Project: PROPOSED 1-Storey COMMERCIAL BUILDING

Owner:
Location:

BILL OF MATERIALS
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT
A MOBILIZATION
B CLEARING OF AREA
C CLEARING OF DEMOLISHED DEBRIS
D ENCLOSURE OF AREA
Sub-total -
E EARTHWORKS
E.1 EXCAVATION
1 Footings
E.2 BACKFILLING / FILLING& COMPACTING
1 Gravel Fill (G1) 5.00 cu.m. 300 1,500.00
Sub-total 1,500.00
F FORMWORKS & SCAFFOLDINGS 2,500.00
G CONCRETE WORKS
G.1 CONCRETE FOOTINGS
1 Portland Cement 19.00 bags. 210.00 3,990.00
2 Screened sand #NAME? cu.m. 1250.00 #NAME?
3 ¾” Gravel #NAME? cu.m. 1200.00 #NAME?
4 10mm Ø Reinforced Steel bar #NAME? pcs. 105.00 #NAME?
5 #16 G.I. Tie Wire 5.00 kgs. 80.00 400.00
G.2 CONCRETE COLUMNS
1 Portland Cement 13.00 bags. 210.00 2,730.00
2 Screened sand #NAME? cu.m. 1250.00 #NAME?
3 ¾” Gravel #NAME? cu.m. 1200.00 #NAME?
4 10mm Ø Reinforced Steel bar 36.00 pcs. 105.00 3,780.00
5 8mm Ø Reinforced Steel bar 22.00 pcs. 77.00 1,694.00
6 #16 G.I. Tie Wire 15.00 kgs. 80.00 1,200.00
G.3 WALL FOOTING
1 Portland Cement 10.00 bags 210.00 2,100.00
2 Screened sand 2.00 cu.m. 1250.00 2,500.00
3 ¾” Gravel 4.00 cu.m. 1200.00 4,800.00
4 10mm Ø Reinforced Steel bar 22.00 pcs. 105.00 2,310.00
5 #16 G.I. Tie Wire 10.00 kgs. 80.00 800.00
G.4 CONCRETE BEAMS
1 Portland Cement #NAME? bags 210.00 #NAME?
2 Screened sand #NAME? cu.m. 1250.00 #NAME?
3 ¾” Gravel #NAME? cu.m. 1200.00 #NAME?
4 10mm Ø Reinforced Steel bar #NAME? pcs. 105.00 #NAME?
5 8mm Ø Reinforced Steel bar #NAME? pcs. 77.00 #NAME?
6 #16 G.I. Tie Wire 15.00 kgs. 80.00 1,200.00
G.5 SLAB ON GRADE
1 Portland Cement 33.00 bags 210.00 6,930.00
2 Screened sand 4.00 cu.m. 1250.00 5,000.00
3 ¾” Gravel 7.00 cu.m. 1200.00 8,400.00
4 10mm Ø Reinforced Steel bar 42.00 pcs. 105.00 4,410.00
5 #16 G.I. Tie Wire 15.00 kgs. 80.00 1,200.00
G.6 CHB WALL& PLASTERING
1 CHB 4" 750.00 nos 15.00 11,250.00
2 Cement 50.00 bags 210.00 10,500.00
3 Screened Sand 3.00 cu.m 1250.00 3,750.00
4 Fine Sand 3.50 cu.m 1400.00 4,900.00
5 Tie wire G.I. #16 10.00 kls 80.00 800.00
6 10mmØ x 6m RSB 63.00 pcs 105.00 6,615.00
Sub-total #NAME?
H ROOF & ROOF FRAMING
1 2"x4" Rafter 184 bd.ft 40.00 7,369.07
2 2"x2" Braces & Purlins 11 bd.ft 40.00 437.33
3 1"x10" Fascia Board 49 bd.ft 40.00 1,941.76
4 Asstd. Nails (Kgs.) 8 kgs. 60.00 480.00
5 Long Span Deck (pre painted) 25ft length 21 sheets 910.00 19,110.00
6 Umbrella Nails 2.00 kls. 80.00 160.00
7 Vulca seal 1.00 tube 75.00 75.00
Sub-total 29,573.16
I PLUMBING
1 1/2"Ø PVC Pipe (blue) 4.00 pcsx3m 90.00 360.00
2 1/2" coupling (blue) 3.00 pcs 20.00 60.00
