Professional Documents
Culture Documents
Wa0003.
Wa0003.
c) Removing of Debris Out side the society area 9.0 lorry 6000.0 54000.0
6 Removing existing temporary roof L.S 50000.0
Total 903,535.00
Add GST 18% 162,636.30
Total Including Taxes 1,066,171.30
Thanking You.
Yours faithfully
S.B.CONSTRUCTION
.