MV X-Press Altair

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 24

TRIM CORRECTION

0.00 0.60 1.00


SOUNDING
510.000 88.8 88.680 88.6
510.000 #DIV/0! #DIV/0! #DIV/0!
510.000 88.8 88.680 88.6

BUNKERS MIXTURE
DENSITIES TONS
0.9658 37.03 35.763574
0.9887 20.266 20.0369942
57.296 55.8005682
NEW DENCITY : 0.973899891790003

TRANSFER DENSITY OF 20 C TO 15 C.

30.00 PRESENT TEMPERATURE 59 F = 15,00


15.00 REQUIRED TEMPERATURE60 F = 15,55556 C
15.00 DIFFERENCE

0.00069 Χ 15.00 0.01035


0.99575 DENSITY ON 20 C
1.00610 DENSITY ON 15 C
DECLARATION FOR INTERNATIONAL TRANSPORTATION

This declaration is pursuant to Article (45) clause (7) of the Federal Decree – Law No. (8) of 2017 on Valued
Added Tax and Article (33) of the Cabinet Decision No. (52) of 2017 on the Executive Regulations of the
Federal Decree-Law No. (8) of 2017 on Valued Added Tax, which allows supply of goods and services to
ships as part of international transportation services for passengers and goods to be eligible for Zero rating
of VAT.

Arrival date : 25.12.2023


Date of Supply : 26.12.2023
Port of Supply : Fujairah
Name of ship : M.V. "X-PRESS ALTAIR"
IMO number : 9124677

Next Port/Next destination: : HAMAD

I hereby declare that the ship transportation service where the goods / services were supplied is in one of
the following categories (tick as appropriate):

a) Transporting passengers or goods from a place in the


United Arab Emirates to a place outside the United Arab
Emirates.

b) Transporting passengers or goods from a place outside


the United Arab Emirates to a place in the United Arab
Emirates.

c) Sailing within the United Arab Emirates Territorial waters.

Name of Master :

Signature :

Ship Stamp :

*This declaration must be returned to the supplier for us to invoice the supply at zero or at standard rate as applicable under the
United Arab Emirates Tax Laws.
VLS FO
LS FO
ULS FO
HS HFO
HFO
MGO
LS MGO
HS MGO
MDO
LS MDO
DO
Vessel : M.V. "X-PRESS ALTAIR" IMO Number : 9124677 LS GO
Port : Fujairah Report No. : 27363/23/VM Sludge
Location : Anchorage Date : 15.11.2023
Client : M/s. X-PRESS FEEDER

Product HS HFO LS MGO


Grade (s) RMG 380 DMA
Name of Bunker Barge M.T. "ABC SUN" M.T. "ABC SUN"
Bunker Delivery Note (BDN) Quantity in MT 519.342 MT 68.8 MT RMK 700
SURVEY TIME LOG 296.925 MT
Events Date Time Date Time
Surveyor left base (Office) 25.12.2023 1030 25.12.2023 1030
Surveyor arrived/reported at Anchorage 25.12.2023 1115 25.12.2023 1115
M.V. "X-PRESS ALTAIR" anchored/FWE at Anchorage 25.12.2023 1842 25.12.2023 1842
Surveyor on board the M.V. "X-PRESS ALTAIR" 26.12.2023 0330 26.12.2023 0330
Commenced initial gauging on board the M.V. "X-PRESS ALTAIR" 26.12.2023 0345 26.12.2023 0345
Completed gauging / Calculations 26.12.2023 0430 26.12.2023 0430
Bunker vessel arrived alongside / double banked 26.12.2023 0224 26.12.2023 0224
Survyor on board the bunker barge 26.12.2023 0230 26.12.2023 0230
Commenmced gauging on board the bunker barge 26.12.2023 0230 26.12.2023 0230
completed gauging / Calculations 26.12.2023 0248 26.12.2023 0248
Hose Connected 26.12.2023 0336 26.12.2023 0336
Commenced bunkering 26.12.2023 0536 26.12.2023 0536
Completed bunkering 26.12.2023 0712 26.12.2023 0712
Final gauging on board the Bunker Barge 26.12.2023 0945 26.12.2023 0945
Final gauging on board - M.V. "X-PRESS ALTAIR" 26.12.2023 0745 26.12.2023 0745
Hose disconnected 26.12.2023 26.12.2023
Documentation completed 26.12.2023 1200 26.12.2023 1200
Bunker barge cast off 26.12.2023 N/A 26.12.2023 N/A
Surveyor disembarked 26.12.2023 N/A 26.12.2023 N/A
Surveyor returned base (Office) 26.12.2023 N/A 26.12.2023 N/A