3 1/2" Elbow (blue) 6.00 pcs 20.00 120.00
4 1/2" Tee (blue) 2.00 pcs 25.00 50.00
6 4" pipe (orange) 5.00 pcsx3m 550.00 2,750.00
7 4" elbow 45° (orange) 2.00 pcs 160.00 320.00
8 4" elbow 90° (orange) 1.00 pcs 160.00 160.00
9 4" Wye (orange) 1.00 pcs 160.00 160.00
10 4" Cleanout cap 1.00 pcs 80.00 80.00
11 4" Tee (orange) 1.00 pcs 170.00 170.00
12 2" pipe (orange) 4.00 pcsx3m 225.00 900.00
13 2" elbow 90° (orange) 5.00 pcs 45.00 225.00
14 2" Wye (orange) 1.00 pcs 160.00 160.00
15 PVC Solvent 2.00 cans 70.00 140.00
Septic Vault 0.00
16 Cement 22.00 bags 210.00 4,620.00
17 Sand 5.00 cu.m 1,250.00 6,250.00
18 Gravel 2.50 cu.m 1,200.00 3,000.00
19 Fine Sand 1.00 cu.m 1,400.00 1,400.00
20 CHB 4" 228.00 pcs. 15.00 3,420.00
21 10mmØ x 6m RSB 128.00 nos. 105.00 13,440.00
22 4" pipe (orange) 3.00 pcs 550.00 1,650.00
23 4" Tee (orange) 7.00 pcs 180.00 1,260.00
24 Kitchen Sink/faucet/fittings 1.00 sets 2,500.00 2,500.00
25 Water closet & accessories 1.00 set 6,000.00 6,000.00
26 Shower & accessories 1.00 set 2,500.00 2,500.00
27 Lavatory/Fittings/faucet 1.00 set 2,500.00 2,500.00
28 Floor drain 1.00 set 500.00 500.00
Sub-total 54,695.00
J DOORS AND WINDOWS
1 D1 - 2.4x2.3m Fabricated Plywood Door 1.00 set 1,000.00 1000.00
2 D2 - 0.8x2.1m Fabricated Plywood Door 5.00 sets 500.00 2500.00
3 D3 - 0.7x2.1m Fabricated Plywood Door 2.00 sets 750.00 1500.00
4 Door jambs 8.00 sets 750.00 6000.00
5 W1 - 1.8x1.5m Fabricated Plywood window 1.00 set 500.00 500.00
6 W2 - 1.5x1.2m Fabricated Plywood window 2.00 sets 500.00 1000.00
7 W3 - 2.9x1.3m Fabricated 2" Cyclone window 1.00 set 750.00 750.00
8 W4 - 1.0x1.5m Fabricated Plywood window 1.00 set 500.00 500.00
9 Door Knobs 8.00 sets 350.00 2800.00
10 Door hinges 21.00 sets 75.00 1575.00
Sub-total 18,125.00
K ELECTRICAL
1 Fuse Box 1.00 pcs 245.00 245.00
2 Fuse 20amp 1.00 pcs 25.00 25.00
3 Fuse 15amp 1.00 pcs 20.00 20.00
4 2.0mm2 TW Cu. Wire 20.00 mts 25.00 500.00
5 3.5mm2 TW Cu. Wire 10.00 mts 29.00 290.00
6 1/2"Ø PVC electrical pipes 3.00 pcsx3m 150.00 450.00
7 1/2" elbow 3.00 pcs 15.00 45.00
8 1/2" PVC clamp 12.00 pcs 3.00 36.00
9 Junction box 3.00 pcs 50.00 150.00
10 utility box 3.00 pcs 40.00 120.00
11 duplex outlets 4.00 pcs 85.00 340.00
12 1-gang switch 6.00 pcs 60.00 360.00
13 3-gang switch 1.00 pcs 85.00 85.00
14 Electrical tape 2.00 pcs 35.00 70.00
15 pvc solvent 1.00 cans 80.00 80.00
Sub-total 2,816.00
L POWER TOOLS
M CLEARING
N Material Cost #NAME?
O Contengencies
P Labor Cost
Q Supervison Fee
R TOTAL PROJECT COST #NAME?

