AB-QHSE-FN-021
Effective Date: 19/08/2021
LLC
Issue No. / Rev No.: 1/ 2
INTERIORS & MEP
Page:
1 of 1
CORRECTIV ACTION
PROOF FINDINGS STATUS
E ACTION DAYS
UNSAFE -
POWER TOOL IMMEDIATELY 1 DAY
- NO SENT THE
INSULATION POWER TOOL
1 - OUT OF SITE
LIKELYHOOD FOR PROPER CLOSE
OF INSULATION
ELECTRICAL BEFORE
SHOCK TO USING
OPERATOR.
REMINDER:
1. All findings are properly coordinated with respective section in-charge for their awareness with recommendations .
2. Rectification to be done within the stipulated time/period, after rectification coordinate with the designated Safety Officer
on site.
5. All reports will be submitted to top management for proper evaluation to ensure that project site are being managed and
controlled by the responsible persons.
Any clarification or inquiry, kindly coordinate with your respective HSE Officer designated at your project site or to the QHSE
Office .