PLN INDONESIA POWER


UNIT PELAKSANA PEMBANGKITAN ASAM ASAM

FORM PATROL CHECK UNIT 1&2


Tanggal : 11 MEI 2024 UNIT :1
KONDISI KONDISI KONDISI KONDISI KONDISI KONDISI
EQUIPMENT 1A1 1A2 1A3 1A4 1B1 1B2 1B3 1B4 1C1 1C2 1C3 1C4
PARAMETER PENGECEKAN Satuan READY READY READY READY OPERASI OPERASI OPERASI OPERASI OPERASI OPERASI OPERASI OPERASI KETERANGAN
Kondisi Valve Manual Solar N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kondisi Valve Manual Udara Atomizing N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
VALVE
Kondisi valve pneumatic solar dan Atomizing N/AN NORMAL NORMAL ABNORMAL NORMAL ABNORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL 1A3 1B1,bantu lokal
kondisi Valve pneumatic purging N/AN NORMAL NORMAL ABNORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL 1A1,1A3 Bantu lokal
Gun Burner N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kebersihan Kelistrikan dan Instrument N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kebersihan Body peralatan N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
BURNER
LFO BURNER TEST Kondisi Baut N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kebocoran N/AN ABNORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL ada tetesan solar
Kondisi Nyala Api N/AN NORMAL ABNORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Ignitor N/AN NORMAL NORMAL NORMAL NORMAL ABNORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL 1B1 Failure di MCR
Kondisi Baut N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL ABNORMAL NORMAL NORMAL 1C2 di ikat pake kawat
IGNITOR Kondisi Swicht Ignitor N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kebersihan Kelistrikan dan Instrument N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Kebersihan Body peralatan N/AN NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
Jam Kerja Shift Operator Team Leader
08.00-16.00 B Agung Khusairi Ikhwan Malik A
Keterangan : Catatan Operator :
N Pengecekan : 15 Menit
: Normal
Running Test Semua Burner : 30 Menit
AN : Abnormal
H : High
L : Low