Quality Checklist For Site Works: #Unknown!

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

#UNKNOWN!

QUALITY CHECKLIST FOR SITE WORKS

21 TILES TASK
1ST FLOOR

ARCHITECTURAL STRUCTURAL INTERIOR SERVICES & UTILITY

EXTRIOR

Building Unit Designation Name: Project ID:


Name of the Contractor Group: Location:
Construction Drawing Ref. No.: Quantity:

CL : 21-A
YES NO NA
Sl.No. Description
x Is format CL:20-A for Ceiling works complied with?
1 Pre Execution Checks:
2 Are the latest IFC drawings available at site?
3 Cleaning and surface preparation for tiling has been completed.
4 Check the availability of clearance/approval from MEP Engineer to start the work.
5 Check the availability of clearance/approval from MEP Engineer to proceed tiling works.
6 The tile name and tile code number to be used for that particular area of work is correct.
7 Are the required tools available for the work.
8 Is the quantity of tiles required to complete the work available.
9 During Execution Checks:
10 Are the tile laying pattern, specifications and tile grout color according to approved IFC drawing?
11 Method -1-
12 Is the consistency of spread mortar within the recommended limits?
13 Is the cement adhesive being used up within its design mix ratio?
14 Is the freshly laid tiles are installed correctly, is there any tilting or corners settlement?
15 Method -2-
16 Is the open life of spread adhesive exceeding the recommended limits?
17 Is the tile adhesive being used up within its pot life?
18 Is the freshly laid tiles are tapped gently, is there any settlement?
19 Post Execution Checks:
20 The name of tile mason and date of completion displayed on the finished tile surface.
21 Are the joints properly aligned?
22 Excessive adhesive / cement coming out of tile joints have been cleaned properly.
23 Screed for Floor Tiling Work
24 The surface on which screed to be laid made moist, free from dust and other contaminations.
25 Are there any undulations observed in surface level?
26 Button marks / height indicators fixed properly.
27 Side runners have been placed as per requirements.
28 Screeding is carried out in presence of Engineer.
29 The sequence of concreting well planned and sufficient labors deployed.
30 The screed for floor tiling done as per the slope and level requirements.
31 Checking of the level of finish for the tiles done when the screed is fresh, so as to make necessary corrections.

CORRECTIVE ACTION PROPOSED- Item wise.


If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)
Comments:

Contractor's Rep.: Client Rep.: Lines & Visions Int. Rep.:

You might also like