Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE 1 :

CLEAR CLEAR CLEAR


1. LOCATE TOP BAR SPLICES @ MIDSPAN OF BEAM CANTILEVER SPAN 1 SPAN 2
LENGTH OF SPLICE = 40 DIA OF BAR. 0.75(CL) 0.75(CL) SPLICE 0.25(L1) 0.25(L1) 0.25(L2)+12D
or 0.25(L1) or 0.25(L1) (NOTE 1) or 0.25(L2) or 0.25(L2) or 0.25(L3) SHORT SPAN LONG SPAN
2. LOCATE BOTTOM SPLICES AWAY FROM COLUMN ( MAX. ) ( MAX. ) ( MAX. ) ( MAX. ) ( MAX. )
FACE EQUAL TO TWO TIMES BEAM HEIGHT(H) = = L/4 L/2 L/4 L/4 L/2 L/4
TOP WEB
B 50 50 C 50 50 BARS 50 BARS
( i.e. d, no. of splice = 2 x H ) L L R L R EXTRA TOP BARS EXTRA TOP BARS EXTRA TOP BARS EXTRA TOP BARS
CONTINUOUS CONTINUOUS
LENGTH OF SPLICE = 40 DIA. OF BAR EXTERIOR INTERIOR BOTTOM BARS EXTERIOR INTERIOR BOTTOM BARS
3. PROVIDE CLOSE STIRRUPS ALONG LENGTH OF
SPLICING EQUAL TO 100mm O.C. m
m
( See FIGURE 1 ) 75
H

db 6
135° = = EXTRA BOT. BARS EXTRA BOT. BARS
HOOK BOTTOM
B 1.3 ld BARS ( OMIT For ( OMIT For
75 EQ. EQ. EQ. EQ. EQ. EQ. 75 ONE-WAY SLAB) ONE-WAY SLAB)
FIGURE 1 L1/6 MS L1/6 L2/6 MS L2/6 L/6 L/6 L/6 L/6
SECTION STIRRUPS HOOPS STIRRUPS HOOPS HOOPS STIRRUPS HOOPS
STIRRUPS: CANTILEVER BEAMS (NOTE 2) (NOTE 2) (NOTE 2) (NOTE 2)
( WHERE OCCURS )
SLAB REINFORCEMENT LAY-OUT Along SHORT SPAN SLAB REINFORCEMENT LAY-OUT Along LONG SPAN
A- Ø10, 1 @ 50, REST @ 150 O.C. HOOPS TYPICAL BEAM ELEVATION
L
B- Ø10, 1 @ 50, REST @ 100 NOTE 2 : ONE WAY SLAB =
S
> 2.0
NOTES:
C- Ø10, 3 @ 50, REST @ 250
S C H E D U L E O F R. C. S L A B L
TWO WAY SLAB = S < 2.0
LONG SPAN SHORT SPAN
1. ON PLACEMENT OF BARS FOR BOTH ONE-WAY SLAB & TWO-WAY SLAB.
S C H E D U L E O F R. C. B E A M S SLAB T
BOTTOM BARS EXTRA TOP BARS BOTTOM BARS EXTRA TOP BARS 1.1 BOTTOM BARS ALONG SHORT SPAN SHALL BELOW THOSE LONG SPAN.
MARK (mm) CONT. EXTRA INTERIOR EXTERIOR CONT. EXTRA INTERIOR EXTERIOR 1.2 TOP BARS ALONG SHORT SPAN SHALL BE ABOVE THOSE LONG SPAN.
BEAM BEAM DIMENSION REBARS MAIN BEAM REINFORCEMENT WEB BARS STIRRUPS
SIZE 1.3 FOR TWO ADJACENT SLAB OF DIFFERENT MARK. THE SMALLER SPACING
LOCATION
LEFT MIDSPAN RIGHT CANTILEVER OF TOP BARS AT COMMON CONTINUOUS SUPPORT SHALL BE USED.
MARK B (mm) H (mm) (mm) SIZE EF SIZE MARK S-1 100 10Ø 250 10Ø 250 10Ø 250 10Ø 250 10Ø 250 10Ø 250 10Ø 250 10Ø 250
TOP BOT. TOP BOT. TOP BOT. TOP BOT. EXTRA 2. 1.4 PROVIDE 20mm CLEAR CONCRETE COVER.
2B-1 200 300 4-Ø16 2-Ø16 2-Ø16 2-Ø16 4-Ø16 2-Ø16 . . 10Ø A
3. SUBMIT LOCATION OF CONSTRUCTION JOINTS PER FLOOR FOR APPROVAL.
2B-2 200 300 4-Ø16 3-Ø16 2-Ø16 3-Ø16 4-Ø16 3-Ø16 10Ø A
2nd FLOOR BEAMS FOR TEMPORARY STORAGES OF HEAVY MATERIALS DURING CONSTRUCTION,
AVOID DIRECT LOADING ON SUSPENDED SLAB. LOCATE AREAS OF STORAGE
CB-1 200 300 4-Ø16 3-Ø16 2-Ø16 10Ø A OF MAIN BEAM/GIRDERS WITH SUPPORTING SPREADER BEAMS UNDERNEATH.
MRB-1 175 300 4-Ø12 2-Ø12 2-Ø12 2-Ø12 4-Ø12 2-Ø12 10Ø A SUMBIT LOADING CALCULATION FOR CHECKING BEAM ADEQUACY.
ROOF BEAMS
CB-2 175 300 4-Ø12 3-Ø12 2-Ø12 10Ø A
Republic Act 545 ARCHITECT ENGINEER
A B C D
7.90
0.60 3.80 2.70 0.80 A B C D A B C D A B C
3.50 3.00 7.30 .60 6.50
7.30 .60 6.50 .60
.60 3.80 2.70 0.80 3.80 2.70 0.80 3.80 2.70
PROPERTY LINE
3.25 3.25
100x50x1.6mm. C-PURLINS
SPACED @ ±0.60 O.C. (TYP.)
with 10mmØ SAGRODS
PROPERTY LINE

