1.

0 DIESEL TRANSFER PUMP (P-5096A) POWER SUPPLY FROM SW 23B10

CONTINUOUS
KW kVAR kVA

415V SUPPLY SWITCHBOARD (SW23B10) (FOR DETAILED LOAD LIST REFER SHEET 002) 2.96 1.33 3.25

INTERMITTENT
KW kVAR kVA

415V SUPPLY SWITCHBOARD (SW23B10) (FOR DETAILED LOAD LIST REFER SHEET 002) - - -

EMERGENCY
KW kVAR kVA

2.0 DIESEL DISPENSER AREA DB POWER SUPPLY FROM DB-TW (AUTO ELEC WORKSHOP)
FOR BINDING

CONTINUOUS
KW kVAR kVA

415V SUPPLY SWITCHBOARD (DBTW) (FOR DETAILED LOAD LIST REFER SHEET 003) 1.94 0.86 2.13

INTERMITTENT
KW kVAR kVA

415V SUPPLY SWITCHBOARD (DBTW) (FOR DETAILED LOAD LIST REFER SHEET 003) - - -

EMERGENCY
KW kVAR kVA

REFERENCE DRAWINGS Doha Petroleum


BC&T Consultants
ILE NAME : 2313-4005.XLS

Construction Co. Limited


Z AS-BUILT 18/05/07 SDP HM KMP Title Halul Island
B TAG Nos ADDED - AFC 07/11/06 JKL GLJ KMP New Diesel Filling Station
A APPROVED FOR CONSTRUCTION 09/10/06 JKL GLJ KMP Electrical Consumer Load Lists for New Diesel Pump (P-5096A) and Dispensers (Z-5017C/D/E)
1 ISSUED FOR APPROVAL 11/08/06 JKL GLJ KMP SCALE 1:1 ORIG. DWG SIZE : A3 REV
FILE NAME : 2313-4005.XLS

0 ISSUED FOR COMMENTS 12/07/07 JKL GLJ KMP


DWG NO. 2313-4005 Sheet 001 of 003 Z
Rev Description Date Drw Chd App App
EQUIPMENT
POWER kW = A/D CONSUMED LOAD kvar=kW.tg
LOAD EFFICIENCY
MOTOR FACTOR
FACTOR at load CABLE DETAILS
ABSORBED RATING at load

MEASURED
=A/B factor c P=PVC

CURRENT
RESTARTING
LOAD REMARKS

NON-ESSENT
factor c

ESSENTIAL
INTERMITTENT X=XLPE OR EPR
ITEM NO.
CONTINUOUS STAND-BY

PANEL
AND SPARES

VITAL
RATING=SITE RATING
EQUIPMENT NO. DESCRIPTION
IN IN
A B C D kW kvar E kW kvar F kW kvar G
DEC. DEC.

kW kW DES. ACT. COS DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. NO. P/X Sq.mm RATING

1 P5096A Diesel Transfer Pump 2.5 4 0.63 0.86 0.91 2.9 1.3 4 X 4

2 DB5093-R-LF3 Diesel Transf.Pump Lighting 0.116 0.1 1.16 0.90 0.99 0.1 0.0 3 X 2.5 Single Phase

10

11

12

13

14

15

16

17
FOR BINDING

18

19

20

21

22

23

24

25

26

Maximum of Normal Running Plant Load: 3.0 kW: 1.3 kvar SQRT(kW2+kvar2) = 3.25 KVA Power factor without compensation (cos ) 0.91

(Est. x % E + y % F) TOTAL 3.0 1.3 0.0 0.0 Power factor with compensation (cos ) :

Peak Load: 3.0 kW: 1.3 kvar SQRT(kW2+kvar2) = 3.25 KVA required capacitor rating [=kW (tg -tg )] :

(Est. x % E + y % F + z % G) Note 2 DES. 3.25 DES. 0.00


kVA (=SQRT(kW2+kvar2))
Coincidence factors x,y and z shall be defined for each separate case, subject to principal's approval. ACT. ACT.

E "continuous" all loads that may continuously be required for normal operation, including lighting and workshops. Note 1) For definitions of "Vital", "Essential and "Non-Essential" Services refer clause 8.2.1 of ES.2.03.0001 Electrical System Design

F "Intermittent and spares" the loads required for intermediate pumping storage, loading, etc and all electrical spares of Note 2) For peak load estimation the coincidence factors have been considered as follows : x=100%, y=50% & z=0%

G "stand-by" loads required in emergencies only such as fire-water pumps or those of normally not running electrically driven Note 3) Absorbed Load shall be : For pumps shaft load at duty point, for instrumentation/computers/commuincaition and air conditioing the required load

units on stand-by for normally running steam driven ones(e.g. charge pumps, boiler feed pumps.) during full plant operation, fotr lighting during dark hours and for workshops the average load in normal operation