Remarks:

Mr. Vinayan.M Mr. Mesias Collin Moran Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No.1 Dt. Of Issue Rev. No. Prepared by Approved by
O-013 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the
benefit of whom it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
BUNKER SOUNDING REPORT FOR NOMINATED TANKS - RECEIVING VESSEL
Vessel : M.V. "X-PRESS ALTAIR" Report No : 27363/23/VM
Grade : HS HFO Place : Fujairah
INITIAL READINGS
FWD Draft : 10.20 M Date : 26.12.2023
AFT Draft : 10.80 M Time : 0345 Hrs
Trim : 0.60 M Stern List : 0.00 °P/S Location : Anchorage

Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1P #N/A #N/A 1183.0 1183.0 #N/A #N/A #N/A #N/A #N/A #N/A
1S #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2P #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
5S #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
6S #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Total #N/A #N/A #N/A


FINAL READINGS
FWD Draft : 8.13 M Date : 26.12.2023
AFT Draft : 9.13 M Time : 0745 Hrs
Trim : 1.00 M Stern List : 0.00 °P/S Location : Anchorage

Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1P #N/A #N/A 339.0 339.0 74.650 #N/A 30.0 #N/A #N/A #N/A
1S #N/A #N/A 315.0 315.0 59.460 #N/A 30.0 #N/A #N/A #N/A
2P #N/A #N/A 491.4 491.4 101.880 #N/A 30.0 #N/A #N/A #N/A
5S #N/A #N/A 401.0 401.0 35.300 #N/A 30.0 #N/A #N/A #N/A
6S #N/A #N/A 399.0 399.0 57.450 #N/A 30.0 #N/A #N/A #N/A

Total 328.740 #N/A #N/A

Notes:
1. The above volumes were corrected to trim/list as per the calibration table made avilable to us.
2. Weighted average density used for final calculation. Supplier Density @ 15 C : 0.9530
3. The vessel noted to be rolling slightly during gauging of bunker tanks

Quantity on board after bunkdering in the above nominated bunker tank(s) : #N/A M.Ton
Quantity on board before bunkering in the above nominated bunker tank(s) : #N/A M.Ton
Therefore, quantity received in the above nominated tank(s) : #N/A M.Ton

Mr. Vinayan.M Mr Vikas Yadav


Surveyor Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom it may
concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
BUNKER SOUNDING REPORT FOR NOMINATED TANKS - RECEIVING VESSEL
Vessel : M.V. "X-PRESS ALTAIR" Report No : 27363/23/VM
Grade : LS MGO Place : Fujairah
INITIAL READINGS
FWD Draft : 10.20 M Date : 26.12.2023
AFT Draft : 10.80 M Time : 0345 Hrs
Trim : 0.60 M Stern List : 0.00 °P/S Location : Fujairah

Tank Ref. Height Ullage (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1 MGO STR TK 677.0 677.0 0.0 0.0 0.600 0.8542 28.0 0.9892 0.594 0.507
3 MGO STR TK 484.0 484.0 93.0 93.0 17.750 0.8276 28.0 0.9888 17.551 14.506

Total 18.350 18.145 15.013


FINAL READINGS
FWD Draft : 8.13 M Date : 26.12.2023
AFT Draft : 9.13 M Time : 0745 Hrs
Trim : 1.00 M Stern List : 0.00 °P/S Location : Fujairah