SPACED AS SHOWN
TERMINATED
COLUMNS @
2nd FLOOR LVL.

.60 .60

.60
2B-1 PC-1 2B-1 RB-1 RB-1
1'

1'

1'
CB-1

CB-2
0.60

CB-1

.60
FTB FTB
1

1
C-1 C-1a C-1
F-2 F-1 F-2
S-1 S-1
2.50

2.50

2.50

2.50
RB-1
2B-1

2B-1
FTB

RB-1
2B-1
FTB

.60
WF-2 ROOF SLOPE
CB-1 2B-1 2B-1 RB-1 RB-1 RB-1
2

2
6.80

6.80
T-1

T-1

T-1
C-1 C-1a
F-1 C-1
F-1 ELEV. @ -.05 F-1 S-1 ROOF SLOPE
ELEV. @ -.05
LT-1

RB-1

RB-1
2B-1

2B-1

2B-1
3.70

3.70

3.70

3.70
FTB

FTB

T-3
Up WF-2 S-1
10.55

10.55

10.55
9.35

1 H
T- T-
ELEV. @ -.05 H 1
2B-1 CB-1
3

3
FTB CB-1 2B-1 CB-2 RB-1 RB-1

.60

.60
C-1
C-1 C-1 F-1 T-2

ROOF SLOPE

ROOF SLOPE
F-1 F-1
102mm THK SLAB
PROPERTY LINE

2B-2
ON FILL W/10Ø

2B-1

RB-1
2B-1
FTB

FTB

S-1
3.15

3.15

3.15

3.15

3.15
RB-1
@0.30m OC. BARS
S-1

3.75
STEEL TRELLIS with STEEL TRELLIS with
BOTHWAYS

3.15
ELEV. @ -.05 POLYCARBONATE POLYCARBONATE
SKYLIGHT ROOFING SKYLIGHT ROOFING
CARPORT 2B-2
ELEV. @ -0.10
4

4
CB-1

CB-2

CB-2
FTB BALCONY

0.60
C-1 C-2

.60

.60

.60
C-1
F-2 F-1 F-2 T-2
2B-1 RB-1

.60
S-1 TERMINATED

2B-2
2B-1
COLUMNS @
3.13

2nd FLOOR LVL.

2.53
C-3 C-3
F-2 F-2 ELEV. @ -.05 .60 4.00 3.60 .60 4.00 .60
2B-2
PROPERTY LINE
3.80 3.50 3.80 3.50
3.27 7.30 1.45
1 2 3 4
S 1 S 2 S 2 S 2
Republic Act 545 ARCHITECT CIVIL ENGINEER PROJECT TITLE/LOCATION APPROVED BY: SHEET CONTENTS SHEET NO.
FOUNDATION PLAN
2nd FLOOR FRAMING PLAN
ROOF BEAM FRAMING PLAN
ROOF FRAMING PLAN
R.C. BEAM DETAIL & SCHEDULE S-2
PTR NO. PRC REG. NO. PTR NO. PRC REG. NO.
R.C. SLAB DETAIL & SCHEDULE
ISSUED ON: T.I.N. . ISSUED ON: T.I.N. . design by: cadd by: date cadd: checked by:
ISSUED AT: PASIG CITY ISSUED AT: MAKATI CITY OWNER SHEET__OF__

You might also like