REFERENCE DRAWINGS Doha Petroleum


BC&T Consultants
ILE NAME : 2313-4005.XLS

Construction Co. Limited


1) 2313-4035 Electrical Line Diagrams Title Halul Island
Z AS-BUILT 18/05/07 SDP HM KMP New Diesel Filling Station
A APPROVED FOR CONSTRUCTION 09/10/06 JKL GLJ KMP Electrical Consumer Load Lists for New Diesel Pump (P-5096A) and Dispensers (Z-5017C/D/E)
1 ISSUED FOR APPROVAL 11/08/06 JKL GLJ KMP SCALE 1:1 ORIG. DWG SIZE : A3 REV
FILE NAME : 2313-4005.XLS

0 ISSUED FOR COMMENTS 12/07/07 JKL GLJ KMP


DWG NO. 2313-4005 Sheet 002 of 003 Z
Rev Description Date Drw Chd App App
EQUIPMENT
POWER kW = A/D CONSUMED LOAD kvar=kW.tg
LOAD EFFICIENCY
MOTOR FACTOR
FACTOR at load CABLE DETAILS
ABSORBED RATING at load

MEASURED
=A/B factor c P=PVC

CURRENT
RESTARTING
LOAD REMARKS

NON-ESSENT
factor c

ESSENTIAL
INTERMITTENT X=XLPE OR EPR
ITEM NO.
CONTINUOUS STAND-BY

PANEL
AND SPARES

VITAL
RATING=SITE RATING
EQUIPMENT NO. DESCRIPTION
IN IN
A B C D kW kvar E kW kvar F kW kvar G
DEC. DEC.

kW kW DES. ACT. COS DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. NO. P/X Sq.mm RATING

1 Z-5017C/D/ E Diesel Dispensers - 3 off 1phase 0.4 0.55 0.73 0.60 0.70 0.7 0.7 5 X 2.5 36 Load / unit / phase

2 DB5093-5R-LF1-3 Tank T5072 Lighting 0.35 0.35 1.00 0.95 0.99 0.4 0.1 5 X 2.5 36 Single phase
DB5093-6RYB-LF4-
3 Diesel Dispenser area lighting 0.864 0.864 1.00 0.95 0.99 0.9 0.1 5 X 2.5 36 Three phase
LF17
4

10

11

12

13

14

15

16

17
FOR BINDING

18

19

20

21

22

23

24

25

26

Maximum of Normal Running Plant Load: 1.9 kW: 0.9 kvar SQRT(kW2+kvar2) = 2.13 KVA Power factor without compensation (cos ) 0.91

(Est. x % E + y % F) TOTAL 1.9 0.9 0.0 0.0 Power factor with compensation (cos ) :

Peak Load: 1.9 kW: 0.9 kvar SQRT(kW2+kvar2) = 2.13 KVA required capacitor rating [=kW (tg -tg )] :

(Est. x % E + y % F + z % G) Note 2 DES. 2.13 DES. 0.00


kVA (=SQRT(kW2+kvar2))
Coincidence factors x,y and z shall be defined for each separate case, subject to principal's approval. ACT. ACT.

E "continuous" all loads that may continuously be required for normal operation, including lighting and workshops. Note 1) For definitions of "Vital", "Essential and "Non-Essential" Services refer clause 8.2.1 of ES.2.03.0001 Electrical System Design

F "Intermittent and spares" the loads required for intermediate pumping storage, loading, etc and all electrical spares of Note 2) For peak load estimation the coincidence factors have been considered as follows : x=100%, y=50% & z=0%

G "stand-by" loads required in emergencies only such as fire-water pumps or those of normally not running electrically driven Note 3) Absorbed Load shall be : For pumps shaft load at duty point, for instrumentation/computers/commuincaition and air conditioing the required load

units on stand-by for normally running steam driven ones(e.g. charge pumps, boiler feed pumps.) during full plant operation, fotr lighting during dark hours and for workshops the average load in normal operation

REFERENCE DRAWINGS Doha Petroleum


BC&T Consultants
ILE NAME : 2313-4005.XLS

Construction Co. Limited


1) 2313-4035 Electrical Line Diagrams Z AS-BUILT 18/05/07 SDP HM KMP Title Halul Island
B TAG Nos ADDED - AFC 07/11/06 JKL GLJ KMP New Diesel Filling Station
A APPROVED FOR CONSTRUCTION 09/10/06 JKL GLJ KMP Electrical Consumer Load Lists for New Diesel Pump (P-5096A) and Dispensers (Z-5017C/D/E)
1 ISSUED FOR APPROVAL 11/08/06 JKL GLJ KMP SCALE 1:1 ORIG. DWG SIZE : A3 REV
FILE NAME : 2313-4005.XLS

0 ISSUED FOR COMMENTS 12/07/07 JKL GLJ KMP


DWG NO. 2313-4005 Sheet 003 of 003 Z
Rev Description Date Drw Chd App App

You might also like