CM WO PPM- CM WO REPORT-
FIELD PRINTOUT
EM WO PPM- EM WO REPORT-
FIELD PRINTOUT
PM CYCLE-TRIGGER
PM TASK AGAINST ASSIGNEE
PART INFORMATION- WHICH PART TO REPLACE DURING MAINTENANCE
WHO IS TO RECEIVE INFORMATION
FILES-MANUALS, PERMIT, DOCUMENTS ETC
PM HISTORY-HOW MANY TIME PM IS
HOME PAGE
HOME PAGE
Agitator's Airlock
Drive Seal's status
GP#01785
( agitator airlock is
leaking oil)
WORK DONE
ORMATION
ACTUAL WORKER 1 ACTUAL WORKER 2
ORMATION
RIME
NSTRUCTION SPARE NEEDED
NO
h new one Oil seal
40
ONE
ORMATION
START TIME STOP TIME ACTUAL TIME SPENT
ORMATION
ITEM NO QUANTITY
RESOURCE INFORMATION
PRINCIPAL ASSIGNEE ASSISTANCE 1 ASSISTAN
WORK DONE
The layer comb gearbox was discovered bad,b the actual gearbox spec was not available in store, another one from bstore w
and mounted machine ok
OBSERVATION RECOMMENDATION
PROBLEM DEFINATION
WORK ORDER
ATED BY
STAGES
mehin CLOSED
ASSISTANCE 2
OMMENDATION
2.2
QUANTITY COST
1 32586.45
₦32586.45
) (Name & Signature) DONE BY
Akinjimola
Olutimehin Samuel
Fitter
HOME PAGE
RCA REPORT
RCA Form No Reference Work Order No Asset Na
the print controller and cable was bad due to a short circuit from the
cable towards the hotmelt side and it was repaired by sourcing a used
part from the faulty printer due to no spare and it was tested okay,
RCA DETAIL
Team Leader
1. Team Member 2. Team Member
Damola Okunola Supervisor Damola Okunola
(noodles) Supervisor (noodles)
Check Conditions, Standards and Procedures
1. Is there a Standard?(If Yes, move to the next question, if No,
TRUE
move to Think Do Phase)
2. Is it being followed?(If yes, move to Think Do Phase, if No,
TRUE The printer stop work
move to Check Point below)
day shift on 23/05/
3. Have people been trained on it? TRUE ifeanyi] i the fault stop
4. Is the standard easy to understand TRUE
5. Are materials and equipment parameters in specification? (if
TRUE
applicable)
Analyse possible causes (Brainstorming/Brainwr
Man (How would Man caused it?) Machine (How would Machine caused it?
1] In experience operators.
CA REPORT
Asset Name Sub-Section
NOODLES LINE 5 PROCESS Packing Machine 17 PK17-MC
PRODUCTION FLOOR
Recommendation Downtime Incurred
CA DETAIL
TRUE
Problem Defination
The printer stop working on line 5, packaging machine 17, it happen during
day shift on 23/05/2023, the problem was reported by operator [Nkem
ifeanyi] i the fault stopped packaging machine 17 from working, the problem
lasted for 3 hrs.
es (Brainstorming/Brainwriting)
Material (How would Material techniques
would Machine caused it?)
caused it?)
1] Moisture.
2] Water.
3] Heat.
& Preventive Action
ACTIONS STATUS
chedule machine/equipment completely
iod basis.
T.
PPM ELECTRICAL 08 Nov 2023 All the spreader unit motor terminals were 1
checked ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 ll the spreader unit motor terminals were checked 0.5
ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 All the spreader unit motor terminals were 5
checked ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
* The pen-divider blower fan motors terminal were
checked ok, their cooling fan was also checked ok
and cleaned
* The pen-divider switches and pneumatic was
checked ok and cleaned
* All the screw motor isolators were checked ok
and cleaned .
* All the spreader arms motors terminal and their
cooling fan were checked ok and cleaned
* The upper and lower stick returns motor terminal
was checked ok.