Tank Ref. Height Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1 MGO STR TK 677.0 677.0 0.0 0.0 94.200 0.8580 28.0 0.9893 93.192 79.856
3 MGO STR TK 484.0 484.0 93.0 93.0 36.000 0.8580 28.0 0.9893 35.615 30.518

Total 130.200 128.807 110.374

Notes:
1. The above volumes were corrected to trim/list as per the calibration table made avilable to us
2. Weighted average density used for final calculation. Supplier Density @ 15 C : 0.8580
3. The vessel was noted to be rolling slightly during gauging of bunker tanks

Quantity on board after bunkdering in the above nominated bunker tank(s) : 110.374 M.Ton
Quantity on board before bunkering in the above nominated bunker tank(s) : 15.013 M.Ton
Therefore, quantity received in the above nominated tank(s) : 95.361 M.Ton

Mr. Vinayan.M Mr Vikas Yadav


Surveyor Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom it
may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
BUNKER SOUNDING REPORT - FINAL (ROB)
Vessel : M.V. "X-PRESS ALTAIR" Report No : 27363/23/VM
FWD Draft : 8.13 M Date / Time : 16.12.23 at 1000 hrs
AFT Draft : 9.13 M Location : Anchorage
Trim : 1.00 M Stern List : 0.00 °P/S Port : Fujairah
Grade : VLS FO
Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1P 499.7 499.7 339.0 339.0 74.650 #N/A 30.0 #N/A #N/A #N/A
1S 499.7 499.7 315.0 315.0 59.460 #N/A 30.0 #N/A #N/A #N/A
2P 499.7 499.7 491.4 491.4 101.880 #N/A 30.0 #N/A #N/A #N/A
2S 499.7 499.7 241.0 241.0 41.830 0.9340 30.0 0.9889 41.366 38.590
5P 458.5 458.5 6.0 6.0 0.000 0.9340 30.0 0.9889 0.000 0.000
5S 458.5 458.5 401.0 401.0 35.300 #N/A 30.0 #N/A #N/A #N/A
6P 472.4 472.4 0.0 0.0 0.000 0.9340 30.0 0.9889 0.000 0.000
6S 472.4 472.4 399.0 399.0 57.450 #N/A 30.0 #N/A #N/A #N/A
SETT 247.8 247.8 GAUGE GAUGE 1.800 0.9340 35.0 0.9852 1.773 1.654
SERV 247.8 247.8 GAUGE GAUGE 1.900 0.9340 40.0 0.9815 1.865 1.740

Total 374.270 #N/A #N/A


Grade : LS MGO
Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1 MGO STR TK 677.0 677.0 0.0 0.0 94.200 0.8580 28.0 0.9893 93.192 79.856
2 MGO STR TK 677.0 677.0 510.0 510.0 89.680 0.8542 35.0 0.9834 88.191 75.236
3 MGO STR TK 484.0 484.0 93.0 93.0 36.000 0.8580 28.0 0.9893 35.615 30.518
4 MGO STR TK 484.0 484.0 249.0 249.0 46.672 0.8542 35.0 0.9834 45.897 39.155
1 MGO SERV 502.0 502.0 324.0 324.0 31.650 0.8542 35.0 0.9834 31.125 26.553
2 MGO SERV 502.0 502.0 238.0 238.0 22.676 0.8542 35.0 0.9834 22.300 19.024

Total 320.878 316.320 270.342


Grade :
Tank Ref. Height (cm) Sounding Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons

Total
ROB as on 16.12.23 at 1000 hrs
VLS FO #N/A MT
LS MGO 270.342 MT

Notes:
1. The above volumes were corrected to trim/list as per the calibration table made avilable to us.
2. Density provided by the Chief Engineer. Present VLS FO bunker has received in tanks # 1S& 2s and LS MGO in MDO tank
3. The vessel noted to be rolling slightly during gauging of bunker tanks
4. VLS FO consumption from 15.12.2023 at 1930 Hrs to 16.12.23 at 1000 hrs :
Mr. Vinayan.M Mr Vikas Yadav
Surveyor Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom it may
concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
Per day Cons 6.000
10 2.500
Cons 0.000
Recevd #N/A

