Sub : Pre –requisite for installation of AAS, Model: iCE3500 with accessory Vapour Generator: VP-100 and Graphite
Furnace: GFS35Z.
Dear Sir,
Thank you very much for the aforesaid order awarded to us. You are also aware that for installation of this
sophisticated instrument pre-requisite is very much essential. So, for your ready reference pre-installation
requirement is enclosed herewith. Please go through the detailed site preparation guide.
You are requested to inform us after readiness of the pre-requisite so that we can plan our visit for installation at the
earliest.
We trust that the enclosure will be help to you. However, if you require any further assistance from us, please write
to us without any hesitation.
Thanking you and assuring our best services and sincere attention at all times.
Krishanu Pal
Customer Care Engineer
Pre-Installation requirements for AAS System
Computer Specification:
Windows XP Professional with service pack 2 or Windows7 professional 32 bit/ 64 bit, 500 GB Hard drive, DVD-ROM,
Dedicated mother board in-build RS232 port, USB connection minimum 4 nos., 2 GB RAM, 19” VGA Monitor.
Room Condition:
AC must require. Lab temperature must be 22-25 ˚C. The temperature should not change by more than 2 ˚C per
hour. Atmospheric humidity should be 20 to 60% Rh for an ambient temperature between 22 and 25°C.
Atmospheric conditions must be non-condensing. Make sure that the working surface is sufficiently rigid to prevent
vibration as this may affect the optical alignment of the spectrometer and accessories.
UPS Requirement:
For AAS without Graphite Furnace: It is advisable to use UPS system for instrument with accessories. The kVA rating
minimum 3 kVA or above double conversion IGBT based True Online UPS with built-in Isolation Transformer on the
Inverter output (Single phase in put & single phase out put). Double pole 64 amp MCB is required for input to the
UPS. Minimum 30 minute backup.
For AAS with Zeeman Graphite Furnace: It is advisable to use UPS system for instrument with accessories. The kVA
rating minimum 15 kVA of 3 phase double conversion IGBT based True Online UPS with built-in Isolation
Transformer on the Inverter output (three phase input & single phase output). Double pole 64 amp MCB is required
for input to the UPS. Minimum 30 minute backup.
Power distribution point’s requirement (UPS output supply single phase through double pole 64 amp MCB):
Location:
The instruments are designed for use on a normal laboratory bench. Ideally the instrument should be placed on a
moveable bench with 0.5 meters of access behind the instrument is mandatory.
Table Size:
Standard Table is required for installation. Length: 6 foot, Width: 3 foot, Height: 2.5 foot. If Furnace
accessory is used need Length: 8 foot rest are same.
Gas Requirements:
1. Acetylene Gas: The gas purity at least 99.95%. Impurities for Sulphur and phosphorus of less than 15ppm,
and water of less than 100ppm. The balance of the gas should be inert gas. The instrument will be supplied
with acetylene gas tubing terminating in 3/8in BSP Left Hand tighten thread connections. Double stage
acetylene regulator with suitable fittings.
2. Nitrous Oxide Gas: Gas purity minimum 99.95%. Oxygen impurities of less than 150ppm; nitrogen less than
400ppm; carbon dioxide of less than 50ppm; oxides of nitrogen less than 2ppm; carbon monoxide less than
1ppm and water less than 15ppm. The instrument will be supplied with N2O gas tubing terminating in 3/8in
BSP. Required two stage regulator with pre heater.
3. Argon Gas: Need two stage Argon regulator. The gas purity at least 99.999%. The instrument will be supplied
adopter fitting terminating in 3/8in BSP. For Argon Gas line gas paneling consist of Moisture trap and 5
micron filter is required.
4. Air Compressor: Clean, dry and oil free from a compressor providing at least 20l/min at a pressure up to 4.41
bar (60psi) and passed through a filter/regulator unit incorporating a 5 micron filter.
Tools required:
Gas cylinder opener for acetylene gas as well as nitrous oxide gas 1no.
Adjustable spanner 0-30mm 1no.
Teflon tap 2nos.