Professional Documents
Culture Documents
Online Assessment On HCI IC EHS Strategy 2022-2023
Online Assessment On HCI IC EHS Strategy 2022-2023
Strategy 2022-2023
1. Name
Murugesan P
2. PS NO
20064885
3. Project Name
4. Job Code
LE180425
5. Name of BU
Metros
Heavy Structures
Hydel & Tunnel
6. Cadre
TA/TC
S1-S2
O1-O2
4
8
8. As per the IC accident statistics 2021-22, ---------% Plant & Machinery related
works contributed to more accidents(1 Point)
17
31
25
8
9. As per the Accident statistics overview of FY 21-22, in under P&M works
related, which sub activity maximum Accidents are took place (Reported)?
(1 Point)
P&M Maintenance
Operator violations
Vehicle’s accident
10. As per the Safety PYRAMID, what are the Pro-active measures in the given
below?(1 Point)
Reporting of RLTI’s.
Reporting of Fatalities.
11. As per the IC Audit Analysis 2021-22, Which is the lowest scored element in
physical audit elements?(1 Point)
Work at Height
Lifting operations
Electrical safety
12. As per IC EHS Strategy plan 2022-23, which key area to be focused on high
priority?(1 Point)
Subcontractor Management
All of the above
13. What is the IC EHS Target AFR as per the IC EHS Strategic plan of FY 22-23?
(1 Point)
≤ 0.07
≤ 0.15
≤ 0.17
≤ 0.70
14. . ----------rating will be deducted for Project heads, Construction managers and
project EHS Incharge if any fatality in project (each fatality).(1 Point)
0.5
1
0.25
0.75
15. .----------rating will be deducted for Project heads, cluster EHS heads and
project EHS In charges if not achieving scoring above 85% in EHS Audits and
not closure the audit compliance within 21 days.(1 Point)
0.50
0.75
0.25
1
16. What is the weightage given on the personal KPI for the EHS Training?(1 Point)
5%
10%
15%
20%
17. What is the weightage given on the personal KPI for Incident reporting –
Notification within 1hr through App & 24 hr. and complete Investigation report
within 7 days as per IC EHS Strategic plan of FY 2022-23?(1 Point)
10%
15%
20%
25%
Ensure risk assessment and method statement available for all activities
Reporting incidents
19. What are responsibility of Project heads to implement strategic plan?(1 Point)
Define responsibility
20. As per the strategy plan, Who’s Action for 100% Digital Implementation of IB4U
inspection (*for applicable projects)(1 Point)
Admin In charge
21. Health and well-being management inspection to be conducted for site once in
------------ as per 2022-23 IC strategic plan.(1 Point)
1 Month
3 Months
6 Months
12 Months
22. Minimum --------------- nos. of trees per project has been planned in the FY
22-23 (1 Point)
200
300
400
500
Sustainability targets
Environment target
24. What shall project do towards energy conservation?(1 Point)
25. What is the target set for wastewater recycling for the financial year 2022-23 ?
(1 Point)
26. As per the EHS strategy plan, RAKSHA Behavioral Training targeted to conduct
for (1 Point)
1 2 3 4 5
This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is
not responsible for the privacy or security practices of its customers, including those of this form owner. Never give
out your password.