Valve testing system

VPS 504
for multiple actuators

8.10

Technical description Application


The VPS 504 is the valve proving system Valve proving system for DUNGS single
for DUNGS double actuators. The valve valves, DMV double solenoid valve and
proving system complies with EN 1643: GasMultiBloc MB.
- Equipment operates independent of re- The VPS 504 can also be used for monitor-
sidual pressure in the range of the per- ing the DUNGS solenoid valves up to DN
Printed in Germany • Rösler Druck • Edition 10.02 • Nr. 219 547

missible operating range. 80, with and without bypass connection.


- Test volume ≤ 4 l 24 VDC design for gas motors.
- Setting work not necessary on site Suitable for gases of gas families 1, 2, 3
- Short test period: min. 10 s, max. 26 s and other neutral gaseous media.
- Tightness or leaks are displayed by an LED
- External fault display possible for series Approvals
02, series 04 and series 05 EC type test approval as per EC Gas
- Group fault alarm optional for series 01 Appliance Directive:
(SSM) VPS 504… CE-0085 AP 0168
- Suitable for TRD systems EC type test approval as per EC Pressure
- Electrical connection possible by plug con- Equipment Directive:
nection series 01, 02, 03. No rewiring is re- VPS 504… CE0036
quired for contact allocation as per DIN 4791. Approvals in other important gas con-
- Series 04 and series 05: electrical con- suming countries. Special design for the
nection at screw terminals via PG 13.5 North American market with UL and FM
cable entry registration.
1 … 10
VPS 504 Valve proving system for automatic shutoff valves as per EN 161, Class A and Class B

Specifications

Operating pressure max. 500 mbar (50 kPa)

Test volume ≤ 4.0 l

Pressure increase by motor pump ≈ 20 mbar

Nominal voltage 230 V AC -15% to -240 V +6%, VPS 504 series 05: 24 VDC
For further voltages, refer to type overview

Frequency VPS series 01-04: 50 Hz or 60 Hz


Series 05: DC

Rating requirement During pumping time approx. 6 VA, in operation 17 VA

Prefuse (provided by customer) 10 A quick-acting or 6.3 A slow-acting fuse

Fuse installed in housing cover, Microfuse 6.3 slow-blow L 250 V; IEC-127-2/III (DIN 41 662)
replaceable

Switching current Operating output VPS 504 Series 01, 02, 03, 04, 05: max. 4 A
Interference output VPS 504 Series 02, 04, 05: max. 1A

Degree of protection VPS 504 Series 01, 02, 03: IP 40


VPS 504 Series 04, 05: IP 54

Ambient temperature 50 Hz 230 VAC -15°C to +70°C


others: -15°C to +60°C

Release time Approx. 10 - 26 s, depending on test volume and input pressure

Sensitivity limit max. 50 l/h

Switch-on duration of control 100 % ED

Max. number of test cycles 20/h. Wait for at least 2 minutes after carrying out more than 3 consecutive
test cycles.

Installation position vertical, horizontal, not upside down

Media
• Standard model Gas families 1, 2, 3 and other gaseous media.
Not suitable for butane.

• Liquefied gas model Gas family 3 and butane

2 … 10
VPS 504 sectional diagram

DMV… Series

V1 V2

11 4 3 2 1 2 1

p1
10

p1 +8” W.C.
9 7 1
8
8
VPS 504

17
16

7
6 15

5 14
13
p2
4 12
3
2
1
p1
5

1 Hall switch 7 Solenoid valve coil 13 Volume restrictor


2 Solenoid 8 Pressure pump 14 Pump diaphragm
3 Pressure switch diaphragms 9 Unlock switch 15 Pump linkage
4 Compression spring 10 Fault lamp 16 pcb
5 Filter 11 Operating lamp 17 Plug connection
6 Solenoid valve anchor 12 Test nipple 18 Equipment fuse
19 Spare fuse