Prepred by:

Engr. Michael John A. Apgao


PRC # 094128
TIN # 495-906-416
PTR # 1024790
Project: PROPOSED 1-Storey COMMERCIAL BUILDING
Owner:
Location:

BILL OF MATERIALS
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST
A MOBILIZATION
B CLEARING OF AREA
C CLEARING OF DEMOLISHED DEBRIS
D ENCLOSURE OF AREA
Sub-total
E EARTHWORKS
E.1 EXCAVATION
1 Footings
E.2 BACKFILLING / FILLING& COMPACTING
1 Gravel Fill (G1) #NAME? cu.m. 1250
Sub-total
F FORMWORKS & SCAFFOLDINGS
G CONCRETE WORKS
G.1 CONCRETE FOOTINGS
1 Portland Cement #NAME? bags. 285.00
2 Screened sand #NAME? cu.m. 1250.00
3 ¾” Gravel #NAME? cu.m. 1200.00
4 12mm Ø Reinforced Steel bar #NAME? pcs. 330.00
5 #16 G.I. Tie Wire 10.00 kgs. 80.00
G.2 CONCRETE COLUMNS
1 Portland Cement #NAME? bags. 285.00
2 Screened sand #NAME? cu.m. 1250.00
3 ¾” Gravel #NAME? cu.m. 1200.00
4 12mm Ø Reinforced Steel bar #NAME? pcs. 330.00
5 10mm Ø Reinforced Steel bar 0.00 pcs. 190.00
6 #16 G.I. Tie Wire 15.00 kgs. 80.00
G.3 WALL FOOTING
1 Portland Cement 28.00 bags 285.00
2 Screened sand 2.00 cu.m. 1250.00
3 ¾” Gravel 4.00 cu.m. 1200.00
4 10mm Ø Reinforced Steel bar 44.00 pcs. 330.00
5 #16 G.I. Tie Wire 10.00 kgs. 80.00
G.4 CONCRETE BEAMS
1 Portland Cement #NAME? bags 285.00
2 Screened sand #NAME? cu.m. 1250.00
3 ¾” Gravel #NAME? cu.m. 1200.00
4 12mm Ø Reinforced Steel bar #NAME? pcs. 330.00
5 10mm Ø Reinforced Steel bar #NAME? pcs. 130.00
6 #16 G.I. Tie Wire 15.00 kgs. 80.00
G.6 SLAB ON GRADE
1 Portland Cement 63.00 bags 285.00
2 Screened sand 4.00 cu.m. 1250.00
3 ¾” Gravel 7.00 cu.m. 1200.00
4 10mm Ø Reinforced Steel bar 62.00 pcs. 190.00
5 #16 G.I. Tie Wire 15.00 kgs. 80.00
G.7 CHB WALL& PLASTERING
1 CHB 4" 1696.00 nos 15.00
2 Cement 230.00 bags 285.00
3 Screened Sand 6.00 cu.m 1250.00
4 Fine Sand 7.00 cu.m 1400.00
5 Tie wire G.I. #16 10.00 kls 80.00
6 10mmØ x 6m RSB 93.00 pcs 190.00
Sub-total
H ROOF & ROOF FRAMING
1 2"x4" Rafter 184 bd.ft 40.00
2 2"x2" Braces & Purlins 11 bd.ft 40.00
3 1"x10" Fascia Board 49 bd.ft 40.00
4 Asstd. Nails (Kgs.) 8 kgs. 60.00
5 Long Span Deck (pre painted) 25ft length 13 sheets 2,476.40
6 Pre-formed spanish ridge roll 11.10 mts 250.00
7 Umbrella Nails 2.00 kls. 80.00
8 Vulca seal 1.00 tube 75.00
Sub-total
I CEILING WORKS
1 Insulation foam (meter lengthx1m width) 63.0 mts 70.00
Sub-total
J PAINTING WORKS
1 Concrete Neutralizer 5 gals 415.00
2 Boysen Flat Latex White 1 pail 3,200.00
3 Boysen Semi-gloss Latex topcoat 1 pail 3,700.00
5 Masonry putty 1 pail 1,200.00
7 Painting accessories 5 sets 800.00
8 Sand paper (assorted) 10 pcs 150.00
Sub-total
K TILE WORKS