Cons 0.000
Recevd 94.980

Cons 0.000
Recevd 0.000
BUNKER SOUNDING REPORT - INITIAL (ROB)
Vessel : M.V. "X-PRESS ALTAIR" Report No :
FWD Draft : 10.20 M Date / Time :
AFT Draft : 10.80 M Location :
Trim : 0.60 M Stern List : 0.00 °P/S Port :
Grade : VLS FO
Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C
1 HFO STORAGE 1853.0 1853.0 3.0 3.0 2.900 0.9729 29.0 0.9902 2.872
2 HFO STORAGE 1854.0 1854.0 317.0 317.0 115.000 0.9556 30.0 0.9893 113.770
3 HFO STORAGE 1846.0 1846.0 4.0 4.0 2.500 0.9556 30.0 0.9893 2.473
4 HFO STORAGE 1845.0 1845.0 925.0 925.0 285.500 0.9729 32.0 0.9881 282.103
1 HFO SERVICE GAUGE GAUGE GUAGE GAUGE 29.000 0.9638 86.0 0.9492 27.527
2 HFO SERVICE GAUGE GAUGE GUAGE GAUGE 2.500 0.9666 76.0 0.9566 2.392
1 HFO SETT GAUGE GAUGE GUAGE GAUGE 29.500 0.9638 69.0 0.9615 28.364
2 HFO SETT GAUGE GAUGE GUAGE GAUGE 1.500 0.9666 64.0 0.9652 1.448
1 HFO O/F P 0.0 0.0 0.0 0.0 0.000 0.9638 32.0 0.9880 0.000
1 HFO 0/F S 0.0 0.0 0.0 0.0 0.000 0.9638 32.0 0.9880 0.000
FO DRAIN TK GAUGE GAUGE GUAGE GAUGE 3.200 0.9638 32.0 0.9880 3.162
FO O/F TK GAUGE GAUGE GUAGE GAUGE 0.000 0.9666 32.0 0.9880 0.000

Total 471.600 464.111


Grade : LS MGO
Tank Ref. Height (cm) Sounding (cm) Volume Density Temp V.C.F G.S.V
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C
1 MGO STR TK 677.0 677.0 0.0 0.0 0.600 0.8542 35.0 0.9834 0.590
2 MGO STR TK 677.0 677.0 510.0 510.0 89.680 0.8542 35.0 0.9834 88.191
3 MGO STR TK 484.0 484.0 93.0 93.0 17.750 0.8542 35.0 0.9834 17.455
4 MGO STR TK 484.0 484.0 249.0 249.0 46.672 0.8542 35.0 0.9834 45.897
1 MGO SERV 502.0 502.0 324.0 324.0 31.650 0.8542 35.0 0.9834 31.125
2 MGO SERV 502.0 502.0 238.0 238.0 22.676 0.8542 35.0 0.9834 22.300

Total 209.028 205.558


Grade :
Tank Ref. Height (cm) Sounding Volume Density Temp V.C.F G.S.V
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C

Total
ROB Qty as on 15.12.2023 at Log book Qty as on 15.12.2023 at 1424 h
VLS FO 448.449 MT VLS FO 283.400 MT
LS MGO 175.362 MT LS MGO 175.300 MT

Notes:
1. The above volumes were corrected to trim/list as per the calibration table made avilable to us.
2. Density provided by the Chief Engineer.
3. The vessel was noted to be rolling slightly during gauging of bunker tanks

Mr. Vinayan.M Mr Vi
Surveyor Chief
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom it may concern.
responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
27363/23/VM
26.12.2023 at 0345 Hrs
Anchorage
Fujairah

