Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Trust • Pioneer • Challenge

May 27, 2024

Irma C. Exconde
Director IV, Electric Power Industry
Management Bureau (EPIMB)
Department of Energy

Subject: Request Letter of Endorsement to Undertake System Impact Study

Dear Director Exconde:

As a requirement under the guidelines for the Issuance of Certificate of Compliance by National Grid
Corporation of the Philippines (NGCP), we would like to request a Certificate of Endorsement (COE)
for TPC I Corp, San Carlos Solar Power 2 project.

Attached are the following:


 Letter of Request
 Company Profile
 Project Background/Description
(Exact location, official name of the facility, commissioning data and off taker of the electricity)
 Copy of Certificate of Registration
 Copy of Service Contract

Enclosed is the notarized Authorized Representative Board Resolution of corporation for reference.

Thank you and best regards.

Very truly yours,

Ronald Castillo
TPC I Corp.
Authorized Representative
Email address: tpconecorp@gmail.com
Mobile No: (034) 432-6384 / 09177062376 / 09557769009

MBG Bldg., Second Floor, Room 3A/4A, Hilado Ext. Street, Barangay Villamonte, Bacolod City, Negros Occidental, Philippines
Tel : +63) 034-432-6384 E-mail : tpcphil21@gmail.com 1/1