Professional Documents
Culture Documents
Sumit Updated Alma Resume
Sumit Updated Alma Resume
SUMMARY OF SKILLS
• Sincere & diligent professional offering 9 years of wide spectrum of experience in Electrical Engineering,
skilled in planning & implementing the preventive, predictive & breakdown maintenance,
Desulphurizationoperation, site erection and commissioning of ash handling unit schedules for improving
the overall reliability and safety of plant equipments & machinery.
• Demonstrated abilities in formulating project plans and schedules while handling electrical
equipments,proficient in reviewing of project schedule, ensuring cost control within budget
• Understanding of conducting Root Cause Analysis while implementing process improvement and cost
reduction initiatives along with quality systems.
• Focused and hardworking professional equipped with thorough knowledge and technical understanding
coupled with an analytic bent of mind and confident to take challenging assignments.
PROFESSIONAL EXPERIENCE:
1. VICE PRINCIPAL-ALMA INTERNATIONAL SCHOOL-LUNAWADA JUNE 2019-PRESENT
2. Appropriate and exact delegation of responsibilities
3. Have learnt and used different techniques and tools of educating students for effective and efficient teaching
4. Acting as academic head of the school
5. Supporting teachers and coordinators on the content / curriculum / modules, their usage, applicability etc.
6. Monitoring the application of the developed content/ method/ technique in class rooms by regular checking of
student notebooks/ diaries / logbooks etc.
7. Providing timely feedback to the coordinators/teachers in terms of scope of improvement
8. Scheduling periodic meeting with the coordinators / principal
9. Responsible for the supervision and general discipline of the school
10. Monitoring Sports and Performing activities on a regular basis and plan and execute actions for improvement
11. Monitoring the registers maintained by the coordinators
12. Organizing annual functions, external competitions and external examinations.
13. Interacting with parents/ guardians, as and when required
14. Coordinating with the admin team for organizing events/programs etc
2. NILKANTH INTERNATIONAL SCHOOL-Jetpur, RAJKOT JUNE 2018-JUNE2019
Taking Math & Science classes
Ensuring Proper coordination of classes.
5. MECGALE PNEUMATICS PVT LTD, NAGPUR (Client ASH HANDLING SYSTEM, POWER PLANT)
ASSISTANT ENGINEER (ERECTION TESTING AND COMMISSIONING) JULY12-JAN13
• INVOLVED IN PROJECT EXECUTION OF INSTALLING ASH HANDLING MECHANICAL AND ELECTRICAL
EQUIPMENTS ENSURING PROPER COORDINATION WITH CLIENT AND CONTRACTOR
• PROACTIVE APPROACH WHILE FULFILLING PROPER DESIGN AND DRAWING ACCORDANCE OF WORK
6. JAMIPOL LTD (TATA GROUP COMPANY, OFFROLL THROUGH INDO INSTRUMENTS PVT LTD)
PROJECT ENGINEER (DESULPHURIZATION OPERATION AND MAINTENANCE)
• OVERVIEW AND KNOWLEDGE OF IRON AND STEEL INDUSTRY 2YEAR 5MONTH
• PROJECT OF HMPS(HOT METAL PRETREATMENT STATION) MANAGEMENT AND OPERATION
1. IT INCLUDE HOLISTIC APPROACH,SKILLS,CAPABILITIES TO DELIVER QUALITY
WORK FOR REMOVING SULPHUR CONTENT IN HOT METAL BY USING REAGENT
LIKE CALCIUM CARBIDE, MAGNESIUM, THROUGH PLC BASED OPERATION PANEL.
2. WHOLE OPERATION AS WELL TROUBLESHOOTING UNDER OUR SCOPE
3. OPERATION AIMED AT TO OPTIMIZE OPERATION AS WELL PROCESS COST IN TERMS OF QUALITY JOB
EDUCATIONAL CREDENTIALS
Class X; 2002
RPS, Darbhanga, Bihar, CBSE; 81%
Computer Proficiency
MS Office, AUTO CAD
Project Handled
• Automation of Batch Process using PLC
Workshop Attended
• Power Electronics conducted by IIT, Mumbai
Extra Curricular Activities
• Actively participated in Inter Institutional Cultural Event organized by Meghe Group
• Organized YCCE Fest 8.0 and represented as Co-head of the Hospitality Committee of the event
• Associated and organized SaraswathiPuja during the Hostel Day Celebration