function.

5.2 (dynamo) Model: SB-HW4(.D)-200 tower 2 740 1480 1. Nanchang Kangfu Technology Co., Ltd.

Rated power: 200 kW limited company

Rated voltage: 400 V

Rated current: 360.8 A

Rated frequency/speed: 50HZ /1500rpm

Power factor: cosφ=0.8 (lag)


.
Mechanical Equipment List WUT4837A-408-01MX the first5Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

6 Parking Diesel Generator Sets Model: CCFJ64J-Y tower 1 1343 1343 1. Zhejiang Lianda Power Equipment 1. Equipped with starting battery

limited company 2.
6.1 (diesel engine) Diesel engine model: WP4CD100E200 tower 1 950 950 1. Weichai Power Co., Ltd. 2. Equipped with all spare parts and

Bore x Stroke: 105 x 130 mm company special tool.

Rated power: 90 KW 3. Complete the alarm according to the specification

Rated speed: 1500 r/min and secondary instruments.

Minimum fuel consumption rate: ≤198 g/kw.h 4. A ship inspection certificate is required.

Oil consumption rate: ≤1.0 g/kw.h 5. Order according to technical agreement

Cooling method: closed circulating water cooling 6. Supporting high-pressure oil pipe leakage

Start mode: 24V electric start leakage protection.

6.2 (dynamo) Model: SB-HW4(.D)-64 tower 1 393 393 1. Nanchang Kangfu Technology Co., Ltd.

Rated power: 64 kW limited company

Rated voltage: 400 V

Rated current: 115.5 A

Rated frequency/speed: 50HZ /1500rpm

Power factor: cosφ=0.8 (lag)

7 Bilge fire main pump Model: 100CBZ-70 tower 2 270 540 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

(Centrifugal, horizontal, self-priming) Flow: 100 m3/h company 2. Motor, pump, public

Head: 70 m, NPSH: 4.0 m 2. Zhejiang Eastern Airlines Fire Pump Industry Supplied as a complete set.
.
Mechanical Equipment List WUT4837A-408-01MX the first6Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Speed: 2900 r/min limited company 3. Equipped with all spare parts and

Motor model: Y200L2-2-H special tool.

Motor power: 37 kW

Power supply: AC380V/50HZ

8 Ballast pump Model: CISG300-390 tower 2 1190 2380 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

(Vertical, Centrifugal) Flow: 720 m3/h company 2. Motor, pump, public

Head: 18 m, NPSH: 3.5 m 2. Zhejiang Eastern Airlines Fire Pump Industry Supplied as a complete set.

Speed: 980 r/min limited company 3. Equipped with all spare parts and

Motor model: Y280M-6-H special tool.

Motor power: 55 kW 4. Soft start.

Power supply: AC380V/50HZ

9 Emergency fire pump set Model: 80CWY-60 tower 1 240 240 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

(horizontal, centrifugal, self-priming) Flow: 50 m3/h company 2. The pump and the public base are assembled

Head: 60 m, suction height: 6 m 2. Zhejiang Eastern Airlines Fire Pump Industry set of supplies.

Water discharge time: ≤150 S limited company 3. Equipped with all spare parts and

Diesel engine model: KM376QC special tool.

Minimum fuel consumption rate: ≤238 g/KW.h 4. Equipped with starting battery

Oil consumption rate: ≤2.4 g/KW.h 1.


.
Mechanical Equipment List WUT4837A-408-01MX the first7Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Diesel power: 16 kW

Speed: 3500 r/min

10 Main engine seawater backup pump Model: CISG100-160A tower Each 1 181 362 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

Main unit fresh water backup pump Flow: 65.4 m3/h company 2. Motor, pump, public

(Centrifugal, vertical, direct-coupled) Head: 32 m, suction height: 5.5 m 2. Zhejiang Eastern Airlines Fire Pump Industry Supplied as a complete set.

Speed: 2900 r/min limited company 3. Equipped with all spare parts and

Motor model: Y160M1-2-H special tool.

Motor power: 11 KW

Power supply: AC380V/50HZ

11 Main engine oil backup pump Model: YCB30-0.6 tower 2 345 690 1. Huanggong Machinery Group Co., Ltd. 1. A ship inspection certificate is required.

(also pre-fuel pump) Type: External gear pump company 2. Motor, pump, public

Flow: 30 m3/h 2. Zhejiang Baiyun Pump Industry Co., Ltd. Supplied as a complete set.

Discharge pressure: 0.6 MPa company 3. Equipped with all spare parts and

Speed: 970 r/min special tool.

