SWITCHGEAR
1 Circuit breaker setting and tripping check
2 Installation, alignment and level
3 Switchgear ancillary installation and busbar connection check
4 Power and control cable termination
5 Wiring check
6 Insulation resistance measurement
7 Calibration of meter, relay and switchgear
8 Safety features and interlocking devices check
9 Space heater test
10 Measure earthing resistance
11 High potential test
CABLE ON TRAYS
1 Check cable tray
2 Cable pulling and tie check
3 Insulation resistance test
4 Grounding continuity test
5 High potential test
6 Cable identification
UNDERGROUND CABLES
1 Check cable trench
2 Insulation resistance test
3 Grounding continuity test
4 High potential test
5 Cable identification
6 Install warning tiles and backfill
7 Cable routing marking
TRANSFORMER
1 Installation and leveling
2 Installation
3 Inspect polarity of terminals and phase sequence
4 Power and control cable connection
5 Inspect tap setting
6 Neutral grounding and earth resistance check
7 Insulation resistance measurement
8 Start-up & operational test
CABLES
1 The cable trench is clean and free from any foreign material
2 The size and inspection are as per the approved drawing
3 The circuit identification and terminals numbering are correct and firm
4 The cable and seals are complete and tight
5 The cable glands are complete and tight
6 The clamps and connections of the single-conductor cable are tight and suitable
7 The cable terminations and connection are correct and tight
8 The cable is protected against mechanical damage
9 Check cable tray for ground and rigidity
10 The cable duct bank is correct for size dimension of PVC pipe
11 Visual check for cable correctness
LIGHTING INSTALLATION
1 The enclosure for area classification
2 The number and location of the equipment are correct
3 The distribution panel circuit numbering and loading are correct
4 and the switch ratings and the fuse rating are correct
5 The weather proofing of the cable glands is satisfactory
6 The feeder cable size is correct
7 The operation and seting of the time switches, photoelectric cells
8 magnetic control switches, etc. are satisfactory
9 Check the insulation resistance of each circuits
10 The lighting circuit connection is correct for circuit numbering and
identification
11 Measure the voltage at each socket
ELECTRIC MOTORS
1 The rating of the nameplate is correct
2 The design meets the area classification
3 The shaft blocking device for transport is removed
4 The coupling alignment & rotor end play are satisfactory
5 Rotate the motor by hand
6 The bearings, grease packing grade & quality of grease oil level & oil ring
are in good condition
7 The bolting & water proofing of the terminal box are tight & complete,
8 the terminal connections are correct
9 Test the anti condensation heater
10 Check that the cables & gland are correct
11 Check the continuity of the equipment grounding connection
12 Measure insulation resistance and continuity test
13 Run the motor uncoupled & check the bearing for over heating
14 Check the direction is correct
15 Measure the voltage, ampere & vibration during the uncoupled run
16 Stop the motor & reassemble the coupling
17 The push-button is correctly installed
CATHODIC PROTECTION
1 General check of the followings :
2 Material certification
- Component installation
- Material condition; from damage or loss
- Wiring conditions are complete
- Check connection details to piping , tank or vessel
3 Insulation measurement of power/control circuit of transformer
rectifier
4 Remove DC output wiring & energize transformer rectifier
5 Output voltage & increase / decrease function
6 Disconnect anodes at J/B & Measure installed anode resistance
to suitable ground
7 Measurement of the natural potential between structure and soil at all
test location & bond stations with bond disconnected
8 Restore all removed connections
9 Energize each Transformer & record output voltage, current at stepwise
increase of output
9 Adjust transformer output & confirm specified potential refference
10 Record all transformer setting & output volt, ampere
11 Potential check fully at all designated locations :
- Transformer setting & output volt, amps
- Anode current , Pipe to soil potential, Tank base potensial