A.4.4.3.60.

Pemasangan 1m2 floor harderner


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.120 104,000.00 12,480.00
Tukang Batu L.O2 OH 0.120 117,000.00 14,040.00
Kepala Tukang L.O3 OH 0.012 123,000.00 1,476.00
Mandor L.O4 OH 0.006 123,000.00 738.00
JUMLAH TENAGA KERJA 28,734.00
B BAHAN
Floor Hardener MU-200 kg 5.000 3,484.20 17,421.00

JUMLAH HARGA BAHAN 17,421.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,155.00
E Overhead & Profit 10% x D 4,615.50
F Harga Satuan Pekerjaan (D+E) 50,770.50