1 Room floor tiles porcelain tiles (60x60) 39.00 pcs 190.00
2 Toilet floor ceramic tiles (30x30) 51.00 pcs 100.00
3 Kitchen counter ceramic tiles (20x20) 22.00 pcs 70.00
4 ABC Tile Adhesive or equivalent 20.00 bags 270.00
Sub-total
L PLUMBING
1 1/2"Ø PVC Pipe (blue) 4.00 pcsx3m 90.00
2 1/2" coupling (blue) 3.00 pcs 20.00
3 1/2" Elbow (blue) 6.00 pcs 20.00
4 1/2" Tee (blue) 2.00 pcs 25.00
5 Gate Valve 1/2" (Falcon) 1.00 pc 400.00
6 4" pipe (orange) 5.00 pcsx3m 550.00
7 4" elbow 45° (orange) 2.00 pcs 160.00
8 4" elbow 90° (orange) 1.00 pcs 160.00
9 4" Wye (orange) 1.00 pcs 160.00
10 4" Cleanout cap 1.00 pcs 80.00
11 4" Tee (orange) 1.00 pcs 170.00
12 2" pipe (orange) 4.00 pcsx3m 225.00
13 2" elbow 90° (orange) 5.00 pcs 45.00
14 2" Wye (orange) 1.00 pcs 160.00
15 PVC Solvent 2.00 cans 70.00
Septic Vault 0.00
16 Cement 52.00 bags 270.00
17 Sand 5.00 cu.m 1,250.00
18 Gravel 2.50 cu.m 1,200.00
19 Fine Sand 1.00 cu.m 1,400.00
20 CHB 4" 428.00 pcs. 15.00
21 12mmØ x 6m RSB 268.00 nos. 190.00
22 4" pipe (orange) 3.00 pcs 550.00
23 4" Tee (orange) 7.00 pcs 180.00
24 Kitchen Sink/faucet/fittings 1.00 sets 2,500.00
25 Water closet & accessories 1.00 set 6,000.00
26 Shower & accessories 1.00 set 2,500.00
27 Lavatory/Fittings/faucet 1.00 set 2,500.00
28 Floor drain 1.00 set 500.00
29 Tissue holder 1.00 set 500.00
30 Soap holder 1.00 set 500.00
Sub-total
M DOORS AND WINDOWS
1 D1 - 2.4x2.3m Fabricated Plywood Door 1.00 set 1,500.00
2 D2 - 0.8x2.1m Fabricated Plywood Door 5.00 sets 5,000.00
3 D3 - 0.7x2.1m Fabricated Plywood Door 2.00 sets 1,800.00
4 Door jambs 8.00 sets 1,500.00
5 W1 - 1.8x1.5m Fabricated Plywood window 1.00 set 500.00
6 W2 - 1.5x1.2m Fabricated Plywood window 2.00 sets 500.00
7 W3 - 2.9x1.3m Fabricated 2" Cyclone window 1.00 set 1,000.00
8 W4 - 1.0x1.5m Fabricated Plywood window 1.00 set 500.00
9 Door Knobs 8.00 sets 800.00
10 Door hinges 21.00 sets 150.00
Sub-total
O ELECTRICAL
1 Panel Board 3 branches 11.00 pcs 350.00
2 Circuit breaker 60amp 0.00 pcs 400.00
3 Circuit breaker 15amp 2.00 pcs 350.00
4 2.0mm2 TW Cu. Wire 40.00 boxes 500.00
5 3.5mm2 TW Cu. Wire 20.00 boxes 500.00
6 1/2"Ø PVC electrical pipes 6.00 pcsx3m 150.00
7 1/2" elbow 3.00 pcs 15.00
8 1/2" PVC clamp 12.00 pcs 3.00
9 Junction box 3.00 pcs 50.00
10 utility box 9.00 pcs 40.00
11 duplex outlets 4.00 pcs 85.00
12 1-gang switch 6.00 pcs 60.00
13 3-gang switch 1.00 pcs 85.00
14 Electrical tape 5.00 pcs 35.00
15 pvc solvent 2.00 cans 80.00
Sub-total
P POWER TOOLS
Q CLEARING
R Material Cost
S Contengencies
T Labor Cost
U Supervison Fee
V TOTAL PROJECT COST