Motor model: Y160L-6-H

Motor power: 11 KW

Power supply: AC380V/50HZ


.
Mechanical Equipment List WUT4837A-408-01MX the first8Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

12 Gearbox oil backup pump Model: 2CY-7.5/2.5D tower 2 136 272 1. Gearbox supporting supply 1. A ship inspection certificate is required.

Form: External gear pump 2. Hangzhou Xiaoshan Dongfang Hydraulic 2. Motor, pump, public

Flow: 7.5 m3/h Pieces Ltd. Supplied as a complete set.

Pressure: 2.5 MPa 3. Equipped with all spare parts and

Speed: 1500 r/min special tool.

Motor model: Y132M-4-H

Motor power: 7.5 KW

Power supply: AC380V/50HZ

13 Diesel transfer pump Model: KCB83.3 tower 2 52 104 1. Botou Gear Pump Factory 1. A ship inspection certificate is required.

(External meshing gear pump) Flow: 5 m3/h 2. Huanggong Machinery Group 2. Motor, pump, public

Pressure: 0.33 MPa Supplied as a complete set.

Speed: 1420 r/min 3. Equipped with all spare parts and

Motor model: Y100L1-4-H special tool.

Motor power: 2.2 kW

Power supply: AC380V/50HZ

14 Sump Oil Transfer Pump Model: G35-1 tower 1 80 80 1. Botou Gear Pump Factory 1. A ship inspection certificate is required.

(horizontal single screw pump) Flow: 3.25 m3/h 2. Huanggong Machinery Group 2. Motor, pump, public

Pressure: 0.6 MPa Supplied as a complete set.


.
Mechanical Equipment List WUT4837A-408-01MX the first9Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Speed: 970 r/min 3. Equipped with all spare parts and

Motor model: Y100L-6-H special tool.

Motor power: 1.5 kW

Power supply: AC380V/50Hz

15 Domestic sewage crushing pump Model: 0.5PWF-15 tower 2 50 100 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

Flow: 5 m3/h, head: 15 m company 2. Motor, pump, public

Speed: 2840 r/min 2. Zhejiang Eastern Airlines Fire Pump Industry Supplied as a complete set.

Motor model: Y80L2-2-H limited company 3. Equipped with all spare parts and

Motor power: 1.1 kW special tool.

Power supply: AC380V/50HZ

16 Bilge jet pump Model: CP15-0.5 tower 1 14 14 1. Zhejiang Baiyun Pump Industry Co., Ltd. 1. A ship inspection certificate is required.

Flow: 15 m3/h company

Discharge height: 11 m 2. Zhejiang Eastern Airlines Fire Pump Industry

Working water consumption: 24 m3/h limited company

17 Oil Sewage Separator Model: ZYFM-B-1.0 tower 1 425 425 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Handling capacity: 1.0 m3/h Manufacturing Co., Ltd 2. Equipped with all spare parts and

Emission standard: <15 ppm 2. Taixing Hengxing Ship Design special tool.
.
Mechanical Equipment List WUT4837A-408-01MX the first10Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Matching water pump: plunger pump Equipment Manufacturing Co., Ltd. 3. Meet IMO MEPC.

Oil discharge method: manual and automatic 3. Taizhou Lanzhi Marine Equipment Resolution 107(49).

Total power: 0.8 KW Manufacturing Co., Ltd

Power supply: AC380V/50HZ

18 Domestic sewage treatment device Model: WCMBR15 tower 1 655 655 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Rated number of users: 15 people Manufacturing Co., Ltd 2. Equipped with all spare parts and

Processing capacity: 1155 L/d 2. Taixing Hengxing Ship Design special tool.

Organic load: 0.58 Kg/d BOD Equipment Manufacturing Co., Ltd. 3. Meet IMO MEPC.

Discharge water quality: suspended solids SS≤35mg/l 3. Taizhou Lanzhi Marine Equipment Resolution 227(64).

Biochemical Oxygen Demand BOD5≤25mg/l Manufacturing Co., Ltd

The number of Escherichia coli≤100/100ml

PH value: 6-8.5

Total power: 2.4 KW

19 Oil strainer Model: SBL100A Only 2 150 300 1. Zhangjiagang Shengmei Machinery Co., Ltd. 1. A ship inspection certificate is required.

Type: double metal mesh semi-automatic backwash limited company

Filter: 32 mesh/inch

Working pressure: ≤1 MPa


.
Mechanical Equipment List WUT4837A-408-01MX the first11Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

20 stationaryCO2fire extinguishing device set 1 1. Ningbo Chensheng Fire Equipment 1. A ship inspection certificate is required.

