OWNER PMC EPCC :

PHASE III UPSTREAM SURFACE FACILITIES


PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 2 OF 8

TABLE OF CONTENTS

1.0 GENERAL ................................................................................................................ 3


1.1 Purpose ...............................................................................................................................3
1.2 Objective..............................................................................................................................3
1.3 Functional Requirements .....................................................................................................3
1.4 Definitions............................................................................................................................4

2.0 SITE LOCATION AND CLIMATIC CONDITION ...................................................... 4

3.0 CODES, REGULATIONS AND STANDARDS ......................................................... 4

4.0 ASSUMPTIONS AND DATA.................................................................................... 5

5.0 CALCULATIONS...................................................................................................... 5

6.0 ATTACHMENTS....................................................................................................... 6
6.1 Chalmlite lighting software printouts.....................................................................................6
6.2 Calculation results summary ................................................................................................6
OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 3 OF 8

1.0 GENERAL

1.1 Purpose

The purpose of this calculation is to determine the number of indoor and outdoor lighting
fixtures necessary to meet required illumination levels for all designated areas.

1.2 Objective

The objective is to use Chalmlite version 4.0 lighting software to determine the number of
fixtures required for all areas. The Chalmlite printouts for representative areas are shown in
Attachment. 1

1.3 Functional Requirements

The lighting system shall provide adequate illumination to all necessary areas of the site.

The following illumination levels shall be provided:

• Outdoor Areas Roads (General Process Areas and Roads): 10 lux


• Outdoor Operational Areas/ Platforms / Walkways / Staircases: 50 lux
• Laboratory: 300 lux
• Shelter/shed: 150 lux
• LV switchgear / MCC Room: 200 lux
• Control Room: 300 lux
• Equipment Room: 200 lux
• UPS Room: 200 lux
• Battery Room: 150 lux
• Office: 200 lux
• Meeting Room: 200 lux

Outdoor process lighting fixtures are EEx-“e”, IIA/IIB, T3, IP55 min, 1x400W flood lighting,
HPSV type mounted on 10m height poles.

Shelters, platforms and tank ladders lighting fixtures are EEx- “e”, IIA/IIB, T3 IP55 min, 2
x36W fluorescent type, bracket or 3m above platform pole mounting height.

Emergency generator shelter and fire water pump station request 30 min. battery backup
2x36W fluorescent lighting fixtures.

Associated gas compressors shelter lighting fixtures are EEx-“e”, IIA/IIB, T3, IP55 min
1x150W HPSV pendant mounted type.

Indoor lighting fixtures are 2x36W fluorescent recessed mounted.

Indoor lighting fixtures for maintenance shop are 1x250W HPMV pendant mounted type.

The calculated values for representative areas are shown in Attachment 2


OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 4 OF 8

1.4 Definitions

OWNER/ COMPANY : Petro-Energy E&P Co. Ltd.


EPC CONTRACTOR/ : ASAWER Oil & Gas Co. Ltd.
PURCHASER
Engineering Sub-contractor : Litwin PEL
VENDOR/ SUPPLIER : Equipment Manufacturer and Supplier.
Shall : Indicates a mandatory requirement.
Should : Indicates a strong recommendation to comply with
the requirements of this document.

2.0 SITE LOCATION AND CLIMATIC CONDITION

The following are the site environmental design conditions:

- Site Elevation (MSL) 520 m


- Maximum Ambient Temperature 50ºC
- Minimum Ambient Temperature 13ºC
- Relative Humidity Range 14% to 68%
- Design Peak Wind Speed 135 km/hr
- Maximum Average Annual Wind Speed 12.6 km/hr
- Maximum Average Monthly Wind Speed 14.4 km/hr
- Seismic Design Criteria Zone 1, Z = 0.075
- Rainy Season Period June-October
- Average Annual Rainfall 318 mm
- Maximum Monthly Rainfall 111 mm
- The Wind Orientation NE
- Ground Temperature (-1m) 29ºC

3.0 CODES, REGULATIONS AND STANDARDS

International Electro-Technical Codes


• IEC 60529 Classification of degrees of protection provided by enclosures (IP code)
• IEC 60598-2-1 Fixed General purpose luminaries
• IEC 60598-2-5 Floodlights
• IEC 60079 Electrical apparatus for potentially explosive atmosphere

Other Codes:
• IES Lighting Handbook
OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 5 OF 8

4.0 ASSUMPTIONS AND DATA

The illumination level is considered as average illumination level on a working plane as


follows:
• 1.0m above the floor level for indoor and shelters
• Ground level for general outdoor

Maintenance factor used in calculation is 0.8.


