Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 1 of 5

NO AREA PYLOSOPHY BACK UP TIME

1 Beneficiation Stop the ongoing process No back up time

When the power supply stops, cut off the


2 PUG MILL material supply to the pug mill and then continue 2 hr or the ongoing process finished.
the ongoing process until it's finished.

When the power supply stops, continue the


ongoing process until the supply from the Pug
mill is complete. Put the roasted ore in
3 Rotary Kiln 8 hr or until Rotary Kiln shut down finished
emergency stock pile. Then shut down the rotary
kiln by lowering the temperature gradually. 100°C
degree drop in temperature every hour.

When the power supply stops, cut off the


material supply to the Jarosite process and then
4 Jarosite & Hydrolysis 1 hr or the ongoing process finished.
continue the ongoing process to the precipitation
1 tank. Put the slury in no. 1 setling tank.

When the power supply stops, continue suply


5 Ofice & PJU 8 hr.
electricity power with EDG.

SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 2 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
02 - MS - 03A Mixer 1 3300 400 kW 400 kW 2 hr or Finish Process
02 - MS - 03B Mixer 1 3300 400 kW 400 kW 2 hr or Finish Process
02 - CV - 04 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CV - 05 Bucket Elevator 1 380 55 kW 55 kW 2 hr or Finish Process
Weighting System (Hopper+Weight
02 - HP - 06 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
Feeder)
02 - KN - 07 Rotary Kiln 1 3300 420 kW 420 kW 2 hr or Finish Process
02 - RC - 08 Rotary Cooler 1 3300 90 kW 90 kW 2 hr or Finish Process
02 - CV - 09 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CV - 10 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - BN - 13 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
02 - VV - 14 Rotary Valve 1 380 5 kW 5 kW 2 hr or Finish Process
02 - CV - 17 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - PP - 18 Centrifugal Pump 1 380 11.25 kW 11.25 kW 2 hr or Finish Process
02 - RP - 19 Recycle Water Pond 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
02 - CZ - 20 Cooling Tower 1 380 15 kW 15 kW 2 hr or Finish Process
02 - PP - 21 Centrifugal Pump 1 380 11.25 kW 11.25 kW 2 hr or Finish Process
02 - CC - 22 Cyclone 1 380 15 kW 15 kW 2 hr or Finish Process
02 - EP - 23 EP Dust Colector System 1 3300 250 kW 250 kW 2 hr or Finish Process
04 - TH - 13 No.1 Settling Thickener 1 380 0.4 kW 0.4 kW 2 hr or Finish Process
04 - BD - 26 Bulk Bag Discharger 1 380 5 kW 5 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 3 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - CV - 27 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 28 MgO Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CO - 29 Compressor 1 380 160 kW 160 kW 2 hr or Finish Process
04 - BN - 31 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CV - 32 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 33 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - BN - 34 CaCO3 Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - CZ - 35 Cooling Tower 1 380 4 kW 4 kW 2 hr or Finish Process
04 - PP - 36 Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - BD - 39 Bulk Bag Discharger 1 380 5 kW 5 kW 2 hr or Finish Process
04 - CV - 40 Pneumatic Conveyor 1 380 20 kW 20 kW 2 hr or Finish Process
04 - BN - 41 MgO Silo 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - TK - 42 Mg(OH)2 Adjusting Mixer 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 45 Centrifugal Pump 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
04 - BO - 46 Boiler 1 380 13.8 kW 13.8 kW 2 hr or Finish Process
04 - AG - 54 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 55 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 56 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 57 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 58 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 4 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - AG - 59 Agitator 1 380 11 kW 11 kW 2 hr or Finish Process
04 - AG - 60 Agitator 1 380 22 kW 22 kW 2 hr or Finish Process
04 - AG - 61 Agitator 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 63 Centrifugal Pump 1 380 0.37 kW 0.37 kW 2 hr or Finish Process
04 - PP - 65A Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 65B Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - AG - 66 Agitator 1 380 22 kW 22 kW 2 hr or Finish Process
04 - CV - 74 Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 83 Centrifugal Pump 1 380 2.2 kW 2.2 kW 2 hr or Finish Process
04 - CH - 84 Chiller 1 380 13.8 kW 13.8 kW 2 hr or Finish Process
04 - CV - 85A Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85B Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85C Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - CV - 85D Belt Conveyor 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 87 Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - FL - 08A No.3 Filter Press A 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08B No.3 Filter Press B 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08C No.3 Filter Press C 1 380 4 kW 4 kW 2 hr or Finish Process
04 - FL - 08D No.3 Filter Press D 1 380 4 kW 4 kW 2 hr or Finish Process
04 - PP - 50A Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
SD/FR/DEG/001 00 25/01/2022
Date / Rev. No Approved by, Created by,
TECHNICAL INFORMATION 27/06/2022 - 00
Back Up EDG Philosophy Doc. No.
TIN/DEG-01/006 Hilman S. Rulan D.
Page 5 of 5
VOLTAGE POWER
ORIGINAL BACK UP TIME
EQUIPMENT NAME QTY V P TOTAL
TAG NO.
(V) (kW) (kW) (hr)
04 - PP - 50B Centrifugal Pump 1 380 7.5 kW 7.5 kW 2 hr or Finish Process
04 - PP - 53A Centrifugal Pump A 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53B Centrifugal Pump B 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53C Centrifugal Pump C 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 53D Centrifugal Pump D 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 62 A Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 62 B Multistage Centrifugal Pump 1 380 5.5 kW 5.5 kW 2 hr or Finish Process
04 - PP - 94 Centrifugal Pump 1 380 1.5 kW 1.5 kW 2 hr or Finish Process
04 - PP - 95 Centrifugal Pump 1 380 0.37 kW 0.37 kW 2 hr or Finish Process
04 - PP - 96 Centrifugal Pump 1 380 1.5 kW 1.5 kW 2 hr or Finish Process
04 - SC - 97 Scrubber 1 TBC TBC TBC 2 hr or Finish Process
04 - BL - 98 Blower 1 380 50 kW 50 kW 2 hr or Finish Process
06 - PP - 08 Centrifugal Pump 1 380 0.75 kW 0.75 kW 2 hr or Finish Process
Office & PJU 220 0.75 kW 0 kW 8 hr
TOTAL 2270 kW