*The 4 spreader vent motor terminals were
checked and blower with compressed air.
PPM ELECTRICAL 08 Nov 2023 ll the spreader unit motor terminals were checked 0.5
ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 0.5
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 The metal detector sensor cable that was found 8 CORD,
wounded was replaced, upper and lower jaw ELECTRICAL;EV
supply cable was also replaced, and upper jaw T004,PVC,250V
heating element was replaced. AC,4A,5-PIN,
M12X1,FEMAL
E,5M
PPM ELECTRICAL 08 Nov 2023 All the sealing & heating elements were replaced., 8 HOSE;SUCTION
supply cables to the element were inspected and ,ID: 10MM,L
maintained, all electrical components including 25M,PVC,01-
sensors, valves, magnetic switches and safety 50-2630
switches were maintained. All motor terminals,
panel and panel devices were inspected and
maintained.
PPM ELECTRICAL 08 Nov 2023 The isolator switches, motor terminals, fan covers, 1
and mounting position were inspected and
maintained.
PPM MECHANICA 08 Nov 2023 The chain was inspected and cleaned, all the 2
L buckets were equally inspected and cleaned.
Maintenance was thoroughly maintained
according to the work instruction.
PPM ELECTRICAL 08 Nov 2023 Screw motor terminal, cable isolator and switches 1
were inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All the screw 1,2,3,4 motor terminals were all 1
checked and cleaned ok. * The
semolina calling sensor, semolina alarm sensor, the
scrap recycling sensor were all checked and
cleaned ok. * The press control
panel was cleaned ok.
PPM ELECTRICAL 08 Nov 2023 Motor terminals, mounting position, isolators and 0.5
supply cable condition were checked and
maintained.
PPM ELECTRICAL 08 Nov 2023 The water delivery unit was inspected, and flow 1
meter was cleaned.
PPM ELECTRICAL 08 Nov 2023 Bad hot air element was replaced, wounded feeder 9
sensor cable and weigher 1 knife zero sensor cable
were replaced.
PPM MECHANICA 08 Nov 2023 The hot air element was replaced, maintenance 10
L was carried out om the jaw as the worn-out Teflon
tape was replaced, and jaw was aligned ok.
PPM MECHANICA 08 Nov 2023 Unit was properly maintained according to the 10 BEARING,
L work instruction. BALL, LINEAR
horizontal sealing jaw bearing, and shaft were MOTION;KH25
replaced, bundle pusher and bundle lifter unit 40,25MM
were maintained as work loose bolt was properly BORE,COMPAC
retightened. T
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 4.5
inspected, and junction box were maintained.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 1.5
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 0.5
inspected and maintained.
Impulse filter unit and air gauges were inspected
and maintained.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 1
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 blower terminals and pressure gauges were 0.5
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 1
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 0.5
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All the motor terminals, isolators, control panel, 1
calling sensor were inspected and maintained.
Maintenance was thoroughly maintained
according to the work instruction.
PPM MECHANICA 08 Nov 2023 maintenance was carried out accordingly, belt and 11 BEARING,
L bearing were replaced. BALL, LINEAR
MOTION;HGW
15CCC 01891-
3,FLANGE UNIT
PPM MECHANICA 08 Nov 2023 Inspection and maintenance was carried out, knife 1
L was aligned ok.
PPM ELECTRICAL 08 Nov 2023 Maintenance was carried out on the chain, 2
cylinders, sensors and switches were maintained.
PPM ELECTRICAL 08 Nov 2023 Motor terminals, mounting position, isolators and 0.5
supply cable condition were checked and
maintained.
blasting valve were inspected and cleaned. and no
hose leakage was observed.
PPM ELECTRICAL 08 Nov 2023 Motor terminals, mounting position, isolators and 0.5
supply cable condition were checked and
maintained.
PPM MECHANICA 08 Nov 2023 All unit was maintained according to the work 6
L instructions..
PPM ELECTRICAL 08 Nov 2023 thorough maintenance was carried out on the 0.5
machine according to the work instruction.
