PLANS GF - 3RD FLOOR - Fabella

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

LINE FROM GF DIVERTER PROPOSED

LINE TO 3F DIVERTER EVACUATION


LINE FROM GF DIVERTER AREA
LINE TO 3F DIVERTER

PANTRY
CHAIRMAN'S MAMMOGRAPHY ULTRASOUND
STAFF LOUNGUE/ HEAD'S A= 15.13 sq.m. DN
OFFICE ROOM ROOM OFFICE CHILLER DN
PANTRY / LOCKER RM./ A= 15.45 sq.m. A= 28.93 sq.m. RAD TECH ROOM UP
ELECTRICAL ROOM CLINICAL A= 13.65 sq.m. BLOOD A= 15.58 sq.m. ROOM
MALE AND FEMALE A= 15.13 sq.m. MAIN
A= 67.88 sq.m. TOILET CHEMISTRY COLLECTION A= 12.82 sq.m.
RAMP DN
UP
A= 55.24 sq.m. MOLECULAR & IMMUNOLOGY A= 41.04 sq.m. UP
UP
PATHOLOGY HEMATOLOGY SEROLOGY CONFERENCE UP
MALE
TOILET
WAITING
AREA
DN DN
A= 51.38 sq.m. COAGULATION A= 56.85 sq.m. (PATHO OFFICE)
A= 85.93 sq.m. A= 38.96 sq.m.
INTERVIEW EXAMINATION/TREATMENT AREA
P.E. ROOM CONFERENCE PHARMACY A= 193.23 sq.m. FEMALE
ROOM PTS STATION TOILET
A= 13.34 sq.m. FLOUROSCOPY FLOUROSCOPY
A= 20.67 sq.m.
X-RAY (A) X-RAY (B) STORAGE
DISHWASHING A= 26.67 sq.m. A= 26.31 sq.m. A= 11.47 sq.m. PANTRY DISPENSING ADMITTING
LABORATORY SWITCH BOARD
AREA LABORATORY DEPARTMENT PTS STATION
FILM FILE
ROOM WAITING AREA WAITING AREA
A= 9.96 sq.m. AREA
A= 18.56 sq.m.
WAITING
AREA A= 12.71 sq.m.
AREA
A= 12.71 sq.m.
NURSE STATION
A= 93.01 sq.m. MALE
PWD
TOILET TRIAGE
A= 96.24 sq.m. WASTE A= 24.26 sq.m. A= 26.24 sq.m. A= 6.51 sq.m. TOILET
A= 16.38 sq.m. AREA WAITING AREA
HOLDING ROOM WASHING / CONFERENCE FEMALE A= 17.76 A= 57.15 sq.m.
STORAGE REC/REL STORAGE REC/REL REC/REL TOILET
A= 9.75 sq.m. STERILIZING
A= 7.00 sq.m. A= 18.79 sq.m. A= 7.00 sq.m. A= 18.79 sq.m. A= 8.45 sq.m. RADIOLOGY DEPARTMENT ROOM
A= 33.21 sq.m.
PACU
A= 9.76
EMERGENCY
ROOM
TOILET sq.m.
A= 19.20 sq.m. EXTRACTION RELEASING BILLING & CLAIMS PHARMACY
EQUIPMENT AREA A= 10.83 sq.m. TA= 559.94 sq.m. PTS STATION DEPARMENT sq.m. PTS STATION