595CS05-14A-00 CS-D(14) 1) Gas cylinder set (68L/40Kg/14 bottles) Group 1 1895 1895 limited company 2. Order according to technical agreement

595CS05-14A-00 CS-D(12) 2) Gas cylinder set (68L/40Kg/12 bottles) Group 1 1635 1635 2. Ningbo Jiangbei Wanyang Xiao

DN50 595CS05-06-00 3) Pneumatic release valve (DN50) Only 1 48 48 Anti-Equipment Co., Ltd.

595CS05-01D-00 4) Remote release station (air-controlled automatic delay) Group 1


595CS05-17-00 5) Nozzle (A4-8 CB/T3294-1998) Only 9
595CS05-19-00 6) Signal called flute Only 1
595CS05-23-00 7) Pressure signal generator Only 2
595CS05-34-00 8) Back pressure valve Only 1
9) Siren Only 1
10) Weighing device set 1

twenty one Cabin Ventilator (Axial Flow) Model: CZ-75A tower 2 173 346 1. Qingdao Haishunfeng Ship Design 1. One of them is reversible

Flow: 24000 m3/h Equipment Co., Ltd. 2. Equipped with E750 CB/T4444

Full pressure: 235 Pa 2. Taixing Power Machinery Factory - 2017 vent head.

Motor speed: 1460 r/min 3. A ship inspection certificate is required.

Motor model: Y112M-4-H 4. The wall thickness of the surrounding pipe is 10.0mm.

Motor power: 4.0 kW

Power supply: AC380V/50HZ


.
Mechanical Equipment List WUT4837A-408-01MX the first12Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

twenty twoSteering engine room ventilator Model: CZ-30B tower Each 1 45 90 1. Qingdao Haishunfeng Ship Design 1. A ship inspection certificate is required.

Channel ventilator Form: Marine axial flow fan Equipment Co., Ltd. 2. With C300 CB/T4444

Air volume: 1200m3/h 2. Taixing Power Machinery Factory - 2017 vent head.

Full pressure: 240 Pa

Motor Model: Y801-2-H

Speed: 2920r/min

Motor power: 0.75 kW

Power supply: AC380V/50HZ

Marine axial flow fan


twenty three Model: CWZ-200G (Type II) tower 6 14.3 85.8 1. Qingdao Haishunfeng Ship Design 1. A ship inspection certificate is required.

Bathroom ventilator (4 sets) Air volume: 920 m3/h Equipment Co., Ltd.

Kitchen ventilator (1 set) Full pressure: 140 Pa (mmH2O) 2. Taixing Power Machinery Factory

CO2Room (1 unit) Motor model: AO2-5022

Power: 0.06KW, speed: 2800 r/min

Power supply: AC380V/50HZ

twenty fourExplosion-proof fan between batteries Model: CBL-15 tower 1 34 34 1. Qingdao Haishunfeng Ship Design 1. A ship inspection certificate is required.

Air volume: 800 m3/h Equipment Co., Ltd. 2. Equipped with electrical control box.

Full pressure: 540 Pa (mmH2O) 2. Taixing Power Machinery Factory 3. Fan explosion-proof grade:

Motor model: YB80L1-2-H Ex dⅡCT1


.
Mechanical Equipment List WUT4837A-408-01MX the first13Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Power: 0.75KW, speed: 2920 r/min

Power supply: AC380V/50HZ

25 Whistle and miscellaneous air cylinders Model: A0.16-1 Only Each 1 135 270 1. Qingdao Lianda Machinery Manufacturing 1. A ship inspection certificate is required.

control air bottle Capacity: 0.16 m3 limited company

Working pressure: 1 MPa

26 Air compressor (air cooling) Model: CZ-20/30F tower 2 144 288 1. Jiangyan Marine Machinery Factory 1. A ship inspection certificate is required.

Displacement: 20 m3/h 2. Ningbo Tianli Air Compressor has 2. Supporting motor and control

Rated exhaust pressure: 3 Mpa limited company box.


Motor model: Y132S-4-H

Motor speed: 1440 r/min

Motor power: 5.5 kW

Power supply: AC380V/50HZ

27 Assembled fresh water pressure tank Model: ZYG-0.3 CB/T4482-2018 tower 1 430 430 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Working pressure: 0.4 Mpa Equipment Manufacturing Co., Ltd. 2. Supporting water pump and control

Volume: 0.3 m3 2. Taixing Hengxing Ship Design box and common base.

Matching water pump model: 1.5CWX-2 tower 2 Equipment Manufacturing Co., Ltd.