PPM ELECTRICAL 08 Nov 2023 Motor terminals, mounting position, isolators and 1
supply cable condition were checked and
maintained.
PPM ELECTRICAL 08 Nov 2023 All ventilation motors were inspected and 1
maintained.
unit was inspected and maintained.
PPM UTILITY 08 Nov 2023 The cooler was properly inspected and washed 1
with compressed water.
PPM UTILITY 08 Nov 2023 The panel A/C was inspected appropriately for 1
leakages, cleaned and the cooling effect was
confirmed ok.
PPM MECHANICA 08 Nov 2023 maintenance was properly carried out according to 3.5
L the work instruction.
PPM MECHANICA 08 Nov 2023 The crusher was inspected and the leakage at the 2 SEAL,
L gearbox was arrested by replacing the collapsed oil OIL;50/85/10,R
seal, oil was gauged with Kluber 320 gear oil 4.5 lts. ADIAL
slack screw gear chain was inspected and re- SHAFT,ID
tensioned, chains and bearings were cleaned and 50MM,OD
lubricated. 85MM,W
10MM
PPM MECHANICA 08 Nov 2023 All unit were inspected and routine maintenance 4
L was carried out according to the work instructions.
PPM MECHANICA 08 Nov 2023 routine maintenance was carried out according to 2
L the work instructions.
PPM MECHANICA 08 Nov 2023 Floor 1,4,5, and 7 loading levers were inspected 4
L and calibrated.
Floor 1&7 lever was found to have bent which was
straightened and calibrated ok.
Routine maintenance was carried out according to
the work instructions.
PPM MECHANICA 08 Nov 2023 Floors 6,7 and 5 were inspected and the phase was 3
L set, the levers of floor 7 were calibrated, routine
maintenance was carried out according to the
work instructions.
PPM MECHANICA 08 Nov 2023 The machine section was inspected, and routine 14
L maintenance was carried out according to the
work instructions.
PPM MECHANICA 08 Nov 2023 All unit were inspected, and routine maintenance 1
L was carried out according to the work instructions.
PPM MECHANICA 08 Nov 2023 All unit were inspected, and routine maintenance 3
L was carried out according to the work instructions.
Bad bushing was replaced.
PPM MECHANICA 08 Nov 2023 All unit were inspected, and routine maintenance 1
L was carried out according to the work instructions.
PPM MECHANICA 08 Nov 2023 All unit were inspected, and routine maintenance 8 BEARING,
L was carried out according to the work instructions. BALL;62205-
The bearing support plate which were bad was 2RS1,DEEP
removed and fabricated. GROOVE,25M
Bearing 2205 TN9 1pcs and 62205 2rs 2pcs were M,52MM,18M
replaced. M
PPM MECHANICA 08 Nov 2023 Inspection and diligent maintenance were carried 7
L out on the section according to the work
instructions.
PPM MECHANICA 08 Nov 2023 Inspection and diligent maintenance were carried 4
L out on the section according to the work
instructions.
PPM MECHANICA 08 Nov 2023 All the bearings and chains were inspected and 3
L maintained
PPM MECHANICA 08 Nov 2023 Inspection and diligent maintenance were carried 3
L out on the section according to the work
instructions.
All flexible hose, slides, stainless strip plate and
rack were inspected and maintained.
PPM MECHANICA 08 Nov 2023 Dryer front coupling shaft removed and the gear, 2
L oil seal and bearings were replaced.
the stainless strip plate inspected ok, all slides and
lever were inspected and maintained. Door gasket
was replaced with silicon.
Maintenance was carried out according to the
work instructions.
PPM MECHANICA 08 Nov 2023 Pen divider was inspected, and maintenance was 1
L carried out according to the work instructions.