LINE OF EXISTING ADOBE FENCE


STORAGE A= 3.55 sq.m. DEPARTMENT
STAFF AREA
A= 10.51 sq.m. OF LINE TO 3F DIVERTER
ISOLATION
A= 61.86 sq.m.
MATERIALS
STORAGE/ HISTOPATHOLOGY MICROBIOLOGY BLOOD BANK CONTROL MRI SCANNER MRI COMPONENT
STAFF AREA STAFF AREA
A= 117.07 sq.m.
MAIN LOBBY EMERGENCY
MEDICINE
EMERGENCY DEPARTMENT ROOM
A= 21.21 sq.m.
FREEZER MANAGEMENT
STOCK ROOM OFFICE A= 55.18 sq.m. CLINICAL MICROSCOPY A= 82.24 sq.m. CT SCAN
A= 75.80 sq.m. STORAGE A= 20.52 sq.m.
WAITING AREA ROOM ROOM ROOM ROOM A= 38.28 sq.m.
RECEPTION
& A= 55.18 sq.m. A= 55.18 sq.m. READING ROOM A= 31.07 sq.m. A= 22.03 sq.m. A= 38.84 sq.m. A= 21.68 sq.m. A= 5.10
STORAGE A= 44.98 sq.m. HEAD
COMP. AREA INFORMATION
OFFICE OF THE AREA DECONTAMINATION
CHILLER A= 11.25 sq.m. SERVER sq.m. A= 61.86 sq.m.
AREA
A= 18.86 sq.m. ROOM CASHIER BILLINGS
PHARMACIST
A= 10.76 sq.m.
TPN AREA
A= 7.29
DESK
A= 16.67 sq.m. MALASAKIT HEAD
DOCTORS
ON DUTY
PANTRY
A= 7.15
VIOLENCE
AGAINST
WOMEN
A= 50.60 sq.m. ROOM
A= 21.21 sq.m.
UP

PROPOSED
A=14.07 sq.m. STORAGE CENTER A= 28.60 sq.m. A= 10.28
sq.m.
A= 8.36 sq.m. DEPARMENT ROOM
A= 5.14
AND CLAIMS
sq.m.
A= 59.10 sq.m.
sq.m. A= 14.21 sq.m.
EVACUATION
RECEIVING DEPARMENT TOILET
AREA
HUMAN MILK BANK
sq.m.

LOCKERS
AREA
A= 12.58 sq.m. STORAGE A= 6.98 sq.m.
TA= 81.86 sq.m. VAULT ROOM
A= 6.45 A= 46.88 sq.m. UP

.
DRY UP NUTRITION sq.m.
CHEIEF STAFF AREA MBFH LACTATION UP
STORAGE CLINIC LOCKER AREA OFFICE STATION

FIRE ESCAPE
PANTRY
DIETITIANS A= 47.75 sq.m. SERVING AREA AND DISTRIBUTION AREA A= 8.31 sq.m. A= 12.72 sq.m. A= 7.54 sq.m.

STAIRS
A= 38.32 sq.m. A= 17.07sq.m. WITH MALE AND

T
OFFICE A= 87.33 sq.m.
FEMALE TOILET OFFICE OF
A= 13.93 sq.m. CHIEF
NUTRITION AND DIETETICS DEPARTMENT
UP STAFF DINING A= 54.45 sq.m. COUNSELLING PANTRY OUTPATIENT DEPARTMENT FEMALE PWD MALE
OFFICE
THE HEAD
A= 18.60 sq.m.
TRIAGE

S
A= 54.22 sq.m. ROOM A= 6.24 sq.m.
TOILET TOILET TOILET A= 18.56 sq.m. PANTRY RAMP UP
A= 14.14 sq.m.
(CAFETERIA) A= 11.23 sq.m.

SPECIAL DIET PREPARATION AREA COOKING AREA


AREA (VEGETABLE / MEAT AND FISH) A= 77.75 sq.m. OFFICE AREA COLLECTION
A= 246.26 sq.m.
A= 20.66 sq.m.
A= 20.61 sq.m. A= 76.26 sq.m. A= 14.14 sq.m.