G.S.V Metric
m³ @ 15°C Tons
2.872 2.791
113.770 108.593
2.473 2.360
282.103 274.148
27.527 26.500
2.392 2.309
28.364 27.306
1.448 1.398
0.000 0.000
0.000 0.000
3.162 3.044
0.000 0.000

464.111 448.449 165.049


58.24%
G.S.V Metric
m³ @ 15°C Tons
0.590 0.503
88.191 75.236
17.455 14.891
45.897 39.155
31.125 26.553
22.300 19.024

205.558 175.362 0.062


0.04%
G.S.V Metric
m³ @ 15°C Tons

0.000

0.00%
s on 15.12.2023 at 1424 hrs
MT
MT

Mr Vikas Yadav
Chief Engineer
Approved by
ZSI
the benefit of whom it may concern. Our
BUNKER SOUNDING REPORT - SUPPLYING VESSEL
Bunker Vessel : M.T. "ABC SUN" Report No : 27363/23/VM
Receiving Vessel : M.V. "X-PRESS ALTAIR" Grade : HS HFO RMG 380
INITIAL READINGS
FWD Draft : 7.00 M Date/time : 26.12.2023 at 0230 Hrs
AFT Draft : 7.00 M Place : Fujairah
Trim : 0.00 M List : 0.00 °P/S Location : Anchorage

Tank Ref. Height Ullage (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1P 859.5 859.5 663.0 663.0 116.956 0.9530 31.0 0.9885 115.611 110.050
1S 860.0 860.0 663.0 663.0 117.869 0.9530 31.0 0.9885 116.514 110.910
2P 893.9 893.9 708.0 708.0 127.818
2S 893.5 893.5 707.0 707.0 126.111
4P 895.8 895.8 772.0 772.0 103.964
4S 896.2 896.2 773.0 773.0 103.415
5P 894.3 894.3 879.0 879.0 8.496
5S 895.5 895.5 878.0 878.0 9.913
6P 894.4 894.4 676.0 676.0 165.303 0.9530 31.0 0.9885 163.402 155.542
6S 894.3 894.3 673.0 673.0 170.163 0.9530 31.0 0.9885 168.206 160.115
Total 563.733 536.617
FINAL READINGS
FWD Draft : 7.00 M Date/time : 26.12.2023 at 0945 Hrs
AFT Draft : 7.00 M Place : Fujairah
Trim : 0.00 M List : 0.00 °P/S Location : Anchorage

Tank Ref. Height Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
1P 859.5 859.5 663.0 663.0 22.956 31.0 #DIV/0! #DIV/0! #DIV/0!
1S 860.0 860.0 663.0 663.0 0.000 31.0 #DIV/0! #DIV/0! #DIV/0!
2P 893.9 893.9 708.0 708.0 127.818
2S 893.5 893.5 707.0 707.0 126.111
4P 895.8 895.8 772.0 772.0 103.964
4S 896.2 896.2 773.0 773.0 103.415
5P 894.3 894.3 879.0 879.0 8.496
5S 895.5 895.5 878.0 878.0 9.913
6P 1760.0 1760.0 334.0 271.0 127.336 0.9530 31.0 0.9885 125.872 119.818
6S 1740.0 1740.0 335.0 272.0 104.440 0.9530 31.0 0.9885 103.239 98.273
Total #DIV/0! #DIV/0!

Notes:

1. BDN Density used for calculation as stated by the Chief Officer


2. The barge was noted to be rolling slightly during gauging of cargo tanks by barge's crew
3. Tanks # Slop P/S were reported as empty and tanks 1P/S were containing LS MGO

Quantity on board before discharge in the above nominated bunker tank(s) : 536.617 M.Ton
Quantity on board after discharge in the above nominated bunker tank(s) : #DIV/0! M.Ton
Therefore, quantity discharged by the bunker barge M.T. "ABC SUN" : #DIV/0! M.Ton
(Quantity as per BDN : 296.925 M.Ton)