PPM MECHANICA 08 Nov 2023 The worn-out vertical dryer central shaft was 11
L machined, and new keyway created.
the horizontal shaft coupling was replaced the
crocodile chain was replaced accordingly.
all slides were inspected and cleaned, the eccentric
shaft roller was cleaned and lubricated with
starburag grease. All other maintenance was
carried out as guided by the work instruction.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 1
L work instructions.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 1
L work instructions.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 1
L work instructions.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 0.5
L work instruction.
PPM MECHANICA 08 Nov 2023 Upper cutter was inspected, and maintenance was 1
L carried out according to the work instructions.
PPM MECHANICA 08 Nov 2023 The blower unit, redresser and pipes were 3
L inspected and properly maintained; blower pot
was cleaned.
Maintenance was carried out according to the
work instructions.
PPM MECHANICA 08 Nov 2023 Impulse filters were replaced, door gasket was 1 FILTER,BAG;SL
L inspected and cleaned. EEVE,D
Maintenance was carried out according to the 200MM,L
work instructions. 3000MM
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 8
L work instructions.
PPM MECHANICA 08 Nov 2023 Screw 4 oil was topped with screw gearbox oil, no 3
L wear or crack was observed.
Maintenance was carried out according to the
work instruction.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 2
L work instruction.
all valves were inspected and maintained.
PPM MECHANICA 08 Nov 2023 The gate glass was maintained, all bolts were 1
L replaced, and self-adhesion gasket was fixed to
position.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 1
L work instruction.
PPM MECHANICA 08 Nov 2023 The internal conveyor roller shaft was maintained, 0.5
L worn out shaft was removed and machined, work
loosed bolts at the LHS distributor chain rail were
retightened.
Maintenance was carried out according to the
work instruction.
PPM ELECTRICAL 08 Nov 2023 The regrind motor was checked for missing fan and 1
fan cover, cleaned ok.
* The redresser 1,2and 3 motors and its switches
were checked and cleaned ok.
The entoleter motor fan/fan cover were checked,
the terminals were checked ok, the isolator was
checked and cleaned ok The the
blower motor terminals were inspected and
maintained.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 0.5
L work instruction.
all belts were inspected and maintained.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 0.5
L work instruction.
blockages were cleaned out.
PPM MECHANICA 08 Nov 2023 Blower was cleaned with compressed air, belts, 2
L filter were inspected and maintained.
PPM MECHANICA 08 Nov 2023 Maintenance was carried out according to the 3
L work instruction.
Impulse filter sleeves were replaced., solenoid
valves and blasting valve were inspected and
maintained.
PPM ELECTRICAL 08 Nov 2023 All ventilation motors was jogged for bearing 6 MOTOR,
issues, M865 & M868 has bad bearing, they were ELECTRIC;5BES
removed and replaced with repaired motor 100LA/4 IM
collected from store.(PO14962) 2pcs. B5,1.65
The motor was mounted back and direction KW,1450 RPM
confirmed ok.
* All air eject motor jogged for bearing issues ok.
* The line movement motor terminal was checked
for work loose or burnt cable ok.
* All the pre-dryer sensors was checked for work
loose ok and was cleaned with rag.
PPM ELECTRICAL 08 Nov 2023 ll cooler ventilation motors was jogged for bearing 1
issues, all ok.
* The line movement motor terminal was checked
for work loose ok.
* The sensors was checked for work loose and the
switches was also checked for any work loose ok.
PPM MECHANICA 08 Nov 2023 All electrical parts, switches, sensors, motors were 7
L inspected and maintained accordingly.
PPM ELECTRICAL 08 Nov 2023 All ventilation motors was jogged for bearing 6
issues, M992 was having bad bearing, it was
removed and replaced with new motor collected
from store mounted back and direction confirmed
ok,(PO14972) 1pc.
* All the sensors and switches was checked for
work loose and was checked for acknowledgement
ok they are all cleaned with rag.
* Dryer command motor terminal was checked for
work loose or burnt cable ok.
PPM ELECTRICAL 08 Nov 2023 The electric motor terminals, sensors, isolators, 1
were inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All the spreader unit motor terminals were 1
checked ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 All motor terminals, sensors and switches were 2
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All the pneumatic cylinder of loading silo was 2
checked for air leakages ok and was checked for
magnetic sensor mispositioned all ok.