N
LINE OF EXISTING ADOBE FENCE
UP UP

DN DN

A
ER
PEDESTRIAN

M
RAMP

U
DN DN

DN UP

Y A
T
EXISTING
BALETE TREE
PROPOSED
EVACUATION
CREMATORIUM AREA

GUARD
HOUSE

D R I V E W A Y UP

MAIN ENTRY
DOH ENTRY
PROPOSED
EVACUATION
AREA

SECOND FLOOR PLAN


SCALE 1:350 M

FLOOR LEVEL: SECOND FLOOR


LEGEND DESCRIPTION

PNEUMATIC TUBE SYSTEM (PTS) STATION

DIVERTER

PNEUMATIC PIPE

PNEUMATIC PIPE INCOMING AND OUTGOING TO/FROM OTHER


FLOOR

RA 9266 SECTION 33
Drawings and specifications and other contract PREPARED BY: PROJECT CHECKED RECOMMENDING APPROVAL APPROVED SHEET NO.
documents duly signed, stamped or sealed, as
instruments of service, are the intellectual
Republic of the Philippines property and documents of the architect, whether
DEPARTMENT OF HEALTH the object for which they are made is executed or
not. It shall be unlawful for any person to
PROPOSED 2 LINES, 15 STATIONS PNEUMATIC TUBES SYSTEM
DR. JOSE FABELLA MEMORIAL HOSPITAL duplicate or make copies of said documents for
CAD by : ABB
use in the repetition of and for other projects or ALVIN B. BAUZON LOCATION
ROLLY R. ADORABLE LOURDES C. MENDOZA DR. ESMERALDO T. ILEM, M.D.
buildings, whether executed partly or in whole, DRAFTSMAN II, ENGINEERING & FACILITIES MGMT. HEAD, ENGINEERING FACILITIES AND MGMT. CHIEF ADMINISTRATIVE OFFICER MEDICAL CENTER CHIEF II Date :
without the written consent of the architect or DR. JOSE FABELLA MEMORIAL HOSPITAL, SAN LAZARO COMPOUND, STA. CRUZ, MANILA
author of said documents. DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL Checked by :
LINE TO 4F DIVERTER
LINE FROM 2F DIVERTER
LINE TO 4F DIVERTER
LINE FROM 2F DIVERTER

DN

UP
CENTRAL STERILIZING AND SUPPLY ROOM
MAIN
A= 130.55 sq.m.
RAMP DN
SERVICE STAIRS
DN DN
SERVICE STAIRS
A= 17.58 sq.m.
UP A= 16.89 sq.m.
UP UP
1 DELIVERY 1 DELIVERY 2 DELIVERY (PAY) LAMAZE ROOM
(SERVICE) (PAY) A= 34.51 sq.m. A= 34.51 sq.m. FAMILY
ELEVATOR ELEVATOR SUPPORT LEVEL II (CLEAN/INTERMEDIATE) LEVEL II (SEPTIC STABLE)
A=34.96 sq.m. SHAFT A= 34.66 sq.m. 150.00 sq.m. A= 156.91 sq.m.
SHAFT ROOM
A= 9.99 sq.m. A= 9.99 sq.m. A= 15.66 sq.m.
AFFLIATES LOCKERS
SCRUB AREA SUB-STERILIZING LABOR ROOM ANESTHESIA INDUCTION W/ TOILET CLEAN-UP ROOM INTERNAL MEDICINE
D&C NURSE STATION CLEAN-UP ROOM CLEAN-UP ROOM DEPARTMENT/
A=17.26 sq.m. ROOM PTS STATION ROOM (PAY) A= 13.72 sq.m. A= 17.11 sq.m.
5 DELIVERY A=16.79 sq.m. A= 24.60 sq.m. A= 17.07 sq.m. A= 17.08 sq.m. 1 CONFERENCE SURGERY DEPARTMENT
2 DELIVERY A= 16.89 sq.m. A= 15.61 sq.m.

CLEAN CORRIDOR 1
(SERVICE) (SERVICE) (SERVICE) ROOM A= 17.22 sq.m.
ANESTHESIA
CLEAN CORRIDOR 3

CLEAN CORRIDOR 2
DOCTORS

A= 77.41 sq.m.
A= 36.21 sq.m. A= 23.55 sq.m.

DIRTY CORRIDOR 1
DIRTY CORRIDOR 3

DIRTY CORRIDOR 2
A=34.81 sq.m. LABOR ROOM INDUCTION ROOM A= 34.87 sq.m. ANTE-ROOM ANTE-ROOM
(M) A= 9.06 sq.m.