3 … 10
Functional description Function principle
The VPS 504 operates depending on
pressure build-up.
The program module starts to func-
tion when heat is requested.
Test is performed depending on the pmax. = 500 mbar
burner functional procedure:

Check prior to burner start or


A Program module V1 V2
DMV-D(LE)
Check during pre-purge period or Instrument gland
p1 p2
A
Check after burner shut-down Connection
pe pa

VPS 504
p1 p2
pe pa

Release period tF
Period which a VPS requires to per-
form a complete operation proce- Release period
t F [s] 30
dure. The release period of the VPS
504 depends on test volume and 28
input pressure: 26
Field of application
VTest < 1.5 l 24
pe > 20 – 500 mbar F
} t ≈ 10 s 22 r
ba
20 0 0 m bar
5 m
=
p e 300
VTest > 1.5 l 18 =

pe > 20 mbar
} tF > 10 s 16
pe

ar
14 mb
tF max. ≈ 26 s = 100
pe ar
12 mb
20
p e=
10
Test period Pt 8
Pumping time of motor pump. Release period
6 ≈ 10 s
Test volume VTest 4 at test volume
≤ 1,5 l
Volume between V1 output-side and 2
V2 input-side and the intermediate
tube pieces. 1 2 3 4 Test volume
VTest max. /VPS 504 = 4 l V Test [l]

Program sequence

p p p + 20 mbar p p p
e e e e e
e

r r

V1 V2 V1 V2 V1 V2

p1
Program modul
p2 Idle state p1
Program modul
p2 Pressure p1
Program modul
p2 Operation
pe pa pe pa pe pa
build-up

VPS 504 VPS 504 VPS 504


p1 p2 p1 p2 p1 p2
pe pa pe pa pe pa

Idle state: Valves 1 and 2 are closed. test volume (max. 4.0 l) and input pres- mostat is present (heat requirement).
Pressure build-up: The internal sure (max. 500 mbar). If the test section
motor pump increases the gas pres- is tight, the contact is released to the If there is a short power failure during
sure in the test section by approx. 20 automatic burner control after max. 26 s the test or burner operation, the test
mbar compared to the input-side - the yellow signal lamp lights up. is started again automatically.
pressure applied to valve V1. If the pumping time < approx. 10s,
During the test period, the installed If the test section is leaky or if the pres- the pressure difference between the
differential pressure switch monitors sure increase by + 20 mbar is not at- testing system and the inlet pressure
the test section for leakage. If the test tained during the test period (max. 26 is balanced after pumping is finished.
pressure is attained, the motor pump s), the VPS 504 switches to fault. The
is switched off (end of test period). The red signal lamp lights as long as the Operation: The internal valve of the
release time (10-26 s) depends on the contact release by the regulator or ther- VPS 504 is closed.
4 … 10
Program flowchart

Programm flowchart VPS 504 "TIGHT": Examples Test volume = 0.3 l


Regulator
Pump motor
Solenoid valve
Differential pressure switch
Release signal

Programm flowchart VPS 504 "TIGHT": Examples Test volume = 4.0 l


Regulator
Pump motor
Solenoid valve
Differential pressure switch
Release signal

Programm flowchart VPS 504 "LEAKY"


Regulator
Pump motor
Solenoid valve
Differential pressure switch
Release signal
Fault signal

0 5 10 15 20 25 30 [s]

Electrical connection Solenoid valve


Burner operation
VPS 504 Series 01 Fault
Regulator chain
The VPS 504 Series 01 is connected N
Pe
in series between temperature regu- L
lator and automatic burner control
6 5 4 2 1
via a 7-pole connector. Connector 3 Burner female
connector (X 1B)
B4 S3 T2 T1 N L
pin assignment between burner and
boiler is performed as per DIN 4791.
For pin assignment, refer to connec- Male connector
B4 S3 T2 T1 N L (cable-to-cable)
tion diagram. 4
3
2 1
VPS 504
(X 1S)
5
If the heat generator is wired as per 6

