Professional Documents
Culture Documents
Back Up EDG - 015E20022 - 00
Back Up EDG - 015E20022 - 00
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 2 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
02 - MS - 03A Mixer 1 3300 400 kW 400 kW 2 hr or Finish Process
02 - MS - 03B Mixer 1 3300 400 kW 400 kW 2 hr or Finish Process
02 - CV - 04 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CV - 05 Bucket Elevator 1 380 55 kW 55 kW 2 hr or Finish Process
Weighting System (Hopper+Weight
02 - HP - 06 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
Feeder)
02 - KN - 07 Rotary Kiln 1 3300 420 kW 420 kW 2 hr or Finish Process
02 - RC - 08 Rotary Cooler 1 3300 90 kW 90 kW 2 hr or Finish Process
02 - CV - 09 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CV - 10 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - BN - 13 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
02 - VV - 14 Rotary Valve 1 380 5 kW 5 kW 2 hr or Finish Process
02 - CV - 17 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - PP - 18 Centrifugal Pump 1 380 11.25 kW 11.25 kW 2 hr or Finish Process
02 - RP - 19 Recycle Water Pond 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CZ - 20 Cooling Tower 1 380 15 kW 15 kW 2 hr or Finish Process
02 - PP - 21 Centrifugal Pump 1 380 11.25 kW 11.25 kW 2 hr or Finish Process
02 - CC - 22 Cyclone 1 380 15 kW 15 kW 2 hr or Finish Process
02 - EP - 23 EP Dust Colector System 1 3300 250 kW 250 kW 2 hr or Finish Process
04 - TH - 13 No.1 Settling Thickener 1 380 0.4 kW 0.4 kW 2 hr or Finish Process
04 - BD - 26 Bulk Bag Discharger 1 380 5 kW 5 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 3 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - CV - 27 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 28 MgO Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CO - 29 Compressor 1 380 160 kW 160 kW 2 hr or Finish Process
04 - BN - 31 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CV - 32 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 33 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - BN - 34 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CZ - 35 Cooling Tower 1 380 4 kW 4 kW 2 hr or Finish Process
04 - PP - 36 Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - BD - 39 Bulk Bag Discharger 1 380 5 kW 5 kW 2 hr or Finish Process
04 - CV - 40 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 41 MgO Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - TK - 42 Mg(OH)2 Adjusting Mixer 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 45 Centrifugal Pump 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - BO - 46 Boiler 1 380 13.8 kW 13.8 kW 2 hr or Finish Process
04 - AG - 54 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 55 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 56 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 57 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 58 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 4 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - AG - 59 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 60 Agitator 1 380 22 kW 22 kW 2 hr or Finish Process
04 - AG - 61 Agitator 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 63 Centrifugal Pump 1 380 0.37 kW 0.37 kW 2 hr or Finish Process
04 - PP - 65A Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 65B Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - AG - 66 Agitator 1 380 22 kW 22 kW 2 hr or Finish Process
04 - CV - 74 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 83 Centrifugal Pump 1 380 2.2 kW 2.2 kW 2 hr or Finish Process
04 - CH - 84 Chiller 1 380 13.8 kW 13.8 kW 2 hr or Finish Process
04 - CV - 85A Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85B Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85C Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85D Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 87 Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - FL - 08A No.3 Filter Press A 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08B No.3 Filter Press B 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08C No.3 Filter Press C 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08D No.3 Filter Press D 1 380 4 kW 4 kW 2 hr or Finish Process
04 - PP - 50A Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 5 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - PP - 50B Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 53A Centrifugal Pump A 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53B Centrifugal Pump B 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53C Centrifugal Pump C 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53D Centrifugal Pump D 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 62 A Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 62 B Multistage Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 94 Centrifugal Pump 1 380 1.5 kW 1.5 kW 2 hr or Finish Process
04 - PP - 95 Centrifugal Pump 1 380 0.37 kW 0.37 kW 2 hr or Finish Process
04 - PP - 96 Centrifugal Pump 1 380 1.5 kW 1.5 kW 2 hr or Finish Process
04 - SC - 97 Scrubber 1 TBC TBC TBC 2 hr or Finish Process
04 - BL - 98 Blower 1 380 50 kW 50 kW 2 hr or Finish Process
06 - PP - 08 Centrifugal Pump 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
Office & PJU 220 0.75 kW 0 kW 8 hr
TOTAL 2270 kW
SD/FR/DEG/001 00 25/01/2022