A= 41.73 sq.m.
A= 372.51 sq.m. A= 7.78 sq.m.
A=77.75 sq.m.

A=78.08 sq.m.
ELEVATOR
A=34.77 sq.m.

A=47.52 sq.m.
8 DELIVERY 5 LABOR/ (SERVICE) 1 4 ANESTHESIA
2 LABOR/ A= 15.54 sq.m. A= 16.11 sq.m. SHAFT
(SERVICE) DELIVERY (PAY) (SERVICE) STAFF OFFICE A= 17.55 sq.m.
A=34.52 sq.m. DELIVERY A= 34.49 sq.m. A= 34.52 sq.m.
SUB-STERILIZING A= 34.37 sq.m. LAPAROSCOPY A= 34.77 sq.m. ANTE-ROOM
SCRUB AREA A= 34.26 sq.m. ELEVATOR
ROOM ROOM SHAFT
A= 9.80 sq.m.
A= 17.93 sq.m. 2 NEONATAL ICU
A=17.11 sq.m. A= 52.03 sq.m. A= 23.49 sq.m.
COMMON STAFF DOCTORS (SERVICE) PTS STATION

DIRTY CORRIDOR
(F) A=34.52 sq.m. SUB-STERILIZING ANTE-ROOM

A= 40.39 sq.m.
LOUNGE SCRUB AREA NURSE STATION
POST PARTUM A=39.59 sq.m. A= 26.23 sq.m. ROOM BREASTFEEDING A= 6.46 sq.m. ABG
3 DELIVERY 9 DELIVERY 4 LABOR/ A=17.25 sq.m. ANESTHESIA ISOLATION A= 28.12 sq.m. A= 4.68 sq.m.
6 DELIVERY 1 LABOR/ RECOVERY ROOM A= 16.97 sq.m. OPERATING ROOM ROOM
(SERVICE) (SERVICE) DELIVERY DEPARTMENT ROOM
(SERVICE) DELIVERY A= 71.80 sq.m. HEAD OFFICE A= 64.90 sq.m. TREATMENT X-RAY

VIEWING CORRIDOR
A=34.77 sq.m. A=34.37 sq.m. HEAD OFFICE LEVEL II (STEP DOWN)
A= 35.86 sq.m. A= 34.52 sq.m. A= 34.26 sq.m. NURSES A= 46.44 sq.m. STUDENTS ROOM A= 31.77 sq.m. A= 4.63 sq.m.
A=34.88 sq.m. A= 131.56 sq.m.

A= 151.19 sq.m.
(F) 5 QUARTERS
PEDIA 2 3 A= 8.26 sq.m.
A= 13.26 sq.m.
SISR A= 20.89 sq.m. (SERVICE)
SURGERY (PAY) (SERVICE) ANTE-ROOM

NICU STERILE CORRIDOR


UTILITY A=18.10 sq.m. A= 34.52 sq.m. NICU PUBLIC CORRIDOR
SCRUB AREA A= 2.85 sq.m. A= 34.52 sq.m. A= 34.46 sq.m. A=34.52 sq.m.
LINE TO 4F DIVERTER
A= 7.28 sq.m.
A=39.09 sq.m.
7 DELIVERY 10 DELIVERY 3 LABOR/ A=17.18 sq.m. DELIVERY ROOM