Prepred by:

Engr. Michael John A. Apgao


PRC # 094128
BILL OF MATERIALS
AMOUNT

#NAME?
#NAME?
2,500.00

#NAME?
#NAME?
#NAME?
#NAME?
800.00

#NAME?
#NAME?
#NAME?
#NAME?
0.00
1,200.00

7,980.00
2,500.00
4,800.00
14,520.00
800.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
1,200.00

17,955.00
5,000.00
8,400.00
11,780.00
1,200.00

25,440.00
65,550.00
7,500.00
9,800.00
800.00
17,670.00
#NAME?

7,369.07
437.33
1,941.76
480.00
32,193.20
2,775.00
160.00
75.00
45,431.36

4,410.00
4,410.00

1,937.75
3,735.42
4,319.08
1,400.78
4,000.00
1,500.00
16,893.04

7,410.00
5,100.00
1,540.00
5,400.00
19,450.00

360.00
60.00
120.00
50.00
400.00
2,750.00
320.00
160.00
160.00
80.00
170.00
900.00
225.00
160.00
140.00

14,040.00
6,250.00
3,000.00
1,400.00
6,420.00
50,920.00
1,650.00
1,260.00
2,500.00
6,000.00
2,500.00
2,500.00
500.00
500.00
500.00
105,995.00

1500.00
25000.00
3600.00
12000.00
500.00
1000.00
1000.00
500.00
6400.00
3150.00
54,650.00

3850.00
0.00
700.00
20000.00
10000.00
900.00
45.00
36.00
150.00
360.00
340.00
360.00
85.00
175.00
160.00
37,161.00

#NAME?

#NAME?
CONTINGENCY INPUT 10%

Item Description L/H (m) W (m) T (m)

Footings
1 Footing F1 #NAME? #NAME? #NAME?

2 Wall Footing 52.0 0.35 0.15


Su
Concrete Class A ColFooting WF Unit
Cement #NAME? 28 bags
Gravel #NAME? 4 cu.m
Sand #NAME? 2 cu.m

Columns
1 Columns C1 #NAME? Err:540 Err:540
2 Columns C2 #NAME? Err:540 Err:540

Su
Concrete Class A Unit
Cement #NAME? bags
Gravel #NAME? cu.m
Sand #NAME? cu.m

Beams
1 Beam B1 12.81 #NAME? #NAME?
2 Beam B2 24.54 #NAME? #NAME?

Su
Concrete Class A Unit
Cement #NAME? bags
Gravel #NAME? cu.m
Sand #NAME? cu.m

Slab
1 Slab on grade 7 9 0.1
Su
Concrete Class A Unit
Cement 63.00 bags
Gravel 7.00 cu.m
Sand 4.00 cu.m
1.1

Rebar length Rebar length


Total Vol. + 10%
Vol. (m3) Qty LONG/ Top&bot TRANS/ Top&bot
Contingency
(m) (m)

#NAME? 10 #NAME? #NAME? #NAME?

2.730 1 3.00 172 67


Subtotal #NAME?

Main Bars

Reqd length +
Size
10% contingency

#NAME? 7 #NAME? #NAME? 8 - 12Ø


#NAME? 3 #NAME? #NAME? 4 - 12Ø

Subtotal #NAME?

