PROJECT Q

PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 1 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: BASEMENT 03 Location: Electrical room Panel Ref. SMDB-B3

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 6 mm 13 N/m passed
Earth bus bar 6 mm 13 N/m passed
neutral bus bar 6 mm 13 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE

PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 2 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: BASEMENT 02 Location: Electrical room Panel Ref. SMDB-B2

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 6 mm 13 N/m passed
Earth bus bar 6 mm 13 N/m passed
neutral bus bar 6 mm 13 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE

PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 3 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: BASEMENT 01 Location: Electrical room Panel Ref. SMDB-B1

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 8 mm 25 N/m passed
Earth bus bar 8 mm 25 N/m passed
neutral bus bar 8 mm 25 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 4 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: GROUND
Location: Electrical room Panel Ref. SMDB-GF-01
FLOOR

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 5 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: GROUND
Location: Electrical room Panel Ref. SMDB-GF-02
FLOOR

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 8 mm 25 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 6 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: LEVEL 02 Location: Electrical room Panel Ref. SMDB-201

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 7 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: LEVEL 03 Location: Electrical room Panel Ref. SMDB-301

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 8 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: LEVEL 04 Location: Electrical room Panel Ref. SMDB-401

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 9 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: LEVEL 05 Location: Electrical room Panel Ref. SMDB-501

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 10 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: LEVEL 06 Location: Electrical room Panel Ref. SMDB-601

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 12 mm 75 N/m passed
Earth bus bar 12 mm 75 N/m passed
neutral bus bar 10 mm 50 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE


PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO
PROJECT Q
PLOT NO.: 3820785 (A-013-006), Al FALAK STREET, DUBAI INTERNET CITY, DUBAI, UAE

Performance Test Sheet for Sub-Main Distribution Board


Revision:01 Date: 04-MAY-24 Page 11 of

Sub System : LV Distribution Boards, Panels


Date:23-04-2024 System: Low Voltage
and Enclosures
WIR-MEP-2912
Level: ROOF FLOOR Location: Electrical room Panel Ref. SMDB-RF

Torque Test

Section Bus bar Bolt Torque Applied Remarks


Main Incomer 8 mm 25 N/m passed
Earth bus bar 8 mm 25 N/m passed
neutral bus bar 8 mm 25 N/m passed
Insulation Resistance Test (before Dielectric Test) Ambient Temp. 20˚C Voltage Applied 1 kV DC
Test Connection Test Duration (1min) Insulation Resistance Value Remarks
L1 to L2+L3+N+E 60 sec >4000 MΩ passed

L2 to L1+L3+N+E 60 sec >4000 MΩ passed


L3 to L2+L1+N+E 60 sec >4000 MΩ passed
N to L1+L2+L3+E 60 sec >4000 MΩ passed

ACCEPTANCE STATUS
ESMDB Functional Check
Yes/No REMARKS

V12 385.84 V23: 386.27 V13:383.41 Yes


1. Incoming Supply Voltage
V1N 221.65 V 2N: 224.42 V3N:222.19
Yes
2. ON/OFF switch is working correctly. Incoming Yes

Outgoing Yes

3. Manual Trip Test of installed are working properly Yes

4. ON/OFF switch is working correctly. Yes

5. Indication lamps & multifunction meter are functioning properly. Yes

6. Anti-condensation heater is functional. Test Set-Point N/A

POSITION NAME SIGNATURE DATE

PROJECT ENGINEER MUHAMMAD FASIL 04-05-2024

MEP ENGINEER BIJU BALAN

CONSULTANT CARLO