Template-Risk KPI Review Register
Template-Risk KPI Review Register
Probability Severity Risk Rating Original Impact of Risk in ACE Revised Impact of Risk considered in Estimates
Accepted Risk Value Max Likely Risk Value Already Incurred Revised Max likely Risk Owner -
Sr. No. Identified Risk Risk Response / Mitigation Plan Provision
1 2 ( Impact 1*2 ) (% of Sales) (% of Sales) Risk Value Primary
AED % AED % AED % AED % AED %
A POLITICAL RISKS
1 Stability of Govt
a Political instatbility such as govt. changes 0
b Policy uncertainity 0
Legal and regulatory risks such as inconsistency in
c 0
enfircement of law, corruption, bureaucracy
Economic vulnerability such as high inflation,
d 0
currency devaluatiion
2 Political protest
a Civil unrest 0
b Political protests and coup 0
1 Force Majeur
a Frequency of Natural disasters 0
2 Pollution
a Restrictions due to rising pollution 0
b Restrictions due to water scarcity 0
c Restrictions due to land degradation 0
3 Geological hazards
a Presence of geological faults 0
b Volcanic eruptions 0
c Ground Stability 0
d Unanticipated hydrological condition 0
4 Coastal risks
a Coastal Risks 0
b Sea level 0
c Saltwater intrusion 0
6 Geophraphy
a Presence of extremists groups 0
b Project remoteness and security 0
C RESOURCES RISKS
a Skilled manpower availability 0
b Absentism and health 0
c High churn rate 0
JOB RISK REGISTER
Probability Severity Risk Rating Original Impact of Risk in ACE Revised Impact of Risk considered in Estimates
Accepted Risk Value Max Likely Risk Value Already Incurred Revised Max likely Risk Owner -
Sr. No. Identified Risk Risk Response / Mitigation Plan Provision
1 2 ( Impact 1*2 ) (% of Sales) (% of Sales) Risk Value Primary
AED % AED % AED % AED % AED %
d Appropriate machinary availability 0
e Machine break down 0
f Resource levelling & idling 0
g Bulk material availability 0
h Long lead procurement 0
i Client supplied materials 0
k Emiratisation/Locals hiring regulations 0
1 Regulatory changes
a Changes in regulation, policies, laws 0
b Lack of policies & procedures 0
F FINANCIAL RISKS
1 Cashflow challenges
a Project expenditure 0
b Planned value vs earned value discrepancies 0
Unrealised or delayed accounts receivable
c 0
(payment from client)
d Unapproved invoices 0
e Rejected invoices 0
Over obligations in accounts payables (payment to
f 0
subcontractor/supplier)
g Asset turnover 0
h Material procurement payments 0
3 Financing challenges
a Performance bonds 0
b Security retention 0
c Advance payment bonds 0
d Integrated JV 0
e Investor reluctance 0
f Tight credit market 0
g High interest rate 0
h Insufficient insurance coverage 0
i Foreign exchange currency fluctutaions 0
Taxes & duties - sales tax, service tax, VAT,
j 0
export benefit
G COUNTRY RISKS
a Political support 0
b Immigration laws 0
c Visa availability 0
d People & culture 0
e Repatriation of funds 0
f Taxation laws 0
g Resource availability 0
b Quantity Variation
(i) Variation in earthwork quantities & layout 0
(ii) Variation in concrete quantities & layout 0
(iii) Variation in MEP & utilities quantities & layout 0
Variation in building finishes & interior designing
(iv) 0
(ID) elements
c Delay in design 0
a Religious structures 0
b Electric lines 0
c Electric crossings 0
d OFC cables 0
e Cutting of trees 0
15 Project Safety
a Safety training completion rating 0
b Personal safety equipment 0
c HSE plans & QA/QC plans 0
d Near miss reporting rates 0
e Accident reporting 0
Most Likely
1a(iii)
(5)
Likely
2c
(4)
Probability
Possible
(3)
Unlikely
(2)
Rare
(1)
Extreme
Minor Moderate Major
Insignificant (1)
(2) (3) (4)
(5)
Severity
Upto 0.2% Upto 0.5% Upto 1% change Upto 2.0% More than 2.0%
change in CV change in CV in CV change in CV change in CV
Amount (in
Lacs) 0.20% 0.50% 1.00% 2.00% 3.00%
L Low 0<L<4
M Medium 5<M<8
Most Likely
1 1 1 1
(5)
Likely
1 4 5 2
(4)
Probability
Possible
2 5 1
(3)
Unlikely
3 8 1
(2)
Rare
3 3 3
(1)
Extreme
Minor Moderate Major
Insignificant (1)
(2) (3) (4)
(5)
Severity
Upto 0.2% Upto 0.5% Upto 1% change Upto 2.0% More than 2.0%
change in CV change in CV in CV change in CV change in CV
Amount
(in Lacs) 0 0 0 0 0
L Low 15
M Medium 18
H High 8
C Critical 4