Package: "Execution of Civil Works for WTG Foundation & Unit Substation (USS)" for Khavda Hybrid Renewable Power Project at R
(RE) Park, Near Karimshahi, Vighakot Road (50 km from India Bridge), Khavda – 370510, Kachchh – Gujarat.
USS As BOQ
UO
Sr. No. Item Description
M Qty. for USS
Excavation of earth for WTG machine foundations, trenches, pipe lines, etc. including
setting out, clearing & grubbing, removal of debris, dewatering if required, strutting,
shoring, if required (sheet piling not required), dressing the sides, leveling to grade and
ramming the bottom, stacking/ disposal of surplus excavated material within an initial
lead of 1 km (Radial distance) including respective lifts, loading, transporting,
unloading and spreading with all machinery, manpower, tools & tackles, fuel,
1.00 consumables etc. complete as per Drawings, Specifications and instruction of Engineer
in Charge for the following:
(Execution shall be as per approved excavation plan as per Site requirement. Mode of
measurement shall be PCC dimension of individual footings [i.e. authorized Length &
Width] & depth up to bottom of PCC, as indicated in the Construction Drawing. No
additional payment shall be made for excavation carried out for surrounding working
space and side protection slope.)
All types of soils including, laterite, morrum and weathered rock which can be
1.01 excavated by means of mechanical excavator (but does not require crow bar, pick axe,
chiseling or blasting)
a Up to 1.50M from GL Cum 25.20
Disposal of surplus excavated material beyond 1.0 Km, for every 0.50 Km lead
1.02 Cum Rate Only
(over and above Item no. 1.00)
Transportation of Selected Earth/ soil for Backfilling beyond 1.0km, for every 0.50
2.01 Cum
Km lead (over and above Item no. 2.00)
Filling with selected earth/ morrum/ material bought from approved borrow
areas outside the Site and arranged by the Contractor, for under floors, in foundation
and plinths which includes excavation, loading, transporting for all leads, unloading,
spreading in layers of 30 cm compacted thickness at all depths, watering, compaction
3.00 Cum Rate Only
by manual or mechanical means to minimum 95% of proctor density, dressing and
levelling including all machinery, manpower, tools & tackles, fuel, consumables,
taxes, royalty, screening, etc. complete as per Drawings, technical specifications and
instruction of Engineer in Charge.
De-watering:
Providing services for dewatering using 5- 10 HP capacity diesel pumps depending on
the quantity of discharge of water, required pumping motor with specified
4.00 required/design horse power including providing suction & delivery pipe, foot valve, Hrs. -
fuel & required consumables, all tools and tackles, loading and unloading, shifting,
transportation, manpower etc. all complete as per specifications, details, and/or as
directed by EIC.
Stone Blanket:
Providing and Laying of Stone blanket of 500 mm thickness in 2 layers using
approved quality stone aggregate conforming to IS 383 below finished ground floor
level, below foundation level, hand packing, thoroughly compacting in layers by
5.00 MT -
means of rollers (Small bobcat– Min 3 MT), dressing and levelling including all
machinery, manpower, tools & tackles, fuel, consumables etc. complete as per
Drawings, Specifications and instruction of Engineer in Charge. Gradation of Stone
aggregate shall be as per the QA requirement & as directed by Engineer in Charge.
Loading, unloading, transportation from stores and fixing in position High yield
strength deformed reinforcement steel bar conforming to IS:1786 for foundation &
pedestal work, including handling, decoiling wherever necessary, cleaning, cutting
tack welding lap joint in longitudinal bars, straightening, carting, bending to shapes
6.00 and length as per details, supplying and binding with 16 SWG one strand/ 18 SWG
two strand/ 20 SWG three strand binding wire to the longitudinal bars, etc. complete
for all depths as per specification and as directed by the Engineer-in-charge.
Cut and bend Reinforcement Steel bar for WTG foundation shall be free issue to
the Bidder.
High yield strength deformed bars conforming to grade Fe 500D CRS of IS :1786
Laying/ pouring of Ready Mix Concrete (RMC) of any Grade (RCC) into the
WTG foundation & pedestal, other structures of USS incl. Precast cover etc. using
boom placer (wherever required) at all heights / depths, any shape, any position,
thickness including pouring, vibrating, finishing the surface smooth, curing etc. all
7.00 Cum 25.99
complete as per specification, QA requirement, drawings and direction of Employer's
Project Manager. Cost of all material, Tools & tackles, labour, supervision, boom
placer (wherever required), etc. shall be in the scope of Bidder.
