Enter milestone and task information in the Milestones and Tasks worksheets. To chart
milestones along the timeline, enter 0 in the no. column, then, update the label position to
be "below" to avoid overlapping labels.

The position column in the milestone table, charts milestones within the task chart either on
the same row or in stacked rows. To chart them on the same row, enter the same number in
this column for each milestone. To chart them on different rows, enter different numbers.
Sample data charts all milestones along the row position of 2.

Guide for screen readers

There are 5 worksheets in this workbook:


About
Milestones
Tasks
Gantt Chart
Dynamic Chart Data (Hidden)

The instructions for each worksheet are in the A column starting in cell A1 of each worksheet.
They are written with hidden text. Each step guides you through the information in that row.
Each subsequent step continues in cell A2, A3, and so on, unless otherwise explicitly directed.
For example, instruction text might say "continue to cell A6" for the next step.

Hidden text will not print.


To remove these instructions from any worksheet, simply delete column A.

Dynamic Chart Data (Hidden)

Do not delete or modify content in the Hidden worksheet. Doing so could compromise the
integrity of the Gantt Charting.

Data may appear blank, dates may appear to be incorrect, do not fill in, edit, delete or
otherwise modify the data or you risk overwriting formulas and breaking the chart graphing
capability.

The DynamicMilestone table allows for 15 milestones to be charted. To chart more than 15,
simply expand the table to accommodate your number. Remember, only add the actual
milestone data in the Chart Data worksheet.

Tips

Page 1 of 6
By default, milestones are charted on row 1 of the Gantt Chart using the Position column in
the Chart Data worksheet, starting in cell C5. To chart milestones on different rows, simply
change the number.

The default setting is to highlight today's date in the Gantt Chart. To no longer highlight
Today's date, simply select "no" in the Chart Data worksheet in cell D2.

The Gantt Chart date timeline is charted with a gap of 5 dates between them. To change this,
select the timeline in the Gantt Chart worksheet and select Format Axis. Change the Major
unit from 5 to 1 or 10, for example.

This is the last instruction in this worksheet.

Page 2 of 6
for
for
th
fur
e
th
tas
er
ks
ins
ta
tru
bl
cti
e
on
is
Date tracking Gantt chart
s.
Select
in option No in cell D2 if you do not want to highlight today's date in the Gantt Chart worksheet.
celCellTrack
In today's
D2, select date? Down
ALT+Arrow Yesfor options.
l
G3
. Milestones
cel
ls
G4 The position
thr This column column, charts
ou should be milestones Enter the date for a Enter a milestone description in this
gh ordered within the task milestone in this column. These descriptions will appear in
J4.
A2 sequentially. chart. column. the chart.
1. No. Position Date Milestone
1 1 IDIP 1
2 1 IDIP 2
3 1 IDIP 3
4 1 PgMP
5 1 PfMP
6 1 PMI - CP (4 modules)
PMO-CP
PMO-CC
PMI-PBA
PMI-ACP
Lead Auditor 9001
Lead Auditor 14001
Lead Auditor 45001
LEAA Appointed Person
Note, the default number of milestones to chart is 15. LSSBB
Adding new milestones requires a change in the hidden wo
TheTo addinstruction
next more Milestones,
is in cell add
A26.a new row above this one.

A note is in cell G26.


This is the last instruction in this worksheet.

Page 3 of 6
for
for
th
fur
e
th
tas
er
ks
ins
ta
tru
bl
cti
e
on
is
Date tracking Gantt chart
s.
in
cel
l
G3
. Tasks

Enter the start date


for each task
This column below. For best Enter the end date
should be results sort this for each task or
ordered column in activity below, in this Enter tasks and/or activities in this
sequentially. ascending order. column. column.
No. Start Date End Date Task
1 8/15/2024 9/20/2024 IDIP 1
2 10/15/2024 11/17/2024 IDIP 2
3 6/20/2024 7/21/2024 IDIP 3
4 7/22/2024 8/14/2024 PgMP
5 11/16/2024 12/5/2024 PfMP
6 5/6/2024 5/8/2024 PMI - CP
7 6/1/2024 6/20/2024 PMO-CP
8 PMO-CC
9 PMI-PBA
10 PMI-ACP
11 6/19/2024 6/28/2024 Lead Auditor 9001
12 Lead Auditor 14001
13 Lead Auditor 45001
14 5/15/2024 5/22/2024 LEAA Appointed Person
15 5/6/2024 6/20/2024 LSSBB

To add more Tasks, add a new row above this one.


Auto calculated column
used for charting the
duration of each task. Do
not delete or modify.
Duration in days
37
34
32
24
20
3
20

10

8
46
thi
s
w
or
ks
he
et.

LSSBB

LEAA Appointed Person

Lead Auditor 9001

Today

IDIP 1

IDIP 2

IDIP 3

PgMP

PfMP

PMI - CP

PMO-CP

0 24 02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
02
4
0 /2 5 /4
/ 2 8 / 2
6 /1
/ 2 5 / 2 9 / 2 3 / 2 7 / 2 0 / 2 4 / 2
9 /7
/ 2 1 / 2
/5 / 2
/1 9
/ 2
/2 / 2
/1 6
/ 2
/3 0
/ 2
4 /2 5 /1 6 /1 6 /2 7 /1 7 /2 8 /1 8 /2 9 /2 10 10 11 11 11

Page 6 of 6

You might also like