Final Activities
Follow a similar format to the previous activities. Include in your estimate all the materials indicated in
the plan.
Name: ___________________ Date: ________________
Section: ________
ACTIVITY NO. 5 – REBAR FOR BEAMS, SLABS, STAIRS, AND OTHER STRUCTURAL AND
NON-STRUCTURAL ELEMENTS
CEP 381C: Quantity Surveying Computation
Problem:
Estimate the reinforcement for beams, slabs, stairs, and other structural and non-structural elements
required for your residential building plan. Use only Grade 33 rebar and 6.0m rebar length for all structural
elements.
Computation:
Total
17.0 Suspended Slab
Total
18.0 Grade/Tie Beam
Main Rebar
Stirrups
Total
19.0 Second Floor Beam
Main Rebar
Stirrups
Total
20.0 Roof Beam
Main Rebar
Stirrups
Total
21.0 Stairs
Total
Summary:
Item
Scope / Item Description Unit Quantity Remarks
No.
16.0 Slab on Grade
16.1 10mmɸ pcs
16.2 #16 GI Tie Wire kg.
17.0 Suspended Slab
17.1 10mmɸ pcs
17.2 #16 GI Tie Wire kg.
18.0 Grade/Tie Beam
18.1 16mmɸ pcs
18.2 12mmɸ pcs
18.3 10mmɸ pcs
18.4 #16 GI Tie Wire kg.
19.0 Second Floor Beam
19.1 16mmɸ pcs
19.2 12mmɸ pcs
19.3 10mmɸ pcs
19.4 #16 GI Tie Wire kg.
20.0 Roof Beam
20.1 16mmɸ pcs
20.2 12mmɸ pcs
20.3 10mmɸ pcs
20.4 #16 GI Tie Wire kg.
21.0 Stair
21.1 16mmɸ pcs
21.2 12mmɸ pcs
21.3 10mmɸ pcs
21.4 #16 GI Tie Wire kg.
Note:
• Add the scope of work or item required to your plan that is not listed in the format; the
item numbering may be changed as per the project requirements.
• Indicate in the remarks the allowances used and the equivalent weight in kilograms of
each rebar item.
• List in bullet form the assumptions used after the summary table, if there are any,