Note: Ready Mix Concrete (RMC) shall be Free Issue Material from Employer.
Laying/ Pouring of Ready Mix Concrete (RMC) of any Grade for PCC using
boom placer (wherever required) as levelling course/ fill around foundations, pipes,
floors on grade, water retaining structures, equipment foundations, under foundations,
8.00 flooring under bed, etc. including formwork, scaffolding & staging, materials, Cum 3.20
manpower, Tools & tackles, Consumables, curing etc. all complete as per
specification, drawings and direction of Engineer In Charge.
Note: Ready Mix Concrete (RMC) shall be Free Issue Material from Employer.
Providing and laying of Plum Plain Cement Concrete (Plum PCC): Mix 1:3:6
The plum Concrete ratio shall be 40/60, 40% plums (Boulders), and 60% concrete.
Plums of 75mm to 150mm size shall be used for concrete works. The stones should be
9.00 Cum 13.29
spread evenly and should not be denser than 150mm from surface.
Note: Ready Mix Concrete (RMC) of Mix 1:3:6 shall be Free Issue Material to
Bidder from Employer, however Plum (boulders) shall be in the scope of Bidder.
Providing, fixing and removing formwork at all elevations including providing all
materials, labours, equipment's, consumables, scaffolding, staging, providing pockets,
10.00
etc. complete as per specifications, drawings and as directed & approved by engineer
in charge for the following :
Formwork using steel below finished ground floor level for all types of foundations
a) including up to Raft Top Level, footings, bases of columns, walls, pedestals, beams, Sqm 15.00
mass concrete trenches etc.
Formwork using steel above finished ground floor level for columns, beams,
b) suspended floors, roofs, lintels, cantilevers, staircases, landings, balconies, domes, Sqm 150.00
arches etc. for all heights.
Grouting:
Providing and Laying of Low shrinkage grout with a minimum resistance of C90/105
including roughening surface, cleaning with compressed air, wetting the surface for
several hours, removing accumulated water, curing etc. complete, as per specification
12.00 and as directed by the Engineer In Charge. Cum 0.10
Approved Product: Fosroc-Conbextra BB 92-O/ BASF-Master flow 9375 IN/Sika
Grout 3200 IN.
Note: Low shrinkage grout with a minimum resistance of C90/105 shall be used for
the grout layer
Providing and supplying of sealing material for joints including cleaning the
surface with compressed air, groove cutting etc. complete, as per specification and as
13.00 directed by the Engineer In Charge. KG
Approved Product: Fosroc Thioflex 600 GG/ Sika Polysulphide Gun Grade (AB) IN/
MasterSeal PG 477
Supply, laying, fitting & fixing of Double Walled Corrugated (DWC) HDPE pipe
in to WTG foundation, pedestal & USS including all required bends, junctions,
sockets, adapters, caulking, and all other necessary fittings items at all elevations etc.,
14.00 complete as per drawings, specifications and as directed by the Engineer In-Charge. RMT
Pipe Diameter 175 mm OD / 146 mm ID, Orange One End Coupler with O Ring with
Rodent repellent and NFP Properties, Astral Telerex, Type 750N Compressive
Strength (Part No. A111175C0006E)
Providing and laying non-pressure RCC pipes, confirming to IS:458, at all levels,
for all kind of work, collar joined with stiff mixture of Cement Mortar 1:2 (1 Cement :
2 Sand), including providing, laying, installation and jointing of pipes and fittings,
16.00 with all labour, material, equipment, testing etc., all complete, as per specifications, RMT 3.00
drawings and instructions of the Employer's Project Manager. (Excavation, Bedding
and Backfilling shall be paid separately under relevant items).
Pipe with 150 mm NB, class NP3
Supply, laying, fitting & fixing of Double Walled Corrugated (DWC) pipe in USS
including all required bends, junctions, sockets, adapters, caulking, and all other
necessary fittings items at all elevations etc., complete as per drawings, specifications
17.00 RMT 20.00
and as directed by the Engineer In-Charge.
