TECHNICAL AFFAIRS ‫الفنية‬ ‫الشؤون‬

DATE:
TELEFAX MESSAGE 15/03/2020 TOTAL PAGES: 1

To: M/s. All Contractors & Consultants


Fax:
(KM and Non-KM)
Our Ref.:
For the Attention of : General Manager
TW/TWM/2226/2020

Project: All Projects


SUBJECT: REQUIRED DOCUMENTS FOR WORK COMPLETION REPORT FOR
WATER WORKS
With reference to the above mentioned subject, please be informed that the following
37
supporting documents are required in order to proceed with Work Completion Report to

o5
Kahramaa Water Operations Section.

 Copy of approved IR of Pressure Test.

N
 Copy of approved As-Built Drawings (Auto-Cad format in CD & hard copy) or CD

yE
contains Auto-Cad information of commissioned lines.
 Copy of compliant Water Sample result.
 Copy of all related Shut Down Requests (SORs), if any.

44
 Original WCR with complete details.
Please note that any WCR without all above-mentioned documents shall not be acted upon
by us and will be returned to the sender accordingly.

This is for your information and required action.


G1
Nr
Regards,

0
MOHAMMED SALEM AL MANSOORI
MANAGER, WATER PROJECTS DEPT.
CC: All KM and Non-KM contractors and Consultants
Ref.: WTS/WO/221/2020 dated 05/03/2020.

Disclaimer: this fax and any attachments may contain information which is confidential. They should not be distributed. Disclosed or
copied to anyone without the approval of the sender. If you are not one of the intended recipients of this fax, any attachments, and copies,
please notify the sender by e-mail or fax or telephone. Confidentiality is not waived or lost by mistaken communication.
Tele: (974) 4484 5330 - Fax: (974) 44845353 44845353 : ‫) – فاكس‬974(44845330 : ‫تليفون‬
P O BOX 41, DOHA - QATAR. ‫ الدوحة – قطـر‬41 : ‫ ب‬.‫ص‬

Page 1 of 1

You might also like