A= 185.42 sq.m.
4 DELIVERY OBSERVATION CL/DL PTS STATION DN
(SERVICE) (SERVICE)\ (SERVICE) DELIVERY ROOM A= 2.85 sq.m. NICU SUPERVISORS DOCTORS NURSES
NURSE NURSE STATION NURSES DOCTORS NURSES
A=34.77 sq.m. A= 35.86 sq.m. A= 34.52 sq.m. A= 34.37 sq.m. SUB-STERILIZING A= 43.01 sq.m. SUB-STERILIZING BILATERAL STAFF AREA OFFICE TOILET & LOUNGE
STATION (DELIVERY) (M) SISR (M & F) (M & F) CONFERENCE A= 27.63 sq.m. A= 8.56 sq.m. LOCKERS A= 18.63 sq.m.
ROOM ROOM TUBAL LIGATION 6 UP
A= 6.02 sq.m. A=22.41 sq.m. A= 20.92 sq.m. A=17.55 sq.m. A= 28.59 sq.m. A= 38.91 sq.m.
ROOM A= 18.61 sq.m.
A= 16.89 sq.m. A= 17.55 sq.m. A= 17.11 sq.m. (SERVICE) A= 33.11 sq.m.
A= 34.52 sq.m. LEVEL III (SEPTIC)
DELIVERY SUITES CORRIDOR I RECOVERY ROOM A= 218.79 sq.m.
PTS STATION NICU
A=378.22 sq.m. NURSE DEPARTMENT
STATION DOCTORS NURSES
RESUSCITATION COMMON STAFF HEAD OFFICE
UP UP A=25.15 sq.m. TRIAGE RESUSCITATION LOUNGE LOUNGE
SCRUB AREA ROOM LOUNGE NOOK A= 33.11 sq.m.
A= 5.85 sq.m. A= 17.06 sq.m. A= 17.16 sq.m.
DN DN A=17.25 sq.m. A= 9.69 sq.m. A= 30.26 sq.m. A= 13.20 sq.m.

STERILE CORRIDOR
STERILE CORRIDOR
A= 75.20 sq.m.
A=151.93 sq.m.

1 ANTE ROOM
(PAY) A= 8.41 sq.m.
LEVEL III (CLEAN)
DN UP
A=15.17 sq.m. A= 246.37 sq.m.
NURSE STATION EQUIPMENT
A=19.95 sq.m. A=5.46 sq.m. TRANSPORT

A=38.28 sq.m.
INCUBATOR

CORRIDOR
2
5 (PAY) ADMITTING A= 8.41 sq.m.
POST OPERATIVE SERVICE ICU AREA (PAY) A=15.21 sq.m. AREA
RECOVERY ROOM A= 202.69 A=15.21 sq.m. UTILITY WASH
A= 57.74 sq.m.
A= 54.99 sq.m. ROOM
A= 8.41 sq.m.
UTILITY 4 3
A= 9.56 sq.m. (PAY) (PAY) PANTRY
A=15.80 sq.m. A=15.73 sq.m. A= 13.73 sq.m.

THIRD FLOOR PLAN


SCALE 1:350 M

FLOOR LEVEL: THIRD FLOOR


LEGEND DESCRIPTION

PNEUMATIC TUBE SYSTEM (PTS) STATION

DIVERTER

PNEUMATIC PIPE

PNEUMATIC PIPE INCOMING AND OUTGOING TO/FROM OTHER


FLOOR

RA 9266 SECTION 33
Drawings and specifications and other contract PREPARED BY: PROJECT CHECKED RECOMMENDING APPROVAL APPROVED SHEET NO.
documents duly signed, stamped or sealed, as
instruments of service, are the intellectual
Republic of the Philippines property and documents of the architect, whether
DEPARTMENT OF HEALTH the object for which they are made is executed or
not. It shall be unlawful for any person to
PROPOSED 2 LINES, 15 STATIONS PNEUMATIC TUBES SYSTEM
DR. JOSE FABELLA MEMORIAL HOSPITAL duplicate or make copies of said documents for
use in the repetition of and for other projects or ALVIN B. BAUZON ROLLY R. ADORABLE, REE LOURDES C. MENDOZA ESMERALDO T. ILEM, M.D. CAD by : ABB
buildings, whether executed partly or in whole, LOCATION
DRAFTSMAN II, ENGINEERING & FACILITIES MGMT. HEAD, ENGINEERING FACILITIES AND MGMT. CHIEF ADMINISTRATIVE OFFICER MEDICAL CENTER CHIEF II Date :
without the written consent of the architect or DR. JOSE FABELLA MEMORIAL HOSPITAL, SAN LAZARO COMPOUND, STA. CRUZ, MANILA
author of said documents. DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL Checked by :
FIRE