The rooms surface reflectances for floors, walls and ceilings are as follows:
• Floor: 20%
• Walls: 50%
• Ceiling: 70% for general indoor rooms
50% for shelters

5.0 CALCULATIONS

For lighting calculations see Attachment 1 – Chalmlite printouts containing:


• Horizontal grid lux values
• Horizontal contours
• Plan view
• Report

For indoor lighting calculation the Lumen (or Zone Cavity) method is used software to
estimate the number of lamps which give the illumination level requested.

Room index (K) must be calculated


L •W
K=
( L + W ) • Hm
Where:
L = length of room
W = width of room
Hm = height of luminaire above working plane
12200 • 5480
For control room: K = = 1.99
(12200 + 5480) • 1900
The result is used in conjunction with room reflectance values to obtain a specific utilization
factor UF for the surface illuminated from the tables. For specified reflectance values and
room index result UF = 0.69

Number of luminaires:
E•A
N=
F • MF • UF
Where:
E = required average illumination level in Lux
A = area considered in m2
F = initial lamp lumens
MF = maintenance factor
OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 6 OF 8

UF = utilization factor

For control room :


E = 300 Lux
A = 66.856 m2
F = 3450 lumens for 2x36W fluorescent lighting fixture
MF = 0.8
UF = 0.69
300 • 66.856
N= = 10.5 choose number of lighting fixtures was 10 (same value result
3450 • 0.8 • 0.69
from software for an illumination level of 318 Lux – see Attachment Att.6.1.1)

For outdoor lighting calculation the Point-by-Point method is used software to estimate the
number of lamps which give the illumination level requested.

F • MF
E= • cos 3 θ
h2
Where:
E = required average illumination level in Lux
F = initial lamp lumens for angle θ
MF = maintenance factor
h = mounting height (in metres)
cos θ = angle between vertical and point where illumination value must be calculated
cosinus

For lighting below pipe rack:


F = 2500 lux for 64 degrees angle for 2x36W fluorescent fixture
MF = 0.8
h = 2.5m
cos θ = 0.438
Result for two lighting fixtures disposed at 6m between them:
2 • 2500 • 0.8
E= • 0.438 3 = 53
2. 5 2
The value is same like that result from software calculation for the same point (see
Attachment Att. 6.1.24).

6.0 ATTACHMENTS

6.1 Chalmlite lighting software printouts


6.2 Calculation results summary
OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 7 OF 8

ATTACHMENT – 6.1

Chalmlite lighting software printouts


OWNER PMC EPCC :
PHASE III UPSTREAM SURFACE FACILITIES
PROJECT – PKG-2: KEYI FPF
LIGHTING CALCULATIONS Engg. Sub-contractor

DOCUMENT NO: KE3-CAL-ELC-0908-6078 REV. : 0 PAGE 8 OF 8

ATTACHMENT – 6.2

Calculation results summary


EPCC

Engg. Sub-Contractor

DOC: KE3-CAL-ELC-0908-6078
PHASE III UPSTREAM SURFACE FACILITIES KEYI FPF PROJECT
ATTACHMENT 2 - Lighting Calculation Results Summary

Qty of
Required Designed
No. Location Type of Lighting Fixtures Lighting Remarks
Lux Level Lux Level
Fixtures
A INDOOR

1 Control Room 300 318 2 x 36W decorative, mirror optic, 10 Att. 6.1.1
fluorescent fixture
1 x 18W emergency lighting 4
equipped with 30min battery backup

2 Equipment room 200 240 2 x 36W decorative, mirror optic, 6 Att. 6.1.2
fluorescent fixture
1 x 18W emergency lighting 2
equipped with 30min battery backup

3 400V Switchgear room 200 212 2 x 36W fluorescent fixture 10 Att. 6.1.3
industrial type
1 x 18W emergency lighting 2
equipped with 30min battery backup

4 AC UPS room 200 220 2 x 36W fluorescent fixture industrial 4 Att. 6.1.4
type

5 Battery room 150 170 2 x 36W fluorescent fixture suitable 2 Att. 6.1.5
for Zone 2, IIC, T3 EEx-"e" type

6 Laboratory 300 319 2 x 36W decorative, mirror optic, 8 Att. 6.1.6


fluorescent fixture
1 x 18W emergency lighting 1
equipped with 30min battery backup

7 Office 200 440 2 x 36W decorative, mirror optic, 2 Att. 6.1.7


fluorescent fixture

8 Meeting room 200 234 2 x 36W decorative, mirror optic, 3 Att. 6.1.8
fluorescent fixture
1 x 18W emergency lighting 1
equipped with 30min battery backup

9 Prayer room 200 495 2 x 36W decorative, mirror optic, 2 Att. 6.1.9
fluorescent fixture

10 IT/Telecom 200 440 2 x 36W decorative, mirror optic, 2 Att. 6.1.10


fluorescent fixture
1 x 18W emergency lighting 1
equipped with 30min battery backup

