Professional Documents
Culture Documents
Valve Prooving System VPS 504
Valve Prooving System VPS 504
VPS 504
for multiple actuators
8.10
Specifications
Nominal voltage 230 V AC -15% to -240 V +6%, VPS 504 series 05: 24 VDC
For further voltages, refer to type overview
Fuse installed in housing cover, Microfuse 6.3 slow-blow L 250 V; IEC-127-2/III (DIN 41 662)
replaceable
Switching current Operating output VPS 504 Series 01, 02, 03, 04, 05: max. 4 A
Interference output VPS 504 Series 02, 04, 05: max. 1A
Max. number of test cycles 20/h. Wait for at least 2 minutes after carrying out more than 3 consecutive
test cycles.
Media
• Standard model Gas families 1, 2, 3 and other gaseous media.
Not suitable for butane.
2 … 10
VPS 504 sectional diagram
DMV… Series
V1 V2
11 4 3 2 1 2 1
p1
10
p1 +8” W.C.
9 7 1
8
8
VPS 504
17
16
7
6 15
5 14
13
p2
4 12
3
2
1
p1
5
3 … 10
Functional description Function principle
The VPS 504 operates depending on
pressure build-up.
The program module starts to func-
tion when heat is requested.
Test is performed depending on the pmax. = 500 mbar
burner functional procedure:
VPS 504
p1 p2
pe pa
Release period tF
Period which a VPS requires to per-
form a complete operation proce- Release period
t F [s] 30
dure. The release period of the VPS
504 depends on test volume and 28
input pressure: 26
Field of application
VTest < 1.5 l 24
pe > 20 – 500 mbar F
} t ≈ 10 s 22 r
ba
20 0 0 m bar
5 m
=
p e 300
VTest > 1.5 l 18 =
pe > 20 mbar
} tF > 10 s 16
pe
ar
14 mb
tF max. ≈ 26 s = 100
pe ar
12 mb
20
p e=
10
Test period Pt 8
Pumping time of motor pump. Release period
6 ≈ 10 s
Test volume VTest 4 at test volume
≤ 1,5 l
Volume between V1 output-side and 2
V2 input-side and the intermediate
tube pieces. 1 2 3 4 Test volume
VTest max. /VPS 504 = 4 l V Test [l]
Program sequence
p p p + 20 mbar p p p
e e e e e
e
r r
V1 V2 V1 V2 V1 V2
p1
Program modul
p2 Idle state p1
Program modul
p2 Pressure p1
Program modul
p2 Operation
pe pa pe pa pe pa
build-up
Idle state: Valves 1 and 2 are closed. test volume (max. 4.0 l) and input pres- mostat is present (heat requirement).
Pressure build-up: The internal sure (max. 500 mbar). If the test section
motor pump increases the gas pres- is tight, the contact is released to the If there is a short power failure during
sure in the test section by approx. 20 automatic burner control after max. 26 s the test or burner operation, the test
mbar compared to the input-side - the yellow signal lamp lights up. is started again automatically.
pressure applied to valve V1. If the pumping time < approx. 10s,
During the test period, the installed If the test section is leaky or if the pres- the pressure difference between the
differential pressure switch monitors sure increase by + 20 mbar is not at- testing system and the inlet pressure
the test section for leakage. If the test tained during the test period (max. 26 is balanced after pumping is finished.
pressure is attained, the motor pump s), the VPS 504 switches to fault. The
is switched off (end of test period). The red signal lamp lights as long as the Operation: The internal valve of the
release time (10-26 s) depends on the contact release by the regulator or ther- VPS 504 is closed.
4 … 10
Program flowchart
0 5 10 15 20 25 30 [s]
F1 Fuse
F2 Switch or limiter
F3 Regulator h
P1 H2 H1
H1 Fault signal S P S P
F3 F2
H2 Operation signal
VPS 504
Additional switching characteris- Operation
V3
Series 01 SSM
P internal
tic of VPS 504 Series 01 SSM
Exchangeable fuse: Fault
If the test path is "untight", the VPS T 6.3 L 250 V (IEC 127-2/III)
switches to fault. D5 X 20 6 5 4 3 2 1 Socket part (fixed)
VPS 504 (X 1 B)
B4 S3 T2 T1 N L
An additional relay in the VPS inter-
rupts the burner fault line S3 be-
tween burner and heat generator. At
the same time, voltage is applied
from the heat generator to S3 line
and the LED H1 lights up.
Electrical connection
VPS 504 Series 02
The VPS 504 Series 01 is connected VPS 504 tight
Series 02
in series between temperature regu- internal V3 P
lator and automatic burner control
leaky
via a 7-pole connector.
The boiler male connector is inserted
into the female connector of VPS
T8 T7 T6 B5 N L1
504.
For pin assignment of female con- T8 T7 T6 B5 N L1
Male connector
diagram. N L
Output
Switching feature: No disconnection Operation voltage
between operating voltage circuit 230 V AC 50 Hz
rupted.
After eliminating the burner fault, exchangeable
fuse: Female connector
6.3 slow-blow 6 5 4 3 (fixed)
the valve proving system is restarted. L 250 V as per B4 S3 T2 T1
2
N
1
L VPS 504
IEC 127-2/III (X 1 B)
(DIN 41662)
D5 x 20
B4 S3 T2 T1 N L
Male connector
4 3 of heat generator
5 2 1
6 (X 1 S)
6 … 10
Electrical connection
VPS 504 Series 04
VPS 504 tight
PG 13.5 cable duct and connection Series 02
V3 P
internal
to screw terminals below cover in
leaky
housing (see Dimensions VPS 504
S04).
