1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

2M 4M

1M 3M

160
50 50 30 K-Electric Limited
Comments sent vide KE/TEG & NESPAK & RE2
Letter No. :_______________Date:_________________
50 50 40

900 MW BQPS-III Combined Cycle Plant & Associated Transmission


Projects PAKISTAN Tractebel Engineering GmbH
265

240

The drawing / document has been checked to ensure compliance with the
Contract. The approval status shall be interpreted as laid down in the
Contract and shall not relieve the Contractor form his contractual
obligations. Renewable Resources(Pvt.) LTD
Cat. 1 [ ]APPROVED
Harbin Electric International Co., Ltd
135

Cat. 2 [ ]APPROVED EXCEPT AS NOTED


Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
COMMENT SHEET NUMBER:_____________________________________ Northeast Electric Power Design Institute CO.,LTD.
China Power Engineering Consulting Group
DATE:__________________________

SIGNATURES:__________________________________________________