DIN 4791, no boiler- or burner-side Control line


7x1
rewiring is necessary for electrical VPS 504
connection. V3
Series 01,
internal
P
The burner female connector is con- Operation
exchangeable
nected with the cable-to-cable male fuse: Female connector
6.3 slow-blow 6 5 4 3 2 1 (fixed)
connector of VPS 504 Series 01. L 250 V as per B4 S3 T2 T1 N L VPS 504
(X 1 B)
IEC 127-2/III
The female connector VPS 504 Se- (DIN 41662)
D5 x 20
ries 01 is connected with the cable-
to-cable male connector of the heat B4 S3 T2 T1 N L
3 Male connector
generator. 6
5
4 2 1 of heat generator
(X 1 S)

F1 Fuse
F2 Switch or limiter
F3 Regulator h
P1 H2 H1
H1 Fault signal S P S P
F3 F2
H2 Operation signal

P1 Operating hours counter S1


Stage 1 F1
S1 Switch
X1B Female connection
X1s Male connection
5 … 10
Electrical connection
VPS 504 Series 01 SSM
Connector part
Group fault alarm B4 S3 T2 T1 N L VPS 504 (X 1S)
3
The electrical connection of VPS 504 5
4 2 1
6
Series 01 SSM is performed the same
way as with the VPS 504 Series 01. Control line 7 x 1

VPS 504
Additional switching characteris- Operation

V3
Series 01 SSM
P internal
tic of VPS 504 Series 01 SSM
Exchangeable fuse: Fault
If the test path is "untight", the VPS T 6.3 L 250 V (IEC 127-2/III)
switches to fault. D5 X 20 6 5 4 3 2 1 Socket part (fixed)
VPS 504 (X 1 B)
B4 S3 T2 T1 N L
An additional relay in the VPS inter-
rupts the burner fault line S3 be-
tween burner and heat generator. At
the same time, voltage is applied
from the heat generator to S3 line
and the LED H1 lights up.

Electrical connection
VPS 504 Series 02
The VPS 504 Series 01 is connected VPS 504 tight
Series 02
in series between temperature regu- internal V3 P
lator and automatic burner control
leaky
via a 7-pole connector.
The boiler male connector is inserted
into the female connector of VPS
T8 T7 T6 B5 N L1
504.
For pin assignment of female con- T8 T7 T6 B5 N L1
Male connector

nector VPS 504 and heat generator


male connector, refer to connection Fault Operation
}

diagram. N L
Output
Switching feature: No disconnection Operation voltage
between operating voltage circuit 230 V AC 50 Hz

and control circuit.

Electrical connection Solenoid valve


Burner operation
VPS 504 Series 03 Fault
The electrical connection of VPS Regulator
N
Pe
504 Series 03 is performed as in L
VPS 504 Series 01.
6 5 4 3 2 1
Burner female
connector (X 1B)
B4 S3 T2 T1 N L
Additional switching feature of
VPS 504 Series 03
If a fault signal is existent on S3 B4 S3 T2 T1 N L
Male connector
(cable-to-cable)
3
(burner fault), the regulator chain is 6
5
4 2 1
VPS 504
(X 1S)

bridged to the burner via an addi-


Control line
tional relay in VPS 504 Series 03 and 7x1

at the same time the operating volt- Pump


VPS 504
Series 01,
internal
age of VPS 504 Series 03 is inter- Operation

rupted.
After eliminating the burner fault, exchangeable
fuse: Female connector
6.3 slow-blow 6 5 4 3 (fixed)
the valve proving system is restarted. L 250 V as per B4 S3 T2 T1
2
N
1
L VPS 504
IEC 127-2/III (X 1 B)
(DIN 41662)
D5 x 20
B4 S3 T2 T1 N L
Male connector
4 3 of heat generator
5 2 1
6 (X 1 S)

