Professional Documents
Culture Documents
Ahmed Abd Elghany CV
Ahmed Abd Elghany CV
personal data
-Internet browsing.
-Windows application.
I
Jobs
ATRIUM QUALITY CONTRACTORS
PROJECT:-
II
-ENGINEERING CONSULTANTS GROUP S.A (ECG)
III
Administration Building : 24.173m2
Barracks Building : 4460m2
Mosque : 768m2
Break Building : 735m2
Ground Total : 165.679m2
PROJECT:-
IV
-SAUDI ARABIAN BAYTUR CONSTRUCTION CO.
PROJECT:-
V
8. Arranging materials as per the site requirements/material requirements
- indents/proper storage
9. Checking the quality of materials and Test Results
10. Organize/Managing the site labors and distribute to proper works.
11. Preparing work report precisely and clearly for daily, weekly and
monthly.
12. Identify the areas for waste reduction and act on ways and measures to
minimize the wastage.
13. Attend weekly, monthly and other progress / technical meetings held at
the site as required. Review the sub contractor's progress. Identify
constraints and recommend corrective measures.
14. Coordination and evaluation of all consultant RFI responses.
15. To avoid/minimize wastage of materials/make arrangements for timely
order/indent, storage, usage of materials at site.
VI
sample of projects :-
VII
- Architect in SERICO for constructions.
VIII