Reference Calculation Outputs

AS2327 Design of Secondary Beam B1


Assume Lysaght Bondek 0.9 BMT
h = 120 mm
B1 = 610UB113
With 41 studs (22mm Փ x 95 mm high)
Beam catchment = 2500 mm
Construction on Stage 1
Assume deck + reo 0.22 KPA
S.W. of beam 113 x 9.8/1000 1.11 KN/m
G = 0.5 +0.22 (2.5) 1.05 KN/m

AS2327 Live Load (Sec A.3.2.2)


Appendix Tributary area = 16 x 2.5 40 m2
Interpolation of live load
0.5−0.3 0.35 KPA
Q (UDL) = 0.5 + (40-23)
23−46
This UDL will create a moment of
14 KNm
2
0.35 ×2.5 ×16
M* =
16
For a point load of 10 KN, the moment will become
40 KNm
PL 10× 16
M* = =
4 4
This is more critical, so we will use point load
100.32KNm
PL w L2 15× 16 1.26 ×162
M* = + = +
Steel 4 8 4 8

catalog Moment capacity check for AS4100


AS4100
610UB113 is compact
5.2.1 921.2 KNm
Ms = f y Z e = 280 x 3290 x 103/106 829.08 KNm

Փ Ms = 0.9 (912.2)

>M* = 100.32 KNm. Ok

AS4100
5.6.1.1 In stage 1, we assume the beam is unrestrained and subjected
to LTB.
Hence, we need to check Mb

AS4100 Assume PP restrain condition 1.03

( )
3

( )
5.6.3 1+2 α 1 k f 1+2× 572 17.3
3
( ) ( )
Kt = L 2tw = 16000 2× 11.2
ηw 1
K L = 1.0 ; K r = 1.0
16.480m
Le = K t K L K r L

= 1.03 x 1 x 1 x 16

√( )( ( ))
2
π EIy
2
π E I xx 167.73 KNm
M o= GJ+
L2e L2e

√( π 2 × 200000 ×34.3 ×106


16480
2 )( 3
80000 ×1140× 10 +
(
π 2 × 200000 ×29800.160
16480
2
×10 9
))
[ √( ) ( )]
2
Ms Ms
α x = 0.6 +3−
M oα M oα
213.2 KNm
191.9 KNm

[ √( ) ( )]
2
921.2 921.2
α = 0.6 +3−
167.73 167.73
AS4100
M1 = α m αs Ms = 1.35x0.160x987
5.11.1
Փ Mb = 0.9 (213.2) > M* ok

Check shear capacity

17.6 KN

1223.7 KN
15 1.26 ×16
V* = +
2 2
1101.3 KN
d 82 82
= 51.1 < = = 74.86
5 √ f y /250 √300 /250
AS2327
Vu = 0.6 f y A w = 0.6(300)(607)(11.2)/103
A.3.4.2 0.70 KPA
Vv = Vu
Appendix
Փ Vv = 0.9 (1223.7)=1101.3>17.6 KN ok 7.2 KN/m
8.25 KN/m
Construction Stage 3
0.6−1.0
Live load Q = 1.0 + (40-23)
46−23
Weight of fresh concrete = 24 x 2.5 x 0.12
Total dead load G = 1.05+7.2 403.2 KNm

100.8 KN

Design load w = 1.2 x 8.25 + 1.5 x 0.70 x 2.5


= 12.6 KN/m
2 2
wL 12.6 ×16
M* = =
8 8
wL 12.6 ×16
V* = =
2 2
Փ Ms = 829.08 KNm > 403.2 KNm ok
7.2
Փ Vs = 1101.3 KN > 100.8 KN ok
1.1
2.5
Design of B1 – In service condition 10.8 KN/m
12.5 KN/m
29.8 KN/m
Dead load
S.W of slab = 0.12 x 24 x 2.5
S.W of beam = 113 x 9.8/1000
GSDL = 1.0 x 2.5
Live load
Institutional (5.2) = 5.0 x 2.5
At ULS; w = 1.2 x 10.8 + 1.5 x 12.5

372.5 KNm
238.4 KN

AS2327
3.5.3

2 2
wL 29.8× 16
M* = =
8 8
wL 29.8× 16
V* = =
2 2
3.4.2

3.4.2.2 Assume: 1 shear stud per pan @ 200 c/c 2m


4m
3.4.2.2

3.2.3.2

Fig be1 = be2 = Lef/8


3.6.2.4.2 beff = bo +∑ be 1 = Փ + 2 (2)
Bondek
ribs of Bondek perpendicular to beam beff is determine in
catalog
3.4.2.1
Effective portion of steel beam
- Whole cross-section of steel beam if
B = 1.0 will be confirmed

T.3.6.2.4.2
Shear connection

1.99
3.6.2.3 138.9 KN
See stud
Catalog 138.7 KN

103.4 KN
nr = 1 4060 KN
k tmax = 0.75 7507.2 KN

( )
3.5.8.4.1 4060 KN
( )
0.7 b0 hsc 0.7 ×168 95
k t= −1 = −1
√ nr h p h p √ 1× 51 51

P RK = α shear d 2bs × f uc = 0.7 x 222 x 410/103


Note: shear stud = 22mm Փ Tension strength 410 N/mm2
3.5.4.2 P RK = 0.29d 2bs √ f 'cj Ec = 0.29 x 192 x√ 32× 301000 ×10−3

∴ P RK = 137.8 KN
Design shear resistance = K t P RK = 0.75 x 137.8
Agfy = 14500 (280)/103
0.85 f 'cj beff hc = 0.85(32)(4000)(69)/103
F cc = min { Agfy, 0.85 f 'cj beff hc}

' F cc 4060
n ci ≥ = = 39.3
P RK 103.4
Provide number of shear studs between
Pcc, and Pcc2 = 41>n’c’ (39.3) 252 N/mm2
∴ full shear connection is provided 3654 KN
ie β = 1.0 25.6 N/mm2
6005.8 KN
3654 KN
Design moment capacity
42 mm

408.5 mm

1492.7 KNm

3.8.2

fy1d = Փ fy = 0.9 (280)


445.7 KN/m
Ny1d = fy1dA = 252 (14500)/103
fcd = Փcf’c = 0.80 (32)
Nc1d = 0.85 fcdhcb = 0.85(25.6)(69)(4000)x103
Fig. 3.8.3
Fcc = min(Ny1d, Nc1d) = 3654 KN

Depth of concrete in compression


3654
dc = Fcc/ Nc1d = hc = (69)
6005.8
607 30
moment arm x = + 120−
2 2
Mbc = Fcc x = 3654 (408.5)/103
>M* = 372.8 KNm Ok

Design longitudinal shear


V*L = Fcc/sn =3654/(0.2x41)
Note: s = long distance between studs
= trough spacing of Bondek
Shear plane Type 1-1
Ats = Att + Abt = 260