No of top bars No of bot. bars

#NAME? 1 #NAME? #NAME? #NAME?


#NAME? 1 #NAME? #NAME? #NAME?

Subtotal #NAME?

Trans (total) Long (total)

6.300 1 6.930 166.85 168.35


Subtotal 6.930
Total Required +
Equivalent no. of
Rebar Size(Ø) 10% contingency
6-meter bars
(m)

12Ø #NAME? #NAME?

10Ø 262.2 44

ain Bars Tie Bars


Equiv. nos of 6-
Equiv. nos of 6- Bar length each No. of
Size meter length (w/
meter length tie loop loops/length
10% contingency)
#NAME? Err:540 #NAME? 10Ø Err:540
#NAME? Err:540 #NAME? 10Ø Err:540

Stirrups
Total length of bars
Eq. nos of 6-
(m) + 10% Rebar Size Size No. of beams
meter length
contingency
#NAME? 12Ø #NAME? 10Ø 3
#NAME? 12Ø #NAME? 10Ø 4

Total rebars length


Total equiv.nos of
(m) + 10% Size
6-meter length
contingency

368.7 10Ø 62
Stirrups

Total No. of stirrup length of Total reqd stirrup Equiv. nos of 6-


loops bar/loop length + 10% (m) meter length

81 #NAME? #NAME? #NAME?


145 #NAME? #NAME? #NAME?
CONTINGENCY INPUT 10%
1.1
MATERIALS SUMMARY FOR STEEL Qnty Reqd of 6-
Item Total Length meter + 10% Board Feet
2"x4" Rafter 84.3 contingency
16 184.2266667
2"x2" Braces & Purlins 5.0 1 10.93333333
1"x10" Fascia Board 22.2 5 48.544
Asstd. Nails (Kgs.) 8.0 2

CONTINGENCY INPUT 10%


MATERIALS SUMMARY FOR STEEL Qnty Reqd of 6-
Item Total Length meter + 10%
2"x4"x1/16"x6m C-Purlins 260.0 contingency
48
2"x2"x4mm Angle (Truss) 165.0 31
1"x1"x3mm" Angle (Truss web) 124.8 23
1"x1"x3mm Angle (Angle cleat) 7.7 2
1"x1"x2mm Angle (fascia frame) 80.0 15
10mmØ round bar sag rods 84.8 16
Epoxy Paint, rust proofing (liters) 2
Turco rust converter (liters) 5
Welding rod (kls) 50
Item Reqd length (m) length (ft) Unit price/length unit price/pc Subtotal

Long Span Deck (pre painted) 13 7.55 24.764 100.00 2,476.40 247,640.00

Pre-formed spanish ridge roll 11.1 250.00 2,775.00

Insulation foam (meter lengthx1m width) 63 70.00 4,410.00


Umbrella Nails 2 80.00 160.00
-
Vulca seal 1 500.00 500.00
Subtotal 254,985.00

Item Reqd length (m) length (ft) Unit price/length unit price/pc Subtotal
Long Span Deck (pre painted) 25 7.55 24.764 100.00 2,476.40 247,640.00
Pre-formed Spanish Gutter/flashing 60 250.00 15,000.00
Pre-formed spanish ridge roll 10.2 250.00 2,550.00
3/4" x 10" pre-cut cement board fascia 24
Insulation foam (meter lengthx1m width) 170 70.00 11,900.00
Tek screw 3 500.00 1,500.00
Rivets 3 500.00 1,500.00
Vulca seal 3 500.00 1,500.00
Subtotal 280,090.00
CONTINGENCY
INPUT 5%
1.05

Effective Window Area


CHB Wall Length (m) Door Area (sq.m)
Height (m) (sq.m)

Outer walls 2.9 42 17.09 12.81


Division walls 2 9
T&B walls 2.7 7.1

Effective wall
Cement
Cement mortar area + 5% CHB size Screened Sand
"Type-A"
(sq.m)

Outer walls 96.50 4" 76.42 4.20


Division walls 18.90 4" 14.97 0.82
T&B walls 20.13 4" 15.94 0.88

Effective wall Plaster


Wall Area x 2
Plastering wall area + 5% Thickness Cement
face(sq.m)
(sq.m) (mm)

