Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

IE 19 DE ABRIL

HVAC Load Analysis


for

Prepared By:

Ing. Carlos Uceda

miércoles, 13 de marzo de 2024


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 2

General Project Data Input


General Project Information
Project file name: C:\Users\Usuario\Desktop\ATLANTA SISTEMAS\PPTO COLEGIOS\elite
modulo de conectividad\CALCULO TERMICOS MOD CONECTIVIDAD IE 19
DE ABRIL REV13032024.CHV
Project title: IE 19 DE ABRIL
Designed by: Your Name
Project date: Sunday, Octuber 01, 2023
Project comment: To create a template from an existing project, open the project and select 'File
Weather reference city: JUNIN, PERU
Company representative: Ing. Carlos Uceda
Barometric pressure: 18,204 in.Hg.
Altitude: 13123 feet
Latitude: -11 Degrees
Mean daily temperature range: 11,5 Degrees
Starting & ending time for HVAC load calculations: 6pm - 12am
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Cooling loads only
Lighting requirements: 2,80 Watts per square foot
Equipment requirements: 0,00 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 225 Btuh per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 0 %
People diversity factor: 80 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 8,50 feet
Building default wall height: 10,60 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C 0 0 0 0 0 0 0
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 72 69 50% 70 82,68 -11
February 72 69 50% 70 82,68 -11
March 72 69 50% 70 82,68 -11
Winter 58 58

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0,685 No Sí
2 4 0,685 No Sí
3 4 1,100 No Sí

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0,390 D

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0,350 10 0
2 0,350 10 0
3 1,100 10 0

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1,018 1,100 0,700 2 0,700
2 1,000 1,000 0,400 1 0,400
3 1,000 1,000 0,600 1 0,600

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 4

Air Handler Input


Air Handler Number 1 Input Data
Name:
Terminal type: Constant Volume
Method for CV Sum of Peaks
Supply fan type: Package fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 0
Equipment profile number: 0
Exhaust may not exceed supply air: No
Leaving heating coil temp (deg.F): 95,0
Leaving cooling coil temp (deg.F): 55,0
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 80
Static pressure across fan (in.wg.): 2,20
Summer supply duct temp rise (deg.F): 0,000
Summer return duct temp rise (deg.F): 0,000
Winter supply duct temp drop (deg.F): 0,000
Winter return duct temp drop (deg.F): 0,000
Chilled water temp difference (deg.F): 10,000
Hot water temp difference (deg.F): 20,000
Cooling ventilation: 10 AC/Hr
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 Direct
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor


Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 72 69 50% 70 82,68 -11
February 72 69 50% 70 82,68 -11
March 72 69 50% 70 82,68 -11
Winter 58 58

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 5

Zone Input
Zone 1: MODULO DE CONECTIVIDAD 1 (345,6 sq.ft) (Group 0)
Air Handler number: 1 Zone occurrences: 1
Zone length: (feet) 32,00 Zone width (feet): 10,80
Lighting Watts: 968 Equipment Watts: 10.000
Number of people in zone: 4 People profile number: 1
Lighting profile number: 1 Equipment profile number: 1
Ceiling height (feet): 8,50 Heating safety factor (%): 0
Sensible safety factor (%): 10 Latent safety factor (%): 10
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 225
Cooling ventilation method: CFM/Pr Cooling ventilation value: 35,000
Cooling infiltration method: Direct Cooling infiltration value: 0,000
Heating ventilation method: Direct Heating ventilation value: 0,000
Heating infiltration method: AC/Hr Heating infiltration value: 0,000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 346 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Part Type U-Factor Cool TD Heat TD Height Width Area


2 1 0,35 10,000 0,000 32,00 10,80 345,6

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 6

Building Summary Loads


Building peaks in March at 6pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 0 0 0,00 0 0 0 0,00
Wall 0 0 0,00 0 0 0 0,00
Glass 0 0 0,00 0 0 0 0,00
Floor Slab 0 0 0,00 0 0 0 0,00
Skin Loads 0 0,00 0 0 0 0,00
Lighting 968 0 0,00 0 3.632 3.632 7,44
Equipment 10.000 0 0,00 0 37.534 37.534 76,90
People 3 0 0,00 792 880 1.672 3,43
Partition 346 0 0,00 0 1.331 1.331 2,73
Cool. Pret. 0 0 0,00 0 0 0 0,00
Heat. Pret. 0 0 0,00 0 0 0 0,00
Cool. Vent. 140 0 0,00 4.524 -94 4.430 9,08
Heat. Vent. 0 0 0,00 0 0 0 0,00
Cool. Infil. 0 0 0,00 0 0 0 0,00
Heat. Infil. 0 0 0,00 0 0 0 0,00
Draw-Thru Fan 0 0 0,00 0 0 0 0,00
Blow-Thru Fan 0 0 0,00 0 0 0 0,00
Reserve Cap. 0 0 0,00 0 212 212 0,43
Reheat Cap. 0 0 0,00 0 0 0 0,00
Supply Duct 0 0 0,00 0 0 0 0,00
Return Duct 0 0 0,00 0 0 0 0,00
Misc. Supply 0 0 0,00 0 0 0 0,00
Misc. Return 0 0 0,00 0 0 0 0,00
Building Totals 0 0,00 5.316 43.494 48.811 100,00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0,00 4.524 -94 4.430 9,08
Infiltration 0 0,00 0 0 0 0,00
Pretreated Air 0 0,00 0 0 0 0,00
Zone Loads 0 0,00 792 43.588 44.380 90,92
Plenum Loads 0 0,00 0 0 0 0,00
Fan & Duct Loads 0 0,00 0 0 0 0,00
Building Totals 0 0,00 5.316 43.494 48.811 100,00