11 Mud room 150 328 2 x 36W decorative, mirror optic, 1 Att. 6.1.11
fluorescent fixture

1 of 3
Qty of
Required Designed
No. Location Type of Lighting Fixtures Lighting Remarks
Lux Level Lux Level
Fixtures
12 Changing room & toilet 200 376 2 x 36W decorative, mirror optic, 3 Att. 6.1.12
fluorescent fixture

13 Pantry & mess 150 186 2 x 36W decorative, mirror optic, 1 Att. 6.1.13
fluorescent fixture

14 Corridor 150 169 2 x 36W decorative, mirror optic, 4 Att. 6.1.14


fluorescent fixture
1 x 18W emergency lighting 2
equipped with 30min battery backup

15 Maintenance shop 150 177 1 x 250W HPMV fixture 12 Att. 6.1.15


1 x 18W emergency lighting 2
equipped with 30min battery backup

16 Guard room 200 340 2 x 36W decorative, mirror optic, 3 Att. 6.1.16
fluorescent fixture

B OUTDOOR
1 Overall outdoor lighting 27 Att. 6.1.17

2 Tank farm area 5 - 10 20 flood light with 10m pole, SON-T 4 Att. 6.1.18
lamp 4 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type
flood light with 10m pole, SON-T 2
lamp 3 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type

3 Separators area 50 51 flood light with 10m pole, SON-T 1 Att. 6.1.19
lamp 4 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type
flood light with 10m pole, SON-T 1
lamp 3 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type

4 Inlet manifold area 50 73 flood light with 10m pole, SON-T 2 Att. 6.1.20
lamp 3 x 400W, suitable for Zone 2,
Eex- "e" type

5 Other outdoor areas flood light with 10m pole, SON-T 3+2 1. fire water
lamp 2 x 400W , suitable for Zone 2, area
IIA/IIB, T3 EEx- "e" type 2. emergency
flood light with 10m pole, SON-T generator area
lamp 4 x 400W , suitable for Zone 2, 3.flare knock
IIA/IIB, T3 EEx- "e" type out
4.heating
medium area
5. vent pit +
flare

6 Associated gas 150 147 1 x 150W SON-E fixture suitable for 14 Att. 6.1 21
compressors skids Zone 2, IIA/IIB, T3 EEx - "e" type
shelter

7 Crude oil export pumps 150 180 2 x 36W fluorescent fixture suitable 6 Att. 6.1.22
shelter for Zone 2, IIA/IIB, T3 EEx-"e" type

8 Fire water pumps 150 173 2 x 36W fluorescent fixture equipped 4 Att. 6.1.23
shelter with 30min battery backup suitable
for Zone 2, IIA/IIB, T3 EEx-"e" type

2 of 3
Qty of
Required Designed
No. Location Type of Lighting Fixtures Lighting Remarks
Lux Level Lux Level
Fixtures

9 Pipe rack 15 15 2 x 36W fluorescent fixture suitable 13 Att. 6.1.24


for Zone 2, IIA/IIB, T3 EEx-"e" type
2 x 36W fluorescent fixture equipped 3
with 30min battery backup suitable
for Zone 2, IIA/IIB, T3 EEx-"e" type

10 Car shed 150 152 2 x 36W fluorescent fixture 5 Att. 6.1.25


industrial type

11 Emergency generator 150 237 2 x 36W fluorescent fixture 4 Att. 6.1.26


shelter industrial type

12 11/0.4kV substation 2 x 36W fluorescent fixture 12


cable cellar industrial type

13 Outdoor 11/0.4kV 2 x 36W fluorescent fixture 4


substation ladders industrial type
platforms

14 Other areas / lighting 2 x 36W fluorescent fixture, suitable 14 platforms, tank


fixtures for Zone 2, IIA/IIB, T3 Eex-"e" type ladders lighting

2 x 36W fluorescent fixture 7


equipped with 30min battery backup
suitable for Zone 2, IIA/IIB, T3 EEx-
"e" type

15 Gas compressors 2 x 36W fluorescent fixture suitable 3


coolers platforms for Zone 2, IIA/IIB, T3 EEx-"e" type

16 Transformers 11/0.4kV 2 x 36W fluorescent fixture 4


shelter industrial type

17 Chemical storage 2 x 36W fluorescent fixture suitable 9 Att. 6.1.27


shade for Zone 2, IIA/IIB, T3 EEx-"e" type

18 Main / Escape gate flood light with 10m pole, SON-T 1


lamp 4 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type
flood light with 10m pole, SON-T 1
lamp 2 x 400W, suitable for Zone 2,
IIA/IIB, T3 EEx- "e" type

19 Outdoor receptacles 230V, 16A, suitable for Zone 2, IIB, 7


T3 EEx - "d" type

3 of 3