Outer walls 96.50 192.99 25 86.85


Division walls 18.90 37.80 25 17.01
T&B walls 20.13 40.26 25 18.12

MATERIALS SUMMARY FOR MASONRY


Item Qnty Reqd Unit

CHB 4" 1696.0 nos


Cement 230.0 bags
Screened Sand 6.0 cu.m
Fine Sand 7.0 cu.m
Tie wire G.I. #16 10.0 kls
10mmØ x 6m RSB 93.0 pcs
Rebars
Effective wall area Total Reqd length
Required No. Of
(sq.m) + 5% Hor Ver Size (m) + 5%
CHB
contingency contingency

96.50 1207 203.0 203.0 10Ø 426.3


18.90 237 30.0 30.0 10Ø 63.0
20.13 252 32.0 32.0 10Ø 67.1

Fine Sand

4.82
0.95
1.01
CONTINGENCY
INPUT 10% 1.1
Excavation Volumes
Volume
L (m) W (m) D (m) Qty
excavated (m3)

Footing F1 #NAME? #NAME? #NAME? #NAME? 10

Wall Footing 52.0 0.35 0.55 10.01 1


Total excavation
Filling Materials
Area (sq.m) + Total Volume
Depth of fill (m)
10% contingency of fill (cu.m)

Gravel fill G1 #NAME? 0.05 #NAME?


Soil fill #NAME? 0.15 #NAME?
Total Volume
Subtotal Area
(m3)

#NAME? #NAME?

10.01 18.20
#NAME?
CONTINGENCY INPUT 10% 1.1
CEILING MATERIALS

Required Quantity
Qty Unit
+ 10% contingency

Heat Insulator 63 Sq.m 24

Qty Unit Required Quantity


+ contingency
Cement board 3.5mmx4'x8' 222 Sq.m 0
Metal furring system 222 Sq.m 0
CONTINGENCY INPUT 10 % 1.1
TILEWORKS
Area +10%
Location Area (sq.m) contingency
(sq.m)

Interior walls 97 107


T&B interior 9 10
Exterior walls

Total Paint area 117

Items Unit Required qty


Concrete Neutralizer gals 5
Boysen Flat Latex White pail 1
Boysen Semi-gloss Latex topcoat pail 1
Masonry putty pail 1
Painting accessories set 5
Sand paper pcs (ft) 10
3.891066667
3.891066667
3.891066667
CONTINGENCY INPUT 10% 1.1
TILEWORKS

