PT.

PLN INDONESIA POWER


UNIT PELAKSANA PEMBANGKITAN ASAM ASAM

FORM PATROL CHECK UNIT 1&2


Tanggal : 3 Mei 2024 UNIT : COMMON
KONDISI
EQUIPMENT PARAMETER PENGECEKAN Satuan A B KETERANGAN
OPERASI READY
Fuse N/AN NORMAL NORMAL
Selector Sv/Maintenance SERVICE SERVICE
CIRCUIT BREAKER
CB Rack IN/ Rack Out RACK IN RACK IN
Handle CB ON / OFF / TRIP ON ON
Kebocoran N/AN NORMAL NORMAL
Temperatur Inlet/Outlet N/AN NORMAL NORMAL
PENDINGIN
Pembacaan Gauge N/AN NORMAL NORMAL
Kebersihan N/AN NORMAL NORMAL
Kebocoran N/AN NORMAL NORMAL
Pembacaan Gauge N/AN NORMAL NORMAL
PELUMAS
Level Oil N/AN NORMAL NORMAL (B: 100%)
Kebersihan N/AN ABNORMAL ABNORMAL
Kondisi Valve Outlet N/AN NORMAL NORMAL
VALVE
CONTROL AIR COMPRESSOR Kondisi Valve Udara Prelube N/AN NORMAL NORMAL
Vibrasi N/AN NORMAL NORMAL
Noise N/AN NORMAL NORMAL
Temperature Bearing N/AN NORMAL NORMAL DE (A: 60°C) (B: 62°C)
MOTOR
Kondisi Baut dan Pondasi N/AN NORMAL NORMAL
Kebersihan Kelistrikan dan Instrument N/AN NORMAL NORMAL
Kebersihan Body N/AN NORMAL ABNORMAL Kotor lembab oli dan debu
Vibrasi N/AN NORMAL NORMAL
Noise N/AN NORMAL NORMAL
Temperature Bearing N/AN NORMAL NORMAL DE (A: 65°C) (B: 45°C)
PUMP Kebersihan Kelistrikan dan Instrument N/AN NORMAL NORMAL
Kebersihan Body N/AN NORMAL ABNORMAL Kotor lembab oli dan debu
Kebocoran N/AN NORMAL NORMAL
Kondisi Baut dan Pondasi N/AN NORMAL NORMAL
Jam Kerja Shift Operator Team Leader
08.00-16.00 B Achmad Adi Prasetya Ikhwan Malik A
Keterangan : Catatan Operator :
Pengecekan : 10 Menit
Running Test : 15 Menit
Catatan Operator :
N Pengecekan : 10 Menit
: Normal
Running Test : 15 Menit
AN : Abnormal
H : High
L : Low