Flow: 3 m3/h
.
Mechanical Equipment List WUT4837A-408-01MX the first14Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Head: 40 m, NPSH: 4 m
Motor model: Y90L-2-H

Motor power: 2.2 KW

Power supply: AC380V/50HZ

28 Assembled seawater pressure tank Model: ZYG-0.3 CB/T4482-2018 tower 1 430 430 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Working pressure: 0.4 Mpa Equipment Manufacturing Co., Ltd. 2. Supporting water pump and control

Volume: 0.3 m3 2. Taixing Hengxing Ship Design box and common base.

Matching water pump model: 1.5CWX-2 tower 2 Equipment Manufacturing Co., Ltd.

Flow: 3 m3/h
Head: 40 m, NPSH: 4 m
Motor model: Y90L-2-H

Motor power: 2.2 KW

Power supply: AC380V/50HZ

29 Electric heating hot water tank Model: DRG-0.3 CB/T4260-2013 tower 1 300 300 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Working pressure: 0.4 Mpa Equipment Manufacturing Co., Ltd. 2. Supporting water pump and control

Volume: 0.3 m3 2. Taixing Hengxing Ship Design box and common base.

Heating water volume: 360 Kg/h Equipment Manufacturing Co., Ltd.

Electric power: 24 KW
.
Mechanical Equipment List WUT4837A-408-01MX the first15Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Power supply: AC380V/50HZ

Matching hot water circulating pump Model: 1WZ-0.9 tower 1


Flow: 1 m3/h
Head: 37 m, NPSH: 4 m
Motor model: Y90L-4-H

Motor power: 1.5 KW

Power supply: AC380V/50HZ

30 Pneumatic quick closing valve control box Model: CRD-U5-50L set 1 240 240 1. Wuhan Xingda Electromechanical Equipment 1. A ship inspection certificate is required.

Working pressure: 1.0 MPa Equipment Manufacturing Co., Ltd.

Control gas path: five-way

Matching: 50L air bottle

31 foam fire extinguisher Model: MSZ/9 Only 2 8.5 17 1. Qingdao Loushan Fire Equipment 1. For the cabin.

Capacity: 9 L factory

32 dry powder fire extinguisher Model: MFZ/ABC5 Only 2 6.5 13 1. Qingdao Loushan Fire Equipment 1. For the cabin.

Capacity: 5 kg factory

33 Large Foam Fire Extinguisher Model: MSTZ/45 tower 1 85 85 1. Qingdao Loushan Fire Equipment 1. For the cabin.
.
Mechanical Equipment List WUT4837A-408-01MX the first16Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Capacity: 45L factory

34 Portable Air Foam Gun Model: PQ8.C set 1 1. Dongtai Oriental Ship Equipment 1. For the cabin.

Mixed liquid volume: 400 L/min Distribution Co., Ltd.

Foam volume: 1.5 m3/min

35 Cabin emergency escape breathing apparatus Model: THDF-10Ⅰ Tool 3 6 18 1. Dongtai Oriental Ship Equipment 1. A ship inspection certificate is required.

Air bottle volume: 2.2 L Distribution Co., Ltd.

Rated storage pressure: 21 MPa

Continuous use time: 10m in

36 Turntable Vise Model: QB/T 1558.2-92 tower 1 15 15 1. Market purchase

Jaw width: 125mm

37 Straight grinder Model: S3SL-200 tower 1 20 20 1. Shanghai Grinding Machine Factory 1. Complete the accessories.

Grinding wheel specification:-200mm×2

(one for each grinding wheel)

Motor power: 0.5 kW

Motor speed: 2800 r/min

Power supply: 380V/50Hz


.
Mechanical Equipment List WUT4837A-408-01MX the first17Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

38 Bench drill press Model: Z512-2 tower 1 80 80 1. Market purchase

Maximum drilling diameter: Φ12.7mm

Motor power: 0.37kW

39 chain hoist Model: HM-C Only 2 18 36 1. Hangzhou Wulin Machinery Factory 1. For the cabin.

Lifting capacity: 980 kg

40 dry silencer Model:VTJZ-300 Only 2 495 990 1. Taizhou Hengxing Ship Engineering Co., Ltd. 1. A ship inspection certificate is required.

(host) Diameter: 300 mm Equipment Manufacturing Co., Ltd.

Cancellation level: 25 dB

41 dry silencer Model:VTJZ-200 Only 2 246 492 1. Taizhou Hengxing Ship Engineering Co., Ltd. 1. A ship inspection certificate is required.

(Main generator set diesel engine) Diameter: 200 mm Equipment Manufacturing Co., Ltd.

