2314-4005-001 Rev Na
2314-4005-001 Rev Na
KW kVAR kVA
415V SUPPLY SWITCHBOARD (MDB5030) (FOR DETAILED LOAD LIST REFER SHT-002) 172.62 114.46 207.12
INTERMITTENT
KW kVAR kVA
415V SUPPLY SWITCHBOARD (MDB5030) (FOR DETAILED LOAD LIST REFER SHT-002) 3.13 2.34 3.91
EMERGENCY
KW kVAR kVA
FOR BINDING
MEASURED
=A/B factor c P=PVC
CURRENT
RESTARTING
LOAD REMARKS
NON-ESSENT
factor c
ESSENTIAL
INTERMITTENT X=XLPE OR EPR
ITEM NO.
CONTINUOUS STAND-BY
PANEL
AND SPARES
VITAL
RATING=SITE RATING
EQUIPMENT NO. DESCRIPTION
IN IN
A B C D kW kvar E kW kvar F kW kvar G
DEC. DEC.
kW kW DES. ACT. COS DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. NO. P/X Sq.mm RATING
1 A-5044-ECP Air Compressor No1 Elect. Panel 92.8 93 1.00 0.94 0.85 98.9 61.3 4 X 95 305 @ max abs
2 A-5046-ECP Chiller Package Panel 32 37 0.86 0.84 0.80 38.1 28.6 4 X 50 197
3 A-5045-ECP Nitrogen Booster Elec Panel 20 22 0.91 0.84 0.80 23.8 17.9 4 X 16 99
4
9 50-HAC 5044 Air Conditioning Unit 2.5 3 0.83 0.70 0.70 3.6 3.6 4 X 4 44
10 M-5044-ECP Overhead Crane Unit 2.5 3 0.83 0.80 0.80 3.1 2.3 4 X 4 44
11 LCP 5044 Analyser Room Equipment 3 3 1.00 0.90 0.90 3.3 1.6 3 X 2.5 36
12
13 LDB 5004-LF1-LF20 N2 Plant Lighting & Small Power 3.88 3.88 1.00 1.00 0.96 3.9 1.1 4 X 10 78 Light cable 3c 2.5
14
15
16
17
FOR BINDING
18
19
20
21
22
23
24
25
26
Maximum of Normal Running Plant Load: 175.7 kW: 116.8 kvar SQRT(kW2+kvar2) = 211.02 KVA Power factor without compensation (cos ) 0.83
(Est. x % E + y % F) TOTAL 172.6 114.5 3.1 2.3 Power factor with compensation (cos ) :
Peak Load: 175.7 kW: 116.8 kvar SQRT(kW2+kvar2) = 211.02 KVA required capacitor rating [=kW (tg -tg )] :
E "continuous" all loads that may continuously be required for normal operation, including lighting and workshops. Note 1) For definitions of "Vital", "Essential and "Non-Essential" Services refer clause 8.2.1 of ES.2.03.0001 Electrical System Design
F "Intermittent and spares" the loads required for intermediate pumping storage, loading, etc and all electrical spares of Note 2) For peak load estimation the coincidence factors have been considered as follows : x=100%, y=50% & z=0%
G "stand-by" loads required in emergencies only such as fire-water pumps or those of normally not running electrically driven Note 3) Absorbed Load shall be : For pumps shaft load at duty point, for instrumentation/computers/commuincaition and air conditioing the required load
units on stand-by for normally running steam driven ones(e.g. charge pumps, boiler feed pumps.) during full plant operation, fotr lighting during dark hours and for workshops the average load in normal operation