Professional Documents
Culture Documents
Apt Hyc 150-300 Man Cable Management Assembly Instruction V2-1
Apt Hyc 150-300 Man Cable Management Assembly Instruction V2-1
Cable management
for HYC_150 and HYC_300
2 x M12 X 25
ISO 4017 60Nm
1 Attach the cable management system on top of the charger with the screws
provided. (HYC_150: + add the plastic cover caps)
Cable management
for HYC_150 and HYC_300
2 x M8 x 30 2 x M8 nut
ISO 4762 8Nm DIN 982 8Nm
M10 x 90
ISO 4762
5
Then the cable bracket
is mounted to the cable M10 washer
management with a screw and DIN 125
washer.