All motor terminals, sensors and switches were
inspected and maintained.
PPM ELECTRICAL 08 Nov 2023 All the spreader unit motor terminals were 0.5
checked ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 The pen-divider blower fan motors terminal were 1.5
checked ok, their cooling fan was also checked ok
and cleaned
* The pen-divider switches and pneumatic was
checked ok and cleaned
All the spreader arms motors terminal and their
cooling fan were checked ok and cleaned
* The upper and lower stick returns motor terminal
was checked ok.
PPM ELECTRICAL 08 Nov 2023 All the spreader unit motor terminals were 0.5
checked ok.
* All the spreader sensors was checked ok and
cleaned.
* All the spreader motor isolators were checked ok
and cleaned.
PPM ELECTRICAL 08 Nov 2023 All the pneumatic cylinder of loading silo was 2
checked for air leakages ok and was checked for
magnetic sensor mispositioned all ok.
QUAN PRINCIPAL ASSIGNEE
TITY TOTAL COST OF SPARE USED
USED
Monilari Samson
Opeyemi Electrician
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Emmanuel Egualese
Electrician
Edidiong Sylvanus
Electrician
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
Emmanuel Egualese
Electrician
Iroegbulam Emmanuel
Electrician
Iroegbulam Emmanuel
Electrician
Iroegbulam Emmanuel
Electrician
Jam Patrick Electrician
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
4 Adekanye Francis Fitter
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
Monilari Samson
Opeyemi Electrician
OLAYIWOLA MUIDEEN
JIMOH ELECTRICIAN
Shadrach Ogege
Shadrach Ogege
Shadrach Ogege
₦ 2,032,933.00
Shadrach Ogege
Shadrach Ogege
Ogege Shadrach Fitter
Shadrach Ogege
23 Shadrach Ogege
Shadrach Ogege
Shadrach Ogege
Monilari Samson
Opeyemi Electrician
Taiwo Oluwafunsho Fitter
2 Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Omoremi kayode
Supervisor
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Emmanuel Egualese
Electrician
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
Monilari Samson
Opeyemi Electrician
SHIFT SHIFT B
Fava Long Goods Production Line 4 Flg 4 Stripper Transmission Guide Unit
12/07/2023 7:49 FMN-GP--2023-12-07-00199
Fava Long Goods Production Line 2 Flg 2 Spreader Main Chain Assembly
12/07/2023 6:01 Unit FMN-GP--2023-12-07-00195
SHIFT SHIFT C
Fava Long Goods Production Line 2 Flg2-Pk -2 Shrink-Warp Mc Fava Long
12/06/2023 17:56 Goods Production Line 2 FMN-GP--2023-12-06-00192
Fava Long Goods Production Line 3 Flg3-Stripper Crusher Unit Fava Long
12/06/2023 16:27 Goods Production Line 3 FMN-GP--2023-12-06-00077
Francis
Francis
T REPORT HOME PAGE
external stripper start lever fault the broken external start lever has been welded and fixed back to p
FMN-GP--2023-12-07-00199 MECHANICAL production continue
internal stripper knife fault the broken knife was replaced and the line back to production
FMN-GP--2023-12-07-00198 MECHANICAL
paddle and pusher fault the pusher bolt M8x85 was replaced and line back to production
FMN-GP--2023-12-07-00197 MECHANICAL
conveyor bucket fault the broken bucket was replaced with another one ok
FMN-GP--2023-12-07-00196 MECHANICAL
spreader main chain with nib RHS alarm the right hand level was adjusted and the sensor was checked okay
FMN-GP--2023-12-07-00195 MECHANICAL
infeed conveyor belt fault cut take out conveyor toothed belt was replaced with new one from
FMN-GP--2023-12-06-00192 MECHANICAL
paddle misalignment Paddle alignment was properly set and discharge phase CAM was
FMN-GP--2023-12-06-00191 MECHANICAL
film drive fault the encoder alarm resolved after several resetting and using air hos
FMN-GP--2023-12-06-00121 ELECTRICAL down panel as the machine AC is not working. new drive have been
should incase the problem persist.