Cancellation level: 25 dB

42 dry silencer Model: VTJZ-80 Only 1 85 85 1. Taizhou Hengxing Ship Engineering Co., Ltd. 1. A ship inspection certificate is required.

(parking generator set diesel engine) Diameter: 80 mm Equipment Manufacturing Co., Ltd.

Cancellation level: 25 dB

43 Marine flange cast steel sea valve Model: BS4500 GB/T2029-2008 Only 1 550.9 550.9 1. Taizhou Jiyuan Marine Attachment 1. Engine room seawater main.
.
Mechanical Equipment List WUT4837A-408-01MX the first18Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Diameter: 500 mm Pieces Ltd. 2. A ship inspection certificate is required.

Pressure: 0.4 MPa 2. Yueqing Marine Valve Factory

44 Marine flange cast steel gate valve Model: AS4500 CB/T466-1995 Only 3 627.4 1882.2 1. Taizhou Jiyuan Marine Attachment 1. For seawater mains.

Diameter: 500 mm Pieces Ltd. 2. A ship inspection certificate is required.

Pressure: 0.4 MPa 2. Yueqing Marine Valve Factory

45 Suction coarse water filter Model: AS500 CB/T497-2012 Only 2 760 1520 1. Taizhou Jiyuan Marine Attachment 1. For seawater mains.

Diameter: 500 mm Pieces Ltd. 2. A ship inspection certificate is required.

Nominal pressure: 0.1 MPa 2. Yueqing Marine Valve Factory

46 Marine flange cast steel sea valve Model: BS4100 GB/T2029-2008 Only 1 25.7 25.7 1. Taizhou Jiyuan Marine Attachment 1. For emergency fire pump room.

Diameter: 100 mm Pieces Ltd. 2. A ship inspection certificate is required.

Pressure: 0.4 MPa 2. Yueqing Marine Valve Factory

47 Marine flange cast steel gate valve Model: AS10100 CB/T466-1995 Only 1 41.2 41.2 1. Taizhou Jiyuan Marine Attachment 1. For emergency fire pump room.

Diameter: 100 mm Pieces Ltd. 2. A ship inspection certificate is required.

Pressure: 1.0 Mpa 2. Yueqing Marine Valve Factory

48 Suction coarse water filter Model: AS100 CB/T497-2012 Only 1 38.4 38.4 1. Taizhou Jiyuan Marine Attachment 1. For emergency fire pump room.
.
Mechanical Equipment List WUT4837A-408-01MX the first19Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Diameter: 100 mm Pieces Ltd. 2. A ship inspection certificate is required.

Nominal pressure: 0.1 MPa 2. Yueqing Marine Valve Factory

49 Shaft accessories:

front seal Model: SM-290 Only 2 1. Jiangsu Dolphin Marine Machinery 1. Order according to the drawing.

limited company 2. A ship inspection certificate is required.

rear bearing Model: φ315×φ275×700 Only 2 1. Jiangsu Dolphin Marine Machinery 1. Order according to the drawing.

front bearing Model: φ310×φ270×300 Only 2 limited company 2. A ship inspection certificate is required.

stern shaft Basic shaft diameter: 230 mm, L≈5115 mm root 2 1. Manufacturer customized, 35# steel 1. A ship inspection certificate is required.

1# Intermediate shaft Basic shaft diameter: 190 mm, L≈5060 mm root 2 1. Manufacturer customized, 35# steel 1. A ship inspection certificate is required.

2# Intermediate shaft Basic shaft diameter: 190 mm, L≈4935 mm root 2 1. Manufacturer customized, 35# steel 1. A ship inspection certificate is required.

stern tube Anterior segment L≈405 mm, posterior segment L≈870 mm, Only 2 1. Manufacturer customized, ZG200-400 1. A ship inspection certificate is required.

Detachable coupling L≈445mm Only 2 1. Manufacturer customized, 35# steel 1. A ship inspection certificate is required.

50 Hydraulic steering gear (double rudder fork type) Model: YDC2-2K125 set 1 1. Taizhou Yuanchang Marine Engine 1. Equipped with all spare parts and

Nominal torque: 125 KN.M Machinery Co., Ltd. special tool.

Working pressure: 10.0 Mpa 2. A ship inspection certificate is required.

Full rudder angle: ±35°

Motor model: Y132M-4-H

Motor power: 7.5 kW


.
Mechanical Equipment List WUT4837A-408-01MX the first20Page.

Single total
serial number Drawing number or model Name and specification unit quantity manufacturing unit attached Note
Weight(Kg)

Power supply: AC380V/50HZ


LOA
loa
waterline length
LBP
beam
depth
draft

You might also like