Only the fault signal coming


from the automatic burner
control of the burner may be con- h

nected to connection S3. If you do P1 H2 H1


S P S P
F3 F2
not observe this instruction, per-
sons may be injured or objects
may be damaged. Therefore, S1

strictly keep to this instruction. F1

6 … 10
Electrical connection
VPS 504 Series 04
VPS 504 tight
PG 13.5 cable duct and connection Series 02
V3 P
internal
to screw terminals below cover in
leaky
housing (see Dimensions VPS 504
S04).
T8 T7 T6 B5 N L1
Floating control room sig- T8 T7 T6 B5 N L1

Male connector
nal may only be used for Fault Operation

}
signalling, never for burner re- N L
Output
lease. Operation voltage
230 V AC 50 Hz

Electrical connection
VPS 504 Series 05 VPS 504
series 05
PG 13.5 cable duct and connection internal V3
to screw terminals below cover in leaky

housing (see Dimensions VPS 504 tight


P

S04). exchangeable fuse:


6.3 slow-blow
L 250 V
I max./maxi.: as per
B : 4A S B + – IEC 127-2/III
Operating voltage range S : 1A Operating voltage (DIN 41662) D5 x 20

Release
= (DC) 24 V
20 V - 30 V DC. Refer to motor

signal
signal
Falut
startup current

Test volume of DUNGS multiple actuators MB-D..., MB-ZR..., MB-VEF..., DMV-D.../11

Type Nominal Test volume Type Nominal Test volume


diameter [l] diameter [l]
Rp/DN Rp/DN

DMV-D(LE) 503/11 Rp 3/8 0.03 l MB-D(LE) 403 Rp 3/8 0.04 l


DMV-D(LE) 507/11 Rp 3/4 0.10 l MB-D(LE) 405 Rp 1/2 0.11 l
DMV-D(LE) 512/11 Rp 1 1/4 0.24 l MB-D(LE) 407 Rp 3/4 0.11 l
DMV-D(LE) 520/11 Rp 2 0.24 l MB-D(LE) 410 Rp 1 0.33 l
DMV-D(LE) 525/11 Rp 2 0.44 l MB-D(LE) 412 Rp 1 1/4 0.33 l
DMV-D(LE) 5040/11 DN 40 0.38 l MB-D(LE) 415 Rp 1 1/2 0.24 l
DMV-D(LE) 5050/11 DN 50 0.39 l MB-D(LE) 420 Rp 2 0.24 l
DMV-D(LE) 5065/11 DN 65 0.69 l MB-ZRD(LE) 405 Rp 1/2 0.11 l
DMV-D(LE) 5080/11 DN 80 1.47 l MB-ZRD(LE) 407 Rp 3/4 0.11 l
DMV-D(LE) 5100/11 DN 100 2.28 l MB-ZRD(LE) 410 Rp 1 0.33 l
DMV-D(LE) 5125/11 DN 125 3.56 l MB-ZRD(LE) 412 Rp 1 1/4 0.33 l
MB-ZRD(LE) 415 Rp 1 1/2 0.24 l
MB-ZRD(LE) 420 Rp 2 0.24 l
MB-VEF 407 Rp 3/4 0.11 l
MB-VEF 412 Rp 1 1/4 0.33 l
MB-VEF 415 Rp 1 1/2 0.24 l
MB-VEF 420 Rp 2 0.24 l
MB-VEF 425 Rp 2 0.44 l

7 … 10
Using the VPS 504 at DUNGS indi-
vidual solenoid valves .../5 Valve volume Volume of
For mounting the VPS 504 to valves
Rp 1 1/2 to Rp 2, the adapter kit,
VTest
= V1 output-side+
V2 input-side
+ tube line

Order No. 205 360 is required.


For mounting the VPS 504 to valves
DN 40 to DN 80, the adapter kit, Order Determining test volume VTest
No. 222 740 is required.
L [m]
Determining test volume VTest
1. Determine output-side volume of V1.
Refer to table for Rp 1/2 to DN 80. 3
2. Determine input-side volume of V2. 1 2
Refer to table for Rp 1/2 to DN 80. V1 V2
3. Determine volume of intermediate Instrument gland
Adapter No. 205 360 / 222 740 Connection
tube piece 3.
p1 p2 1 Volume V1
Refer to table for Rp 1/2 to DN 80. pe Program module pa output-side

4. VTest = Volume Valve 1 + 2 Volume V2


input-side
Volume Intermediate tube piece + VPS 504 3 Volume of intermediate
Volume Valve 2 p1 p2
tube piece
V1 <-> V2
pe pa

Determining test volume VTest for DUNGS individual solenoid valves .../5
Nominal Valve volume [l] Test volume [l] = Volume V1 output-side+ V2 input-side+ tube length
diameter V1 output-side+ Tube lengths between individual valves L [m]
Rp / DN V2 input-side 0.5 m 1.0 m 1.5 m 2.0 m
Rp DN Rp DN Rp DN RP DN Rp DN

Rp 1/2 0.07 l 0.17 l 0.27 l 0.37 l 0.47 l

Rp 3/4 (DN 20) 0.12 l 0.27 l 0.42 l 0.57 l 0.72 l

Rp 1 (DN 25) 0.20 l 0.45 l 0.70 l 0.95 l 1.20 l

Rp 1 1/2 / DN 40 0.50 l 0.70 l 1.10 l 1.35 l 1.70 l 2.00 l 2.80 l 2.65 l 2.80 l 3.30 l

Rp 2 / DN 50 0.90 l 1.20 l 1.90 l 2.20 l 2.90 l 3.20 l 3.90 l

DN 65 2.00 l 3.70 l
The max. test volume of 4.0 l
must not be exceeded.
DN 80 3.30 l

Startup The motor pump switches off, the red If an exhaust gas valve is in-
1. Check test section for leaks after fault lamp lights up. Switch-through to stalled in the boiler, it must
assembly. the automatic burner control does not be open at the beginning of the test.
2. Start test by using temperature take place.
regulator and/or restart or by press- In order to prevent functional
ing the reset button of VPS 504. Functional check and leakage problems, we
3. If the test section is tight By opening a screw plug in test nipple recommend the use of solenoid
Depending on the length of the test p2 (pa) during test period (pumping valves as per EN 161 Class A and
section and the residual pressure time), leakage can be simulated and Class B.
applied, the pumping time is be- a function check can take place.
tween 3 s and 26 s. Insufficiently shielded fre-
The release for the automatic burner Setting quency converters could
control is then given after approx. The VPS 504 must not be adjusted on cause faults in the VPS due to
10 s at the earliest (at small test site. network disturbances.
volumes and small input pressures) Make provisions for sufficient elec-
and after approx. 26 s at the latest Assembly trical shielding.
(at large test volumes and large Directly flange the VPS 504 laterally to
input pressures) - the yellow signal the DUNGS multiple actuators (mount-
lamp lights up. ing is possible on left-hand or right-
If the test section is leaky hand side) using two 10.5 x 2.25 O
The test pressure is not attained. rings and four M4 x 16 self-tapping
screws.
8 … 10
Dimensions [mm]
VPS 504 Series 01, Series 03

126,5

Sicherung eingebaut, auswechselbar


Fuse built into housing, exchangeable
Fusibile integré dans la couvercle du boîtier
interchangeable

Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100

147
Female connector

150
X1B as per DIN 4791

pa
22

pe
pa pe

Ø9
13
4,3

53,7
72

pe test nipple Suction connection (gas input)