shuter fault the shutter was calibrated and product phase parameters was adjus
FMN-GP--2023-12-06-00118 MECHANICAL machine to run
take out conveyor fault After observation we discover take out conveyor have hooked, we d
FMN-GP--2023-12-06-00117 MECHANICAL conveyor and discover one roller have work loose which course obs
was rectify. the unit was fix back and aligned.
take out conveyor bad belt was lacing, burn gearbox and motor, fuse, breaker are all r
FMN-GP--2023-12-06-00080 MECHANICAL protect the motor
crusher blockage there was hip of material inside the cyclume, the material were clea
FMN-GP--2023-12-06-00077 MECHANICAL the sucking. the accessories were fix back.
metal Detector fault to rest the metal Detector the blind screen was changed with anothe
FMN-GP--2023-12-06-00076 MECHANICAL removed from unused one, machine work fine after then.
JOB STATUS TOTAL
WORK DONE DONE BY PART U
DOWNTIME(hrs)
t lever has been welded and fixed back to position , Yusuff Ayuba Fitter
CLOSED 0.5
placed and the line back to production Yusuff Ayuba Fitter P014091 DISC, CUTTING;5LS12061
CLOSED 1.35
adjusted and the sensor was checked okay Yusuff Ayuba Fitter
CLOSED 0.25
othed belt was replaced with new one from store Adekanye Francis Fitter P013505 BELT, TOOTHED;AT5/390-
CLOSED 0.1 SPIG01
roperly set and discharge phase CAM was position too. Adekanye Francis Fitter
CLOSED 0.4
ved after several resetting and using air hose to cool Oyedokun Peter Electrician P015589 Drive SP 1404 Unidrive-FM
hine AC is not working. new drive have been signed out CLOSED 1.2
em persist.
ed and product phase parameters was adjusted for Adekanye Francis Fitter
CLOSED 0.4
cover take out conveyor have hooked, we drop the Adekanye Francis Fitter
one roller have work loose which course obstruction, it CLOSED 2
fix back and aligned.
n gearbox and motor, fuse, breaker are all replaced to Oyedokun Peter Electrician P017439 REDUCER GEAR;VF 30 P1
CLOSED 1.4 SPIG01
l inside the cyclume, the material were clean to enable Eboh Ojonemmi Anthony Fitter
ories were fix back. CLOSED 0.3
or the blind screen was changed with another screen Oyedokun Peter Electrician
ne, machine work fine after then. CLOSED 0.4
KEY NOTE
KEY NOTE
Page 1 of 1
UNIT TOTAL
PART USED QTY COST
COST
9.16
SUM OF DT INCUR
2402880.75
COST OF ITEM USED
WORK REQUEST REPORT
Production 120
Grand Total 1078
#REF!
% RAISED BY MAINTENANCE
#REF!
DAILY CHECKLIST SUMMISSION REPORT
DAILY CHECKLIST SUMMISSION REPORT
TOTAL
WOR %
HOME
Months
K
Total Submitted TOTAL REPORT RECEIVED
REQU
PAGE
435 EST
Jan GENE
1/6/2023 2 RATE
D
Feb Generate Work Request
FROM
2/6/2023 8 DCL #REF!
Mar 40 Total
Apr 67 81
Most findings are repeated; hence, % converted to Work Order is Low
May 117
Jun 106
WORK ORDER MANAGEMENT REPORT
Month Name REACTIVENESS TREND
(blank) 65%
Grand Total 62%
176
MONTHLY BREAKDOWN PER SECTION FOR DASHBOARD 1
PACKING AND PROCESS LINES
FVLG 1 PK_1_SHRINK
HUMIDIFIER
PK_6_SHRINK
PK_7_SHRINK
CONVEYOR_
PK_4_SHