Online Assessment on HCI IC EHS

Strategy 2022-2023

1. Name

Murugesan P

2. PS NO

20064885

3. Project Name

Cochin New Dry Dock Project

4. Job Code

LE180425

5. Name of BU

Metros

Heavy Structures
Hydel & Tunnel

Mumbai Operations / Special Bridges

6. Cadre

TA/TC

S1-S2

O1-O2

Tier 1 & Above

Tier 2 & Above

Tier 3 & Above

Service cadre / Contract

7. Fatal incidents occurred in the FY 21-22 ?(1 Point)

4 
8

8. As per the IC accident statistics 2021-22, ---------% Plant & Machinery related
works contributed to more accidents(1 Point)

17

31 
25

8
9. As per the Accident statistics overview of FY 21-22, in under P&M works
related, which sub activity maximum Accidents are took place (Reported)?
(1 Point)

P&M Maintenance

Operator violations

Vehicle’s accident

All the above 

10. As per the Safety PYRAMID, what are the Pro-active measures in the given
below?(1 Point)

Finding of Unsafe Act/Condition & NMA reporting 


Reporting of First aid cases & Dangerous occurrences

Reporting of RLTI’s.

Reporting of Fatalities.

11. As per the IC Audit Analysis 2021-22, Which is the lowest scored element in
physical audit elements?(1 Point)

Work at Height 
Lifting operations

Working over or near water body

Electrical safety

12. As per IC EHS Strategy plan 2022-23, which key area to be focused on high
priority?(1 Point)

Risk Management implementation

Plant & Machinery

Subcontractor Management
All of the above

13. What is the IC EHS Target AFR as per the IC EHS Strategic plan of FY 22-23?
(1 Point)

≤ 0.07

≤ 0.15 
≤ 0.17

≤ 0.70

14. . ----------rating will be deducted for Project heads, Construction managers and
project EHS Incharge if any fatality in project (each fatality).(1 Point)

0.5 
1

0.25

0.75

15. .----------rating will be deducted for Project heads, cluster EHS heads and
project EHS In charges if not achieving scoring above 85% in EHS Audits and
not closure the audit compliance within 21 days.(1 Point)

0.50

0.75

0.25 
1

16. What is the weightage given on the personal KPI for the EHS Training?(1 Point)

5%
10%

15%

20%

17. What is the weightage given on the personal KPI for Incident reporting –
Notification within 1hr through App & 24 hr. and complete Investigation report
within 7 days as per IC EHS Strategic plan of FY 2022-23?(1 Point)

10% 
15%

20%

25%

18. What are responsibility of managers to implement strategic plan?(1 Point)

Ensure risk assessment and method statement available for all activities

Ensure risk mitigation plan.

Reporting incidents

All the above 

19. What are responsibility of Project heads to implement strategic plan?(1 Point)

Define responsibility

Incorporate EHS in all business matters.

Developing plans and programs.

All the above 

20. As per the strategy plan, Who’s Action for 100% Digital Implementation of IB4U
inspection (*for applicable projects)(1 Point)
Admin In charge

Project EHS In charge

P&M In charge & P&M Engineer 

All the above

21. Health and well-being management inspection to be conducted for site once in
------------ as per 2022-23 IC strategic plan.(1 Point)

1 Month 
3 Months

6 Months

12 Months

22. Minimum --------------- nos. of trees per project has been planned in the FY
22-23 (1 Point)

200

300

400

500 

23. Which of the following element is new additional part of EHS/Environmental


strategy for 2022-(1 Point)

ESG sustainability targets 

Sustainability targets

Global warming targets

Environment target
24. What shall project do towards energy conservation?(1 Point)

Replacement of existing traditional lighting with LED

Procurement of LED lights for all new lighting requirements

Use of solar blinkers and solar tower lights

All the above 

25. What is the target set for wastewater recycling for the financial year 2022-23 ?
(1 Point)

≥ 10 % of the total potable water used for the projects 


≥ 5 % of the total potable water used for the projects

≥ 15 % of the total potable water used for the projects

None of the above

26. As per the EHS strategy plan, RAKSHA Behavioral Training targeted to conduct
for (1 Point)

All EHS Staffs

All Project managers

All section in charges

All Employees at site. 

27. Overall satisfaction of this program

1 2 3 4 5
This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is
not responsible for the privacy or security practices of its customers, including those of this form owner. Never give
out your password.

Powered by Microsoft Forms | Privacy and cookies | Terms of use

You might also like