Tile area
Total Area
(sq.m) + 10% Tile Size
(sqm)
contingency

Room floor tiles porcelain tiles 12.6 13.86 60x60

Toilet floor ceramic tiles 4.2 4.62 30x30


Kitchen counter ceramic tiles 0.8 0.88 20x20

ABC Tile Adhesive or equivalent 20 bags


No. of Tiles Price Subtotal

39 170 Php 6,630.00

51 70 Php 3,570.00
22 50 Php 1,100.00

260 Php 5,200.00


Php 16,500.00
PLUMBING MATERIALS SUMMARY
Item Reqd Unit Septic Vault
1/2"Ø PVC Pipe (blue) 4 pcsx3m L (m)
1/2" coupling (blue) 3 pcs Flooring foundation concrete 4.4
1/2" Elbow (blue) 6 pcs Flooring/foundation rebars
1/2" Tee (blue) 2 pcs Concrete Footing 11.52
Gate Valve 1/2" (Falcon) 1 pc Footing Rebars
4" pipe (orange) 5 pcsx3m Top cover concrete 4.4
4" elbow 45° (orange) 2 pcs Top cover rebars, 12Ø
4" elbow 90° (orange) 1 pcs CHB 4" Chamber walls 17.1
4" Wye (orange) 1 pcs Wall rebars, 12Ø
4" Cleanout cap 1 pcs Cement (mortar)
4" Tee (orange) 1 pcs Sand (mortar)
2" pipe (orange) 4 pcsx3m Cement (cover/foundation)
2" elbow 90° (orange) 5 pcs Sand (cover/foundation)
2" Wye (orange) 1 pcs Gravel (cover/foundation)
PVC Solvent 2 cans Length
Septic Vault Internal wall plaster (16mm) 10.8
Cement 52.0 bags
Sand 5.0 cu.m
Gravel 2.5 cu.m
CHB 4" Chamber walls 428.0 pcs.
Fine Sand 1.0 cu.m
12mmØ x 6m RSB 268.0 nos.
4" pipe (orange) 3 pcs
4" Tee (orange) 7 pcs
Kitchen Sink/faucet/fittings 1 sets
Water closet & accessories 1 set
Shower & accessories 1 set
Lavatory/Fittings/faucet 1 set
Floor drain 1 set
Tissue holder 1 set
Soap holder 1 set
W (m) T (m) Req'd Unit
2 0.1 0.88 cu.m
108.90 m
0.35 0.15 0.60 cu.m
44.85 m
2 0.1 0.88 cu.m
99.90 m
2 428.00 pcs
58.65 m
28.70 bags
2.89 cu.m
19.51 bags
1.18 cu.m
2.36 cu.m
Height Area Cement Fine sand
1.8 19.44 3 1
Item No. Description Qty Unit

1 D1 - 2.4x2.3m Fabricated Plywood Door 1 sets


2 D2 - 0.8x2.1m Fabricated Plywood Door 5 sets
3 D3 - 0.7x2.1m Fabricated Plywood Door 2 sets
4 Door jambs 8 sets
5 W1 - 1.8x1.5m Fabricated Plywood window 1 sets
6 W2 - 1.5x1.2m Fabricated Plywood window 2 sets
7 W3 - 2.9x1.3m Fabricated 2" Cyclone window 1 set
8 W4 - 1.0x1.5m Fabricated Plywood window 1 sets
9 Door Knobs 8 sets
10 Door hinges 21 sets
11 Dead bolt for main doors 11 sets

Item No. Description Qty Unit


1 D1 - 0.8x2.1m solid door panel 10 sets
2 D2 - 0.7x2.1m solid door panel 3 sets
3 D3 - 0.6x2.1m PVC door 10 sets
4 D4 - 0.6x2.1m solid door panel 1 set
5 Door jambs 14 sets
6 W1 - 1.2x1.25m sliding type window 6 sets
7 W1 - 1.0x1.0m sliding type window 6 set
8 W4 - 0.4x0.4m sliding type window 10 sets
9 Cylindrical type (chrome finish) lockset 24 sets
10 Door hinges (heavy duty) 36 sets
11 Dead bolt for main doors 11 sets
Item No. Description Qty Unit
1 2" stainless steel pipe standard (6m length) 4 m
2 1" stainless steel pipe standard (6m length) 14 m
3 Kitchen counter cabinets 10 set
Items Qty. Unit Items Qty. Unit
Fuse Box 245 11 pcs Panel Board 3 branches 11 pcs
Circuit breaker 60amp 11 pcs
Fuse 20 2 pcs Circuit breaker 15amp 22 pcs
2.0mm2 TW Cu. Wire 40 m 2.0mm2 TW Cu. Wire 7 boxes
3.5mm2 TW Cu. Wire 20 m 3.5mm2 TW Cu. Wire 7 boxes
1/2"Ø PVC electrical pipes 6 pcsx3m 1/2"Ø PVC electrical pipes 65 pcsx3m
1/2" elbow 3 pcs 1/2" elbow 70 pcs
1/2" PVC clamp 12 pcs 1/2" PVC clamp 12 pcs
Junction box 3 pcs Junction box 12 pcs
utility box 9 pcs utility box 90 pcs
2-gang outlets 4 pcs 2-gang outlets 54 pcs
1-gang switch 6 pcs 1-gang switch 12 pcs
3-gang switch 1 pcs 2-gang switch 21 pcs
Electrical tape 5 pcs Electrical tape 15 pcs
pvc solvent 2 cans pvc solvent 3 cans