EQUIPMENT ROOM
RESERVE PNEUMATIC TUBE LINE 1
FENCE & FLOOR SLAB FOR
THE VACUUM INSULATED
EVAPORATOR (VIE) LIQUID
BLOWER (1)
OXYGEN STORAGE TANK
PNEUMATIC TUBE LINE 1
RAINWATER/ BLOWER (2)
NONPOTABLE PANTRY TOILET LOCKER
INVESTIGATION ROOM
WATER A= 36.34 sq.m. MEDICAL GAS STORAGE STOCK
CISTERN TANK STOCK SECURITY OFFICE LOCKER A= 102.16 sq.m. ROOM 32,000 LITERS
OFFICE AREA ROOM A= 23.59 sq.m. DIESEL BULK
A= 71.00 sq.m. A= 26.40 sq.m.
WASTE MANAGEMENT UNIT STORAGE
ORGANIC OUTSOURCE A= 74.47 sq.m. A= 40.41 sq.m.
SECURITY SECURITY MAIN RAMP
MORGUE OFFICE OFFICE
A= 12.06 sq.m. A= 12.32 sq.m.
POTABLE CISTERN
TANK
OFFICE OF THE HEAD
A= 22.95 sq.m.
LINEN STORAGE
A= 41.35 sq.m. D R I V E W A Y
GENERAL SERVICE DEPARTMENT

DRIVERS TOOL ROOM


TOILET LOCKER
A= 15.15 sq.m.
LOUNGE A= 13.18 sq.m.
INSPECTION UNIT A= 15.88 sq.m.
A= 76.41 sq.m.
RECORDS
CARPENTRY MOTORPOOL STORAGE
FOLDING & SORTING & HOUSEKEEPING A= 31.05 sq.m.
WORKSHOP PARKING
IRONING AREA COUNTING & JANITORIAL A= 36.37 sq.m. A= 142.50 sq.m.
A= 88.36 sq.m. AREA SERVICE
A= 55.17 sq.m. A= 80.63 sq.m. MALE
TOILET
FEMALE
RAC TOILET
SUPPLY WORKSHOP A= 8.36 sq.m.
STORAGE WASHING/MECHANICAL OFFICE OF THE A= 45.75 sq.m.
ROOM DRYING AREA MATERIALS MANAGEMENT OFFICE HEAD
A= 17.22 sq.m. A= 37.28 sq.m. A= 35.47 sq.m.
PANTRY PANTRY

.
STAFF AREA PLUMBING ENGINEERING & FACILITIES MGMT. OFFICE A= 14.60

STORAGE
A= 101.30 sq.m. MALE
TOILET
POWERHOUSE WORKSHOP sq.m.

A= 97.15 sq.m. A= 27.45 sq.m.

T
P A R K I N G A R E A ROOM
A= 97.40 sq.m.
FEMALE BIOMEDICAL
OFFICE OF THE
HEAD
A= 41.57 sq.m.
A= 2571.43 sq.m. PANTRY TOILET WORKSHOP

S
A= 27.45 sq.m. STAFF AREA
A= 60.66 sq.m.
TOILET
MOLECULAR
LABORATORY MECHANICAL
A= 181.39 sq.m. WORKSHOP
HEALTH EMERGENCY HEALTH HEALTH

N
A= 45.75 sq.m.
STAFF STORAGE EMERGENCY INFORMATION
ROOM STAFF OFFICE MANAGEMENT STORAGE
ROOM

A
A= 147.62 sq.m. A= 53.92 sq.m. DEPARTMENT
A= 88.72 sq.m.
A= 73.66 sq.m. ELECTRICAL CONFERENCE
WORKSHOP ROOM
A= 31.57 sq.m.

M
A= 50.95 sq.m.

GATE 3
FIRE EXIT FIRE EXIT

U
STOCK ROOM
DN

Y
PUBLIC TOILET

STP PUMP ROOM


ROOM A ROOM B ROOM C
A= 19.24 sq.m. A= 19.00 sq.m. A= 40.85 sq.m.