Mr. Vinayan.M Mr. Mesias Collin Moran Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom
it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
Ullage (cm)
Sounding (cm)
BUNKER SOUNDING REPORT - SUPPLYING VESSEL
Bunker Vessel : M.T. "ABC SUN" Report No : 27363/23/VM
Receiving Vessel : M.V. "X-PRESS ALTAIR" Grade : LS MGO DMA
INITIAL READINGS
FWD Draft : 7.00 M Date/time : 26.12.2023 at 0230 Hrs
AFT Draft : 7.00 M Place : Fujairah
Trim : 0.00 M List : 0.00 °P/S Location : Anchorage

Tank Ref. Height Sounding (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
3P 894.7 894.7 143.0 143.0 571.811 0.8580 28.0 0.9893 565.693 484.742
3S 893.9 893.9 143.0 143.0 577.266 0.8580 28.0 0.9893 571.089 489.366

Total 1149.077 1,136.782 974.108


FINAL READINGS
FWD Draft : 6.00 M Date/time : 26.12.2023 at 0945 Hrs
AFT Draft : 6.00 M Place : Fujairah
Trim : 0.00 M List : 0.00 °P/S Location : Anchorage

Tank Ref. Height Ullage (cm) Volume Density Temp V.C.F G.S.V Metric
No(s) Obsd Table Obsd Corcted (M3) @15°C Deg(C ) T(54B ) m³ @ 15°C Tons
3P 894.7 894.7 220.0 220.0 515.950 0.8580 28.0 0.9893 510.429 437.387
3S 893.9 893.9 269.0 269.0 520.473 0.8580 28.0 0.9893 514.904 441.221
.

Total 1036.423 1,025.333 878.608

Notes:
1. Surveyor not allowed to board the barge and hence the above measurements were provided by Cargo Officer of barge
2. BDN Density used for calculation as stated by the Chief Officer
3. The barge was noted to be rolling slightly during gauging of cargo tanks by barge's crew
4. Tanks # 2P/S, 4P/S & Slop P/S were reported as empty and tanks 1P/S & 3P/S were containing VLS FO

Quantity on board before discharge in the above nominated bunker tank(s) : 974.108 M.Ton
Quantity on board after discharge in the above nominated bunker tank(s) : 878.608 M.Ton
Therefore, quantity discharged by the bunker barge M.T. "ABC SUN" : 95.500 M.Ton
(Quantity as per BDN : 95.500 M.Ton)

Mr. Vinayan.M Mr. Ray Lim Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by
O-02 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the benefit of whom it
may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
Vessel : M.V. "X-PRESS ALTAIR" Date : 15.11.2023
Port : Fujairah Location : Anchorage
Report No. : 27363/23/VM

QUANTITY COMPARISON

Product HS HFO

Quantity received on board the M.V. "X-PRESS ALTAIR" #N/A M.Tons

Quantity discharged by the bunker vessel M.T. "ABC SUN" (as per BDN) 296.925 M.Tons

Difference #N/A M.Tons

Product LS MGO

Quantity received on board the M.V. "X-PRESS ALTAIR" 95.361 M.Tons

Quantity discharged by the bunker vessel M.T. "ABC SUN" (as per BDN) 95.500 M.Tons

Difference -0.139 M.Tons

Mr. Vinayan.M Mr Vikas Yadav


Surveyor Chief Engineer

Ref. No.1 Dt. Of Issue Rev. No. Prepared by Approved by


O-14 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where
required and for the benefit of whom it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our
surveyors.
#N/A

0.15
SAMPLE REPORT
Vessel : M.V. "X-PRESS ALTAIR" Date : 15.11.2023
Place : Fujairah Report No. : 27363/23/VM
Physical Supplier : AL ARABIA BUNKERING Location : Anchorage
Testing Lab : VPS

Grade HS HFO (RMG 380)