Pipe Diameter 400 mm PE DWC Pipe (6 Mtr) SN 8, Plain With One Coupler and 2
Rubber Ring Drainage Rodent Repellent, Make: Astral D-Rex
Providing and laying uniformly graded machine crushed stone aggregate of size
40mm in confined area.
Providing and laying uniformly graded machine crushed stone aggregate of size 40mm
20.00 Cum 9.00
in Transformer yard & Switch yard area including spreading & leveling to the required
elevations including all machinery, manpower, tools & tackles, fuel, consumables etc.
complete as per Drawings, Specifications and instruction of Engineer in Charge.
Providing, Supply and installing Galvanized Steel Gate with Box/pipe section
(Single leaf)
Supplying, fabricating and installing gates built with galvanized steel tube
(conforming to IS 1161) frames including providing box/pipe section of rolled steel,
27.00 MT 0.25
channels for posts, hinges, bottom rollers, guide tracks, welded wire fabric (3.15mm
wire, 50 mm square mesh size), locking arrangements, handles, stoppers, pins etc. all
galvanized as per drawing, specification and as per direction of Engineer in charge.
Gate with Single leaf
Concrete block masonry:
Supplying and laying in position concrete block work of designation D (as mentioned
in IS 2185), minimum compressive strength of 5MPa, in cement-sand mortar 1:4 (1
cement: 4 sand), in sub structure, in foundation and plinth of Size 400x200x150mm,
28.00 Cum 1.80
including mixing mortar, laying bricks, raking joints, curing etc. with all materials,
labour complete as per drawings and specification etc. all complete as approved by the
Project manager.
Cement (for Masonry work only) shall be free issue to the Contractor.
10.00
1,465.00 -
350.00 - 0 0
1,260.00 - 0 -
7,000.00 -
450.00 6,750
8,500.00 -
635.00 -
335.00 -
750.00 2,250 0
2,175.00 43,500 0
3,800.00
725.00 22,475 23 16,675.00
125,000.00 357,500 0 -
1,687,766 344,107
303,798 61,939.32
1,991,564 406,046.65
Measurement sheet
A HT Pannel Slab
Sr.No Description of Item Unit No Nos L B H/D Quantity Remarks
1 Shuttering Work M2
Column
Tie Beam M2
Slab Beam
Slab
Deduction
12.870
0.429
13.299
Sr.No Description Unit Nos Lt Wt Depth Qty
4 Structural Steel
a. Insert Plates kg 22 0.07 0.07 47.1 5.07738
b. channel kg 2 1.8 16.8 60.48
c. Insert Plate kg 4 0.2 0.2 94.2 15.072
d. Angles kg 6 0.2 4.5 5.4
Total Qty 86.02938
TOTAL
Measurement sheet
Sr.No Description of Item Unit No Nos L B H/D
Excavation from 1.5mts to 3.00
1 M3
mts depth
plum concrete under
1 1 2.600 2.400 0.650
Transformer Foundation
Burnt oil pit 1 1 3.250 3.250 0.275
TOTAL
Quantity Remarks
9.360
15.844
25.204
Quantity Remarks
4.056
2.905
6.961
Civil Work WTG Foundation
Measurement sheet
A HT pannel
Sr.No Description of Item Unit No Nos L B H/D Quantity Remarks
1 Shuttering Work M2
Column
Tie Beam M2
USS Tie Beam TB2 Shorter side 3 1 1.620 0.300 0.300 0.437
USS Tie Beam TB2 Longer side 2 1 1.825 0.300 0.300 0.328
2 1 2.075 0.300 0.300 0.374
Slab Beam
Slab
Deduction
Slab short C
19 Bottom 100
direction A B
Slab short C
20 Top 100
direction A B
Section A
Section D
OPTION-1
Section A
A B
54 Short- Column Main Reinf 300
C
A B
58 middle- Column Main Reinf 300
C
A B
59 middle- Column Main Reinf 300
C
A B
62 long- Column Main Reinf 300
C
A B
