Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
2 Site conditions
55
1. Design maximum ambient temperature °C 55.0
environmental conditions
10. Type of transformer - Three phase, core or shell type, Three phase, core
type, mineral oil
mineral oil filled auto-transformer filled auto-transformer
with delta connected tertiary with delta connected
tertiary (stabilizing)
(stabilizing) winding housed in a winding housed in a
single tank. single tank
Dubai Electricity & Water Authority Page 1 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
4. LV A Specify 2186.9
Dubai Electricity & Water Authority Page 2 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
11 Auxiliary loss - - -
1. Cooling fan loss excluding standby kW Specify 19
(maximum)
(maximum)
Dubai Electricity & Water Authority Page 3 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS Please remove "Reference" text.
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
(For Reference)
19 Loading beyond name plating rating (large - As per IEC 60076-7 (all types of 1. Long-time
*Ambient : 35 Deg
power transformer category) loading)
*Pre-load : 100%
1. Overloading Characteristic with varying - For reference *Overloading : 130%
2. Short-time
ambient, load and duration to be provided with *Ambient : 35 Deg
*Pre-load : 100%
calculation *Overloading : 150%
2. Full load with Fan and Pumps running dBA Information 91(For reference)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
switch
ground
12. Change over selector recovery voltage kV Specify 35kV rms
Dubai Electricity & Water Authority Page 5 of 18 Tender RFX No.: 21323000xx
"100.0030.345.920 / 4.1.2"
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
23 Magnetic core - - -
clamping structure?
clamping parts?
Dubai Electricity & Water Authority Page 6 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
2
3. HV regulating winding (fine) A/mm Specify Max. 3
2. Total volume of the conservator- main tank l Shall be approximately 10% of the 12,000
volume of oil in the tank
3. Volume of oil in main conservator between l Specify 8,280
MIN and MAX levels – main tank
4. Total volume of the conservator- OLTC l 250.0 (approx.) 250
5. Total volume of oil in the conservator l Shall be sufficient NOT to 230
between MIN and MAX levels – OLTC
generate MIN alarm signal during
periodic oil sampling
31 ** Mass schedule - - -
Dubai Electricity & Water Authority Page 7 of 18 Tender RFX No.: 21323000xx
It can be slightly changed after detailed design.
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
5. Type of the oil used for active part - Specify Uninhibited type
impregnation and factory testing.
6. If offered in A32.5 is different from A32.3, - Test report to be furnished Yes(Miscibility report
compatibility and mix-ability of the test oil will be provided)
with actual oil shall be proved by necessary
test
33 Short circuit withstand requirement. - - -
1. Brief description of transformer subjected to - Test reference and/ or calculation Please refer to the
short-circuit test or for which short-circuit Attachment#1.
calculations are available. required
2. Thermal / dynamic withstand capability of - Must be proved by necessary Please refer to the
the offered transformer. Attachment#2.
calculation.
34 For below items, refer specification, relevant IEC or other International Standards. Voltage / Current Rating shall be
commensurate with the specific application. Items shall be offered from approved vendor list. New makes are acceptable
subject to approval separately. Type and features shall be agreed separately. Where items NOT Applicable Mark “NA”
or “-“. The Country Of Origin including sub-assembly items shall be from Western Europe or Japan or other DEWA
Oil Miscibility report shall be
approved origin.
attached.
A. HV bushing Unit Required Offered
1. Manufacturer - Specify HSP
Dubai Electricity & Water Authority Page 8 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
As per IEC 60137, Current rating of 1200 A is
not availble. And as per checklist point 3.1.9.5,
(To be Completed and Signed by the Tenderer)
the current shall be as per IEC. Please clarify
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
10. Coating of SF6 end terminal (Sn or Ag) - Specify Ag (Silver plated)
12. Type of test tap - (non-self earthing preferred) Non-self earthing type
duration
B. LV bushing
1. Manufacturer - Specify HSP
Dubai Electricity & Water Authority Page 9 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
10. Coating of SF6 end terminals (Sn or Ag) - Specify Ag (Silver plated)
12. Type of test tap - (non-self earthing preferred) Non-self earthing type
C. HVN bushing
1. Manufacturer - Specify HSP
12. Coating of air end terminal (Sn or Ag) - Specify Ag (Silver plated)
14. Type of test tap - (non-self earthing preferred) Non-self earthing type
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
duration
21. Cantilever strength kN Specify 4kN
duration
19. Cantilever strength kN Specify 3.15kN
35 For below items, refer specification and relevant IEC or other International Standards. Items shall be offered from
approved vendor list. New makes are acceptable subject to approval separately. The country of origin including sub-
assembly items shall be from Western Europe or Japan or other DEWA approved Origin. Type and features shall be
agreed separately. Where items NOT applicable mark “NA” or “-“.
Dubai Electricity & Water Authority Page 11 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
Dubai Electricity & Water Authority Page 12 of 18 Tender RFX No.: 21323000xx
VOLUME IV
SCHEDULE B3
TECHNICAL PARTICULARS AND GUARANTEES
B3.4 – 400/132 kV TRANSFORMERS
(To be Completed and Signed by the Tenderer)
AG PCS, UAE
Part-1: Major technical particulars and guarantees (Items to be fully completed for tender submission)
Comemnts :
1) Kindly note that the submitted GTP is incomplete, pg. no 14 to 18 is missing and same shall be provided.
2) Oil Miscibility report is missing and same shall be attached.
3) HYOSUNG Letter for FAT testing insulating oil shall be attached.