Fonctionamento
Dérangement

Funziamento
Störung

Betrieb
Lockout
Blocco
Male connector

Run
pa test nipple X1S as per Pressure connection (to test section)
DIN 4791

Serie 01
Typ VPS 504
Spare fuse

Dimensions [mm]
VPS 504 Series 02

126,5

Sicherung eingebaut, auswechselbar


Fuse built into housing, exchangeable
Fusibile integré dans la couvercle du boîtier
interchangeable

Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100

147

150

pa
22

pe
pa pe
Ø9
13
4,3

53,7
72

pe test nipple Suction connection (gas input)


Fonctionamento
Dérangement

Funziamento
Störung

Betrieb
Lockout
Blocco

Run

pa test nipple Pressure connection (to test section)

Spare fuse
Serie 02
Typ VPS 504

Dimensions [mm]
VPS 504 Series 04, 05
Fuse
Cover, electrical connection
126,5

5 6 7 8

Additionally, PG 11
100

cable duct possible


147

150

Standard:
PG 13.5
cable duct
pa
22

Spare fuse
pe pa pe
Ø9
13
4,3

53,7
72
Vor dem Öffnen ist das Gerät stromlos zu schalten

Prima di apire l'aparecchio togliere la corrente


Fonctionamento
Funziamento
Dérangement
Störung

Betrieb
Lockout
Blocco

Run

Before opening switch off power supply


Achtung, Warning, Attention, Attentione

Ouverture uniquement hors tension

pe test nipple Suction connection (gas input)


Typ: VPS 504
Serie 04

pa test nipple Pressure connection (to test section)

9 … 10
Valve testing system VPS 504
for multiple actuators

VPS 504 type overview / accessories / order data

Version
VPS 504 Series … 24 VDC 230 V 220 V 120 V 110 V
50 Hz 60 Hz 60 Hz 50 Hz

VPS 504 Series 01


7-pole plug connection Cable length: 0.30 m 219 873
Wiring as per DIN 4791 Cable length: 0.85 m 219 874
IP 40 degree of protection Cable length: 1.50 m 219 875 222 390 223 464
Cable length: 2.00 m 219 876
Group fault alarm Cable length: 0.85 m 227 462
Group fault alarm Cable length: 2.00 m 227 527

VPS 504 Series 02


7-pole plug connection with male connector 225 481 219 877 222 389 223 463
Free connection without male connector 219 878
IP 40 degree of protection
Liquefied gas model with male connector 226 315

VPS 504 Series 03


7-pole plug connection Cable length: 0.30 m 219 879
Wiring as per DIN 4791 Cable length: 1.50 m 223 590
IP 40 degree of protection

VPS 504 Series 04


Connection to screw terminals 219 881 222 388 223 426 221 327
PG 13.5 cable duct
Additionally, PG 11 possible
Floating fault signal (control room signal)
IP 54 degree of protection
Liquefied gas model 226 316 242 874 242 875 242 876

VPS 504 Series 05 Gasmotors 224 983

VPS 504 Series 06 UL, FM 221 073

Accessories/spare parts
Adapter kit VPS 504 for solenoid valves up to Rp 2 205 360
Adapter kit VPS 504 for solenoid valves from DN 40 to DN 80 222 740
7-pole male connector, 2 cable inputs with strain relief (series 02) 231 807
7-pole male connector, 4 cable inputs with PG 11 (series 02) 231 808
7-pole male connector, 4 cable inputs with strain relief (series 02) 231 809
Mounting kit (4 x M4 x 16,2, 2 x O-Ring, 2 x filter insert) 221 503
Appliance fuse link (5 pieces) 231 780
Spare parts set VPS filter 243 801

We reserve the right to make any changes in the interest of technical progress.
Head Offices and Factory Postal address
Karl Dungs GmbH & Co. Karl Dungs GmbH & Co.
Siemensstraße 6-10 Postfach 12 29
D-73660 Urbach, Germany D-73602 Schorndorf, Germany
Telephone +49 (0)7181-804-0 e-mail info@dungs.com
Fax +49 (0)7181-804-166 Internet www.dungs.com 10 … 10