T8 T7 T6 B5 N L1
Floating control room sig- T8 T7 T6 B5 N L1
Male connector
nal may only be used for Fault Operation
}
signalling, never for burner re- N L
Output
lease. Operation voltage
230 V AC 50 Hz
Electrical connection
VPS 504 Series 05 VPS 504
series 05
PG 13.5 cable duct and connection internal V3
to screw terminals below cover in leaky
Release
= (DC) 24 V
20 V - 30 V DC. Refer to motor
signal
signal
Falut
startup current
7 … 10
Using the VPS 504 at DUNGS indi-
vidual solenoid valves .../5 Valve volume Volume of
For mounting the VPS 504 to valves
Rp 1 1/2 to Rp 2, the adapter kit,
VTest
= V1 output-side+
V2 input-side
+ tube line
Determining test volume VTest for DUNGS individual solenoid valves .../5
Nominal Valve volume [l] Test volume [l] = Volume V1 output-side+ V2 input-side+ tube length
diameter V1 output-side+ Tube lengths between individual valves L [m]
Rp / DN V2 input-side 0.5 m 1.0 m 1.5 m 2.0 m
Rp DN Rp DN Rp DN RP DN Rp DN
Rp 1 1/2 / DN 40 0.50 l 0.70 l 1.10 l 1.35 l 1.70 l 2.00 l 2.80 l 2.65 l 2.80 l 3.30 l
DN 65 2.00 l 3.70 l
The max. test volume of 4.0 l
must not be exceeded.
DN 80 3.30 l
Startup The motor pump switches off, the red If an exhaust gas valve is in-
1. Check test section for leaks after fault lamp lights up. Switch-through to stalled in the boiler, it must
assembly. the automatic burner control does not be open at the beginning of the test.
2. Start test by using temperature take place.
regulator and/or restart or by press- In order to prevent functional
ing the reset button of VPS 504. Functional check and leakage problems, we
3. If the test section is tight By opening a screw plug in test nipple recommend the use of solenoid
Depending on the length of the test p2 (pa) during test period (pumping valves as per EN 161 Class A and
section and the residual pressure time), leakage can be simulated and Class B.
applied, the pumping time is be- a function check can take place.
tween 3 s and 26 s. Insufficiently shielded fre-
The release for the automatic burner Setting quency converters could
control is then given after approx. The VPS 504 must not be adjusted on cause faults in the VPS due to
10 s at the earliest (at small test site. network disturbances.
volumes and small input pressures) Make provisions for sufficient elec-
and after approx. 26 s at the latest Assembly trical shielding.
(at large test volumes and large Directly flange the VPS 504 laterally to
input pressures) - the yellow signal the DUNGS multiple actuators (mount-
lamp lights up. ing is possible on left-hand or right-
If the test section is leaky hand side) using two 10.5 x 2.25 O
The test pressure is not attained. rings and four M4 x 16 self-tapping
screws.
8 … 10
Dimensions [mm]
VPS 504 Series 01, Series 03
126,5
Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100
147
Female connector
150
X1B as per DIN 4791
pa
22
pe
pa pe
Ø9
13
4,3
53,7
72
Fonctionamento
Dérangement
Funziamento
Störung
Betrieb
Lockout
Blocco
Male connector
Run
pa test nipple X1S as per Pressure connection (to test section)
DIN 4791
Serie 01
Typ VPS 504
Spare fuse
Dimensions [mm]
VPS 504 Series 02
126,5
Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100
147
150
pa
22
pe
pa pe
Ø9
13
4,3
53,7
72
Funziamento
Störung
Betrieb
Lockout
Blocco
Run
Spare fuse
Serie 02
Typ VPS 504
Dimensions [mm]
VPS 504 Series 04, 05
Fuse
Cover, electrical connection
126,5
5 6 7 8
Additionally, PG 11
100
150
Standard:
PG 13.5
cable duct
pa
22
Spare fuse
pe pa pe
Ø9
13
4,3
53,7
72
Vor dem Öffnen ist das Gerät stromlos zu schalten
Betrieb
Lockout
Blocco
Run
9 … 10
Valve testing system VPS 504
for multiple actuators
Version
VPS 504 Series … 24 VDC 230 V 220 V 120 V 110 V
50 Hz 60 Hz 60 Hz 50 Hz
Accessories/spare parts
Adapter kit VPS 504 for solenoid valves up to Rp 2 205 360
Adapter kit VPS 504 for solenoid valves from DN 40 to DN 80 222 740
7-pole male connector, 2 cable inputs with strain relief (series 02) 231 807
7-pole male connector, 4 cable inputs with PG 11 (series 02) 231 808
7-pole male connector, 4 cable inputs with strain relief (series 02) 231 809
Mounting kit (4 x M4 x 16,2, 2 x O-Ring, 2 x filter insert) 221 503
Appliance fuse link (5 pieces) 231 780
Spare parts set VPS filter 243 801
We reserve the right to make any changes in the interest of technical progress.
Head Offices and Factory Postal address
Karl Dungs GmbH & Co. Karl Dungs GmbH & Co.
Siemensstraße 6-10 Postfach 12 29
D-73660 Urbach, Germany D-73602 Schorndorf, Germany
Telephone +49 (0)7181-804-0 e-mail info@dungs.com
Fax +49 (0)7181-804-166 Internet www.dungs.com 10 … 10