Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

PLN INDONESIA POWER


UNIT PELAKSANA PEMBANGKITAN ASAM ASAM

FORM PATROL CHECK UNIT 1&2


Tanggal : 10 Mei 2024 UNIT : COMMON
KONDISI
EQUIPMENT
READY
PARAMETER PENGECEKAN Satuan KETERANGAN
TANGKI BAHAN BAKAR Level BBM mm 120
Kebocoran N/AN NORMAL
PENDINGIN Pembacaan Gauge N/AN NORMAL
Level pendingin Radiator N/AN NORMAL
Kebersihan N/AN NORMAL
PELUMAS Level Oil N/AN NORMAL
TEST EMERGENCY DIESEL GENERATOR Kebocoran N/AN NORMAL
Kebersihan N/AN NORMAL
Vibrasi N/AN NORMAL
Noise N/AN NORMAL
MOTOR
Temperature Bearing N/AN NORMAL 57°C
Kondisi Baut dan Pondasi N/AN NORMAL
Kebersihan Kelistrikan dan Instrument N/AN NORMAL
Jam Kerja Shift Operator Team Leader
08.00-16.00 B Achmad Adi Prasetya Ikhwan Malik A
Keterangan : Catatan Operator :
N Pengecekan : 10 Menit
: Normal
Running Test : 15 Menit
AN : Abnormal
H : High
L : Low

You might also like