63 long- Column Main Reinf 300
C
Section D
A B
66 Short- Column Main Reinf 300
C
A B
67 Short- Column Main Reinf 300
C
A B
70 middle- Column Main Reinf 300
C
A B
71 middle- Column Main Reinf 300
C
A B
75 long- Column Main Reinf 300
C
A C
B
A C
B
Dia of
B (mm) C (mm) Spacing of Bar(mm) Cutting Length(m) No. of Bar
Bar(mm)
2350 0 12 0 2.350 8
2025 0 12 0 2.025 4
1900 0 12 0 1.900 4
OPTION-2
2590 0 12 2.842 4
2590 0 16 2.826 4
1650 0 16 1.886 8
3050 0 12 3.302 4
3050 0 16 3.286 4
1800 0 16 2.036 8
3100 0 12 3.352 4
3100 0 16 3.336 4
2350 0 16 2.586 8
2590 0 12 2.842 4
2590 0 16 2.826 4
1400 0 16 1.636 8
3050 0 12 3.302 4
3050 0 16 3.286 4
1660 0 16 1.896 8
3100 0 12 3.352 4
3100 0 16 3.336 4
2200 0 16 2.436 8
OPTION-1
Total Length(m)
Unit Weight in kg/m
Weight in kgs
Weight in MT
Total Weight in Kgs
Total Weight in MT
Total Length(m)
Remarks
8 10 12 16
11.3
17.328 o/o
12.388 o/o
13.2
13.1
20.976 o/o
14.996 o/o
13.4
13.3
23.712 o/o
16.952 o/o
11.4
11.3
16.416 o/o
11.736 o/o
13.2
13.1
19.152 o/o
13.692 o/o
13.4
13.3
19.152 o/o
13.692 o/o
15.504 o/o A
11.084 o/o
18.24 o/o
13.04 o/o
21.888 o/o
15.648 o/o
11.6 c angle shall be as per wtg
13.68 o/o
9.78 o/o
16.416 o/o
11.736 o/o
14.6 c angle shall be as per wtg
20.064 o/o
14.344 o/o
Transformer
1 top A
Foundation
B
Transformer
2 top A
Foundation
B
Transformer
3 bottom A
Foundation
B
Transformer
4 bottom A
Foundation
B
Transformer
5 side-1 A
Foundation
B
Transformer
6 side-1 A
Foundation
B
Transformer
7 side-2 A
Foundation
B
Transformer
8 side-2 A
Foundation
B
Transformer
9 side-3 A
Foundation
B
Transformer
10 side-3 A
Foundation
B
Transformer
11 side-4 A
Foundation
B
Transformer
12 side-4 A
Foundation
B
B
A
Transformer
13 Chairs
Foundation
B
15 Pedestal P1 stirups
250
Pedestal bottom
16 Pedestal P1 reinforcement local
thickning
A
18 Sock pit Raft Sump
A
19 Sock pit Raft Sump
A
21 Sock pit Raft Sump
B
A
22 Sock pit Raft Sump
A
24 Sock pit Raft Sump
A
25 Sock pit Raft Sump
A
27 Sock pit Raft Sump
A
28 Sock pit Raft Sump
A A C BBBBB
A
A
Bar Bending Shedule
Location: WTG USS
Date: 13-09-2023
Spacing
Dia of
Bar Shape A (mm) B (mm) C (mm) of
Bar(mm)
Bar(mm)
B
C 350 2320 350 10 150
B
500 970 250 10 150
C
A 600 170 50 12
B
170 170 8 150
250 250
1702 10 150
850
C
800 650 300 10 150
B 3400 0 10 150
B
400 1900 0 10 150
C
800 650 300 10 150
B 3000 0 10 150
2.58 16 41.280
2.98 13 38.740
2.58 16 41.280
2.98 13 38.740
2.58 7 18.060
1.63 13 21.190
2.98 7 20.860
1.63 16 26.080
2.58 7 18.060
1.63 13 21.190
2.98 7 20.860
1.63 16 26.080
1.68 42 70.560
1.374 8 10.992
0.712 20 14.240
1.662 48 79.776
6.76 22 148.720
6.085 4 24.340
1.71 4 6.840
3.4 13 44.200
2.06 13 26.780
2.26 13 29.380
6.36 21 133.560
5.71 4 22.840
1.71 4 6.840
3 16 48.000
2.16 16 34.560
2.16 16 34.560
area)
TOP Distribution
6 Bar (Deduction A
B
C
Sump area)
Bottom
7 Distribution Bar A
B
(Deduction Sump
C
area)
A
8 Top Main Bar
B
WALL
C C
9 Vertical Bars
B
10 Vertical Bars
BA
11 Binders C A
SLAB A
B
C
B
12 Bottom Main Bars
16 Lugs - steps
Extra Bar near cover
17 opening
L1
18 precast cover
12 1000 0 0 0 1000
8 650 0 0 0 650
8 450 0 0 0 450
TOTAL LENGTH OF STEEL BAR (Mtr)
UNIT WEIGHT OF STEEL KG/Mtr
STEEL WEIGTH IN KG's
STEEL WEIGTH IN MT
GRAND TOTAL IN MT
Nos. of TOTAL
LENGTH OF BAR (MTR)
Bar NOS.
