Professional Documents
Culture Documents
Painting Format
Painting Format
MUNDRA TERMINAL
FINISH COAT INSPECTION REPORT
PO NO:
DIGITAL ELCOMETER SR. NO: F 230982 ACCEPTABLE SURFACE THICKNESS: 245 MICRON
FINAL COAT OF PU
LENGTH BREADTH AREA DFT READING
Sr. No. DATE WORK AREA
(METRE) (METRE) (SQM) (MICRONS)
SUBMITTED BY CHECKED BY
VENDOR
HPCL OFFICER
SUPERVISOR
HINDUSTAN PETROLEUM CORPORATION LIMITED
MUNDRA TERMINAL
FINISH COAT INSPECTION REPORT
PO NO:
DIGITAL ELCOMETER SR. NO: F 230982 ACCEPTABLE SURFACE THICKNESS: 205 MICRON
FIRST COAT OF PU
LENGTH BREADTH AREA DFT READING
Sr. No. DATE WORK AREA
(METRE) (METRE) (SQM) (MICRONS)
SUBMITTED BY CHECKED BY
VENDOR
HPCL OFFICER
SUPERVISOR
HINDUSTAN PETROLEUM CORPORATION LIMITED
MUNDRA TERMINAL
INTERMEDIATE COAT INSPECTION REPORT
PO NO:
DIGITAL ELCOMETER SR. NO: F 230982 ACCEPTABLE SURFACE THICKNESS: 100 - 125 MICRON
SUBMITTED BY CHECKED BY
VENDOR
HPCL OFFICER
SUPERVISOR
HINDUSTAN PETROLEUM CORPORATION LIMITED
MUNDRA TERMINAL
PRIMER INSPECTION REPORT
PO NO:
SUBMITTED BY CHECKED BY
VENDOR
SUPERVISOR HPCL OFFICER
HINDUSTAN PETROLEUM CORPORATION LIMITED
MUNDRA TERMINAL
BLASTING INSPECTION REPORT
PROJECT TITLE: TK- 10 MAINTENANCE
PO NO:
SURFACE PROFILE GAUGE SR. NO: S 8536 ACCEPTABLE SURFACE PROFILE: 50 - 70 MICRON
TROUGHS
LENGTH BREADTH AREA
Sr. No. DATE WORK AREA AMPLITUDE READING
(METRE) (METRE) (SQM)
(MICRONS)
SUBMITTED BY CHECKED BY