Check Figures
Total Building Supply Air (based on a 15° TD): 4.342 CFM
Total Building Vent. Air (3,22% of Supply): 140 CFM
Total Conditioned Air Space: 346 Sq.ft
Supply Air Per Unit Area: 12,5640 CFM/Sq.ft
Area Per Cooling Capacity: 85,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0118 Tons/Sq.ft
Heating Capacity Per Area: 0,00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4,07 Tons

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 7

Air Handler #1 Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
MODULO DE
346 0 43.596 990 None 35/P
1 CONECTIVIDAD 1
4 0 4.343 0 0 140
12am March
2.938 0,00 12,57 0 0 140

Zone Peak Totals: 346 0 43.596 990


Total Zones: 1 4 0 4.343 0 0 140
Unique Zones: 1 2.938 0,00 12,57 0 0 140

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 8

Air Handler #1 Total Load Summary


Air Handler Description: Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0,98 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in March.
Outdoor Conditions: Clg: 70° DB, 68° WB, 172,40 grains
Indoor Conditions: Clg: 70° DB, 50% RH
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (,608 X 1,08 X 0) = 0 CFM
Winter Vent Outside Air (0,0% of supply) = 0 CFM
Zone space sensible gain: 43.376 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 212 Btuh
Total sensible gain on supply side of coil: 43.588 Btuh
Cooling Supply Air: 43.588 / (,608 X 1,1 X 15) = 4.342 CFM
Summer Vent Outside Air (3,2% of supply) = 140 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -94 Btuh 140 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -94 Btuh
Total sensible gain on air handling system: 43.494 Btuh
Zone space latent gain: 792 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 4.524 Btuh
Total latent gain on air handling system: 5.316 Btuh
Total system sensible and latent gain: 48.811 Btuh

Check Figures
Total Air Handler Supply Air (based on a 15° TD): 4.342 CFM
Total Air Handler Vent. Air (3,22% of Supply): 140 CFM
Total Conditioned Air Space: 346 Sq.ft
Supply Air Per Unit Area: 12,5640 CFM/Sq.ft
Area Per Cooling Capacity: 85,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0118 Tons/Sq.ft
Heating Capacity Per Area: 0,00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4,07 Tons

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 9

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-MODULO DE CONECTIVIDAD 1 peaks (sensible) in March at 12am, Air Handler 1, Group 0, 32,0
x 10,8, Construction Type: 19 (Light)
Partition-2-1 345,6 10/0 0,350 1.210 0,000 0
Lights-Prof=1 968 1,000 3.302
Equipment-Prof=1 10.000 1,000 34.121 0
People-Prof=1 4,0 1,000 1.000 900
Sub-total 39.633 900 0
Safety factors: +10% +10% +0%
--------- --------- ---------
Total w/ safety factors: 43.596 990 0

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 10

Air System #1 () Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 89,827 55,000
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 0 0,000 0
Zone Loads 792 0,441 43.376 14,927 4.321
Sensible Reserve 212 0,073 21
Zone Condition 792 90,268 43.588 70,000 4.342
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 140 CFM 4.524 2,572 -94 -0,032
Blow-Thru Fan 0 0,000
Entering Coil Condition 5.316 92,840 43.494 69,968 4.342

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,608 x 1,10 x 4.342 x( 69,968 - 55,000 )= 43.494 Btuh


TLH = 0,608 x 0,68 x 4.342 x( 92,840 - 89,827 )= 5.412 Btuh
----------
SUM = 48.906 Btuh
GTH = 0,608 x 4,50 x 4.342 x( 31,279 - 27,131 )= 49.306 Btuh
Total System Load = 48.811 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 49.306 / ( 10,00 x 500 ) = 9,9 GPM
Heating GPM = 0 /( 20,00 x 500 ) = 0,0 GPM
Steam Req. = 0 / 970 = 0,0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69,97 Dry bulb temperature: 58,00
Wet bulb temperature: 56,79
Relative humidity: 51,46
Enthalpy: 31,28 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,00 Dry bulb temperature: 58,00
Wet bulb temperature: 51,85
Relative humidity: 84,44
Enthalpy: 27,13 Btu/lbm

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 11

Building Pie Charts


Building peaks in March at 6pm.

Reserve Cap. - 0,43%


Lighting - 7,44% Cool. Vent. - 9,08%
Partition - 2,73%
People - 3,43%

Building
Net Gain
48.811
Btuh

Equipment - 76,90%

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00

You might also like