A
CONCESSIONAIRES CONCESSIONAIRES
FEMALE MALE
AREA TOILET TOILET
AREA

T
A= 178.68 sq.m. A= 91.37 sq.m.
EXISTING
BALETE TREE

CREMATORIUM

FLAGPOLE
GUARD
HOUSE

UP

D R I V E W A Y

MAIN ENTRY
GATE 2 CONNECTING
TO DOH

DOH ENTRY
D O H A C C E S S R O A D

GROUND FLOOR PLAN


SCALE 1:350 M

FLOOR LEVEL: GROUND FLOOR


LEGEND DESCRIPTION

DIVERTER

PNEUMATIC PIPE

PNEUMATIC PIPE INCOMING AND OUTGOING TO/FROM OTHER


FLOOR

BLOWER

RA 9266 SECTION 33
Drawings and specifications and other contract PREPARED BY: PROJECT CHECKED RECOMMENDING APPROVAL APPROVED SHEET NO.
documents duly signed, stamped or sealed, as
instruments of service, are the intellectual
Republic of the Philippines property and documents of the architect, whether
DEPARTMENT OF HEALTH the object for which they are made is executed or
not. It shall be unlawful for any person to
PROPOSED 2 LINES, 15 STATIONS PNEUMATIC TUBES SYSTEM
DR. JOSE FABELLA MEMORIAL HOSPITAL duplicate or make copies of said documents for
use in the repetition of and for other projects or ALVIN B. BAUZON ROLLY R. ADORABLE, REE LOURDES C. MENDOZA ESMERALDO T. ILEM, M.D. CAD by : ABB
buildings, whether executed partly or in whole, LOCATION
DRAFTSMAN II, ENGINEERING & FACILITIES MGMT. HEAD, ENGINEERING FACILITIES AND MGMT. CHIEF ADMINISTRATIVE OFFICER MEDICAL CENTER CHIEF II Date :
without the written consent of the architect or DR. JOSE FABELLA MEMORIAL HOSPITAL, SAN LAZARO COMPOUND, STA. CRUZ, MANILA
author of said documents. DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL Checked by :
NURSE STATION G

NURSE STATION E NURSE STATION PEDIA NURSE STATION PRIVATE

NURSE STATION E ADULT ICU PEDIA ICU

LABOR ROOM DELIVERY ROOM RECOVERY ROOM NEONATAL ICU

LABORATORY BILLING & CLAIMS PHARMACY EMERGENCY ROOM

PTS LINE 1

PTS LINE 2

BLOWER UNIT (1) BLOWER UNIT (2)

DR. JOSE FABELLA MEMORIAL HOSPITAL


PROPOSED 2 LINES, 15 STATIONS PNEUMATIC TUBE SYSTEM

RA 9266 SECTION 33
Drawings and specifications and other contract PREPARED BY: PROJECT CHECKED RECOMMENDING APPROVAL APPROVED SHEET NO.
documents duly signed, stamped or sealed, as
instruments of service, are the intellectual
Republic of the Philippines property and documents of the architect, whether
DEPARTMENT OF HEALTH the object for which they are made is executed or
not. It shall be unlawful for any person to
PROPOSED 2 LINES, 15 STATIONS PNEUMATIC TUBES SYSTEM
DR. JOSE FABELLA MEMORIAL HOSPITAL duplicate or make copies of said documents for
CAD by : ABB
use in the repetition of and for other projects or ALVIN B. BAUZON LOCATION
ROLLY R. ADORABLE LOURDES C. MENDOZA DR. ESMERALDO T. ILEM, M.D.
buildings, whether executed partly or in whole, DRAFTSMAN II, ENGINEERING & FACILITIES MGMT. HEAD, ENGINEERING FACILITIES AND MGMT. CHIEF ADMINISTRATIVE OFFICER MEDICAL CENTER CHIEF II Date :
without the written consent of the architect or DR. JOSE FABELLA MEMORIAL HOSPITAL, SAN LAZARO COMPOUND, STA. CRUZ, MANILA
author of said documents. DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL DR. JOSE FABELLA MEMORIAL HOSPITAL Checked by :

You might also like