Air System Sizing Summary for ARENA TUTUP KOMPLEKS SUKAN BUKIT MERBAU

(In Alternative: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU)


Project: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU(converted) 05/
Prepared by: Carrier Malaysia Sdn Bhd 7:13 PM
Air System Information
Air System Name ARENA TUTUP KOMPLEKS SUKAN BUKIT Number of zones 1
MERBAU Floor Area 53860.5 sqft
Equipment Class CW AHU Location Kota Bharu, Malaysia
Air System Type SZCAV

Sizing Calculation Information


Calculation Months Jan to Dec Zone CFM Sizing Sum of space airflow rates
Sizing Data Calculated Space CFM Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 477.2 Tons Peak coil load occurs at May 17:00
Total coil load 5726.2 MBH OA DB / WB 89.8 / 79.4 F
Sensible coil load 3928.2 MBH Entering DB / WB 74.9 / 65.5 F
Coil CFM at peak load 181056 CFM Leaving DB / WB 55.2 / 55.1 F
Sum of peak zone CFM 181056 CFM Resulting RH 60 %
Sensible heat ratio 0.686 Design supply temp. 55.0 F
CFM/Ton 379.4 Zone T-stat Check 1 of 1 OK
sqft/Ton 112.9 Max zone temperature deviation 0.0 F
BTU/(hr sqft) 106.3
Water flow @ 10.0 F rise 1145.84 gpm

Supply Fan Sizing Data


Design CFM 181056 CFM Fan motor BHP 148.76 BHP
Design CFM/sqft 3.36 CFM/sqft Fan motor kW 118.01 kW
Fan total static 3.00 in wg

Outdoor Ventilation Air Data


Design airflow CFM 16061 CFM CFM/person 10.96 CFM/person
CFM/sqft 0.30 CFM/sqft

Hourly Analysis Program 6.2 Page 1 of 3


Zone Sizing Summary for ARENA TUTUP KOMPLEKS SUKAN BUKIT MERBAU
(In Alternative: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU)
Project: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU(converted) 05/
Prepared by: Carrier Malaysia Sdn Bhd 7:13 PM
Air System Information
Air System Name ARENA TUTUP KOMPLEKS SUKAN BUKIT Number of zones 1
MERBAU Floor Area 53860.5 sqft
Equipment Class CW AHU Location Kota Bharu, Malaysia
Air System Type SZCAV

Sizing Calculation Information


Calculation Months Jan to Dec Zone CFM Sizing Sum of space airflow rates
Sizing Data Calculated Space CFM Sizing Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Capacity gpm Capacity gpm Airflow
Zone Name (CFM) (CFM) CFM/sqft (MBH) @ 20.0 F (MBH) @ 20.0 F (CFM)
ARENA 1 181056 181056 3.36 0.0 0.00 0.0 0.00 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (MBH) Cooling Load (MBH) (sqft)
ARENA 1 3260.5 May 17:00 30.4 53860.5

Hourly Analysis Program 6.2 Page 2 of 3


Zone Sizing Summary for ARENA TUTUP KOMPLEKS SUKAN BUKIT MERBAU
(In Alternative: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU)
Project: ARENA TERTUTUP KOMPLEKS SUKAN BUKIT MERBAU(converted) 05/
Prepared by: Carrier Malaysia Sdn Bhd 7:13 PM
Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name (MBH) Load (CFM) (MBH) (sqft) CFM/sqft
ARENA 1
ARENA 1 148.8 June 18:00 7490 1.0 1168.4 6.41
ARENA 2 190.4 April 18:00 9585 1.2 1231.2 7.78
ARENA 3 84.6 May 17:00 4259 0.7 1172.7 3.63
ARENA 4 312.3 January 17:00 15725 4.5 1800.6 8.73
ARENA 5 310.6 January 17:00 15637 4.5 1785.6 8.76
ARENA 6 106.6 April 15:00 5365 0.8 790.8 6.78
ARENA 7 110.4 April 14:00 5559 0.8 781.4 7.11
ARENA 8 159.1 June 17:00 8010 1.1 1214.1 6.60
AV 7.9 May 17:00 399 0.1 215.9 1.85
BILIK KAWALAN (1) 3.1 May 17:00 157 0.0 12.6 12.46
BILIK VVIP 16.5 May 17:00 831 0.2 543.5 1.53
BINCANG 20.3 June 19:00 1024 0.2 171.3 5.98
DOPPING 26.3 June 17:00 1326 0.3 546.9 2.42
DUDUK VIP 24.1 April 17:00 1214 0.3 644.3 1.88
FOYER VIP 168.3 June 18:00 8472 1.7 872.9 9.71
GELANGGANG SUKAN SERBAGUNA 1547.7 May 17:00 77928 9.0 36670.7 2.13
KAWALAN 10.6 April 17:00 535 0.2 265.9 2.01
LOBBY 71.1 April 15:00 3581 0.9 1008.2 3.55
MEDIA 8.5 May 17:00 427 0.1 228.4 1.87
MENUNGGU 13.2 May 17:00 667 0.2 448.0 1.49
PEJABAT 83.1 June 19:00 4182 0.8 527.5 7.93
PENGADIL 19.1 May 17:00 960 0.2 527.9 1.82
PENGAWAL 9.1 May 17:00 459 0.1 194.0 2.36
PENGAWAL 1 5.5 May 17:00 277 0.1 98.6 2.81
SURAU (LELAKI) 16.7 May 17:00 841 0.3 329.9 2.55
SURAU (PEREMPUAN) 44.6 April 19:00 2244 0.6 307.9 7.29
TIKET 1 33.7 January 15:00 1695 0.2 91.0 18.64
TIKET 2 36.2 June 15:00 1823 0.2 95.8 19.02
UTILITI 7.6 May 17:00 383 0.1 114.3 3.35