Receiving vessel / Bunker Barge M.V. "X-PRESS ALTAIR" M.T. "ABC SUN"
Nominated Tanks 1P/S, 2P,5S,6S 1p/s & 6P/S
Sampling Point Vessel Manifold Vessel Manifold
Sampling device used Portable Line Drip Sampler Portable Line Drip Sampler
Sampling Point Seal No. N/A N/A
Sampling Method Continuos Drip Continuos Drip
Joint sampling Yes Yes
Sampling witnessed by Surveyor Yes Yes
Vessel Seal C/seal by barge Supplier seal Counter seal
Vessel Retention 1 N/A N/A N/A N/A
Vessel Retention - Marpol N/A 007061 007063 N/A
Barge Retention 1 N/A 007062 007064 N/A
Barge Retention 2 N/A N/A 007065 N/A
Laboratory N/A N/A N/A

Remarks
1) Vessel has taken 2 (two) samples from barge manifold, witnessed by surveyor
2) Barge has taken 3 (three) sample from bargl's manifold jointly with vessel, witnessed by surveyor
3) Barge has counter sealed all vessel's samples except vessel retention 1 and all sample seal numbers were
entered on the BDN except vessel retention 2.

Mr. Vinayan.M Mr. Mesias Collin Moran Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared By Approved by
O23 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for
the benefit of whom it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
SAMPLE REPORT
Vessel : M.V. "X-PRESS ALTAIR" Date : 15.11.2023
Place : Fujairah Report No. : 27363/23/VM
Physical Supplier : AL ARABIA BUNKERING Location : Anchorage
Testing Lab : VPS

Grade LS MGO
Receiving vesse / Bunker Barge M.V. "X-PRESS ALTAIR" M.T. "ABC SUN"
Nominated Tanks MGO 1,MGO3 3P/S
Sampling Point Barge Manifold Barge Manifold
Sampling device used Drain Valve Drain Valve
Sampling Point Seal No. --- ---
Sampling Method Continuos Drip Continuos Drip
Was Joint Sampling Yes Yes
Sampling witnessed by Surveyor Yes Yes
Vessel Seal C/seal by Barge Supplier Seal Counter Seal
Vessel Retention 1 18731 N/A N/A N/A
Vessel Retention - Marpol 18730 007066 007068 N/A
Barge Retention 1 18731 007067 007069 N/A
Barge Retention 2 N/A N/A 007070 N/A
Laboratory 18733 N/A N/A

Remarks
1) Vessel has taken 2 (four) samples from Barge manifold, witnessed by surveyor
2) Barge has taken 3 (one) sample from Barg's manifold jointly with vessel, witnessed by surveyor
3) Barge has counter sealed all vessel's samples
entered on the BDN except vessel retention 2.

Mr. Vinayan.M Mr. Ray Lim Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared By Approved by
O23 10/10/2012 1 SS ZSI
This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for
the benefit of whom it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.
STATEMENT OF FACTS FOR QUANTITY

Vessel : M.V. "X-PRESS ALTAIR" Date : 15.11.2023


Port : Fujairah Location : Anchorage
Barge : M.T. "ABC SUN" Report No. : 27363/23/VM

Grade HS HFO RMG 380 Grade LS MGO DMA


A) Stemmed Quantity 300.000 MT A) Stemmed Quantity 100.000 MT ###
B) BDN Fig. 296.925 MT B) BDN Fig. 68.800 MT ###
C) Vessel Received Fig. #N/A MT C) Vessel Received Fig. 68.719 MT
Diff. Stemmed & BDN (B-A) -3.075 MT Diff. Stemmed & BDN (B-A) -31.200 MT
Diff. Vessel & Stemmed (C-A) #N/A MT Diff. Vessel & Stemmed (C-A) -31.281 MT
Diff. Vessel & BDN (C-B) #N/A MT Difference (C-B) -0.081 MT
Barge IMO No.: 9427263 Barge IMO No.: 9427263

