Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

PROJECT PLANNING AND DEVELOPMENT APPLICATION

STUDENT ACTIVITY: Project Plan

Instructions:

1. Each student should develop/write an Assumed Project Plan that will guide the student
in the implementation of his /her chosen assumed project as part of the community
extension program. The student should use the provided template for the project plan.
(See the template provided)
2. After the plan is completed, he / she should video record his/ her presentation of the
project plan. The video must be within 3- 6 minutes. The face must be visible as the
student presents the project plan. Kindly include, as well, your learnings or insights as
you prepare for the project plan.
3. The project plan of the students is collected through submission on Google Classroom
classwork. The students should INDIVIDUALLY attach the copy of the project plan and
his/her video record of the presentation of the plan.
4. The students will be graded based on their output for the Project Plan using the criteria
provided.

Evaluation Criteria Project Plan

Criteria

Project Details and Project Breakdown (50%)

Organization (30%)

Grammar & Mechanics (20%)

Total 100%

Page 1 | 4
NOTRE DAME UNIVERSITY
National Service Training Program
Cotabato City, 9600, Philippine

PROJECT PLAN

Name of Student: Almanzur S. Bagundang


Title of Project: Construction and Rehabilitation of drainage system
Goals: prevents a decrease in the productivity of arable land due to rising water tables and the accumulation of salts in the root zone.
It is the only technique to restore land that has been rendered unusable owing to waterlogging and salinity issues.

Area of Objectives Strategies Person Time Frame Budget Expected


Concern Involved Outcome

Barangay Rh 3 To The Project 12,127 residents This project has 1,000,000php Flood damage to
Cotabato city, extend/expand Implementation of Barangay RH 2 months to be buildings and
Philippines the enhanced Unit will be in 3, Cotabato city completed agricultural
drainage facility charge of the products will be
along Barangay flood control reduced as a
Rh 3's highway project's result of the
implementation, project, which
monitoring, and will benefit the
evaluation. community. Even
amid heavy
rains, residents
and motorists
are kept safe
and comfortable.

Prepared by:

_____________________
Page 1 | 4
Name of the student

Page 2 | 4

You might also like