Project Management Group

CHECKLIST FOR GAS CUTTING SET

Project Name: Gas Cutting Equipment No.:

Contractor Name: Inspection Date:

Equipment Specs.: Next Inspection Date:

3 5
2

6 7
1

8 4

SR SR
NO
CHECK ITEM PHOTOS YES / NO NO
CHECK ITEM PHOTOS YES / NO

Protective valve Pressure gauges two


cap firmly fixed for for each cylinder (inlet
both cylinder & out) are in working
1 2
(Check for condition (both
damage / crack in Oxygen & Acetylene
the valve cap) gas)

Flash back arrestor Non return valves


(FBAs) is provided (NRVs) is provided for
3 4
for acetylene & both acetylene &
oxygen cylinders oxygen cylinders.

Hoses free from


Hose tight with damage (cut and
5 6
jubilee clamp cracks ) & different
colour are in use.

Cylinder secured
Trolley tire shall be
7 by chain to the 8
free from damages.
trolley.

Availability of
industrial type
9 lighter (no match 9 Others
box / commercial
lighters).

Name Signature Date


Checked by Contractor Safety Officer

Client Reviewed Accepted…………………….. Rejected………………………………………………….


Name Signature Date
Checked by Client

Format No. K034-OHS-GC-Ch-35/Rev00/May 2019

CBRE South Asia Pvt Ltd Page 1 of 1