( ) Sufficient bunker to next port ( ) Sufficient bunker to next port


( ) Do not require second pumping ( ) Do not require second pumping
( ) Stemmed qty. amended prior to supply ( ) Stemmed qty. amended prior to supply
( ) Others (Please explain) ( ) Others (Please explain)

On completion of HFO/MGO bunker delivery, closing soundings were taken on the vessel and barge and witnessed by
the Surveyor, vessel representative and barge's cargo officer. No obvious form or bubbles were found in the vessel's
nominated tanks. Quantity was calculated and verified by the C/Eng., Cargo officer & surveyor and Chief Engineer agrees
to sign the BDN without any remarks. Chief Chief engineer is satisfied with the surveyor conduct and performance.

Remarks

Mr. Vinayan.M Mr. Mesias Collin Moran Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer

Ref. No. Date of Issue Rev, No. Prepared by Aproved by


STATEMENT OF FACTS - SHEET
Name of Ship: M.V. "X-PRESS ALTAIR" Barge : M.T. "ABC SUN"
Date of Survey: 15.11.2023 Location : Anchorage, Fujairah
Report No. 27363/23/VM

We, the appointed Bunker Surveyor of Constellation Marine Services LLC did attend on board the M.V. "X-PRESS ALTAIR"
at Anchorage, Fujairah on 15.11.2023 for the purpose of conducting a survey.
We would like to report on the following point(s):

1) The undersigned surveyor has boarded on board the vessel mv. "X-PRESS Altair" at 0330 hours on 26.12.23 whilst she
was safely anchored at 'Fujairah UAE to conduct BQS

2) After a brief discussion with Chief Engineer on board the mv. "X- PRESS Altair", we carried out gauging of all bunker tanks
of VLS FO & LS MGO and determined the ROB prior bunkering / upon boarding jointly with Ship's C/Engineer & 3rd Engineer.
Vessel's FO/DO transfer pump valves were found to be shut prior initial gauging and instructed to vessel not to operate until
completion of bunkering

3) Volume of each bunker tank on board the mv. "X-press altair" was determined from the calibration table presented to us
basis the present trim/list and tanks # & 1P/S ,2P,5S,6S has nominated to receive VLS FO & MDO tank # 1 MGO STR & 3 MGO STR by the Chief Engineer

4) The first bunker barge mt. "ABC SUN" arrived alongside/double banked at 0224 hours on 15.12.23. However,
and surveyor went to board the barge and checked all bunker tanks and calculated the quantity.cheif officer also agree quantity.

5) A pre bunkering meeting was held between the Chief Engineer, undersigned surveyor & Barge's Cargo Officer from deck of
both vessels and discussed about the nominated quantity, sampling and pumping rate etc.

6) Gauging on board the Bunker vessel was carried out by using barge's UTI detector, witnessed by barge's Cargo Officer only.
As stated by the Cargo Officer, Bunker barge has nominated her cargo tanks # tanks for LSMGO # 3P/S

7) MV X-press Altair" has taken two (2) samples of each VLS FO & LS MGO from vessel inlet manifold by continuous drip
sampling through out the bunkering. All bottles were properly labeled & sealed in the presence of undersigned personel.

8) The barge MT " ABC SUN has taken three (3) sample of each VLS FO & LS MGO from vessel's manifold, witnessed by
the undersigned and supplier has counter sealed vessel's 4 samples except vessel retention 2 for both VLS FO & LS MGO.
All the above bunker sample seal numberes including counter seal numbers were entered on the BDN.

9) Both vessel & barge noted was to be rolling slightly during gauaging / bunkering.

Mr. Vinayan.M Mr. Mesias Collin Moran Mr Vikas Yadav


Surveyor Barge's Cargo Officer Chief Engineer
Ref. No. Dt. Of Issue Rev. No. Prepared by Approved by

This report is issued to the best of our knowledge and ability, true and without prejudice as to our principal’s liability, reserving the right to extend it where required and for the
benefit of whom it may concern. Our responsibility is limited to exercise of reasonable care and due diligence with information furnished to our surveyors.

You might also like