8 10 12 16 20 25 32
18 36 0 0 117.072 0 0 0 0
18 36 0 0 117.072 0 0 0 0
4 8 0 0 18.416 0 0 0 0
4 8 0 0 20.016 0 0 0 0
4 8 0 0 10.416 0 0 0 0
4 8 0 0 10.416 0 0 0 0
4 8 0 0 9.016 0 0 0 0
4 8 0 0 8.416 0 0 0 0
0 0 0 0 0 0 0
48 48 0 0 113.376 0 0 0 0
44 44 0 0 103.928 0 0 0 0
17 68 0 0 166.736 0 0 0 0
0 0 0 0 0 0 0
16 16 0 39.36 0 0 0 0 0
16 16 0 39.36 0 0 0 0 0
16 16 0 39.36 0 0 0 0 0
16 16 0 39.36 0 0 0 0 0
9 9 0 0 0 5.598 0 0 0
2 6 0 0 6 0 0 0 0
3 6 3.9 0 0 0 0 0 0
4 4 1.8 0 0 0 0 0 0
5.7 157.44 700.88 5.598 0 0 0
0.395 0.617 0.889 1.578 2.466 3.853 6.320
2.2515 97.14048 623.0823 8.833644 0 0 0
0.002 0.097 0.623 0.009 0.000 0.000 0.000
0.731
REMARK
Measurement sheet
A HT Pannel Slab
Sr.No Description of Item Unit No Nos
1 uss column shuttering option -2 UPTO B
section A SQM
C1 1 4
C2 1 4
C3 1 4
section-D SQM
C1 1 4
C2 1 4
C3 1 4
COLUMN SHUTTERING ABOVE BEAM2 TO BELOW BEAM BOTTOM
SECTION $ SECTION D SQM 6 4
Transformer Foundatio
Shuttering Work M2
Transformer Foundation 2 1
2 1
sump wall 4 1
Shuttering for Outer side grade slab 4 1
grade slab pcc shuttering 4 1
4 1
Shuttering for Inner and outer side
wall
4 1
pedestral 1 column 4 4
1 1
plum shuttering 1 1
plum shuttering
2 1
plum pcc shuttering 2 1
2 1
TOTAL
QUANTITY
QUANTITY
5.9 0.2 2.36
5 0.2 2
5 0.3 3
2.72 0.3 2.448
TOTAL BEAM 1 QUANTITY 13.312
UANTITY
5.9 3.32 19.588
5 0.3 3
2.72 0.3 2.448
TOTAL BEAM BOTTOM QUANTUITY 5.448
ormer Foundation
2.000 1.050 4.200
2.400 1.050 5.040
0.450 0.300 0.540
5.700 0.125 2.850
5.700 0.075 1.710
2 1
SHORTER BEAM2
CUM 3 1
Transformer Foundatio
Concrete Work M³
Transformer
1 1
Foundation(M35
sump wall(M35) 1 1
Concrete for Outer side
1 1
grade slab(M35)
grade slab pcc Concrete
1 1
(M15)
Concrete for Inner and 4 1
outer side wall
pedestral 1 column
4 1
concrete
1 1
plum concrete
plum concrete
TOTAL
Deduction
Opening 1 1
TOTAL
Brick Quantity
asurement sheet
HT Pannel Slab
L B H/D Quantity Remarks
ETE QUANTITY
0
TOTAL QUANTITY OF BEAM2 1.4634
EAM QUANTITY
5.9 0.3 0.2 0.708
NG QUANTITY
5.9 3.32 0.15 2.9382
ansformer Foundation
2.000 2.400 1.050 5.040
TOTAL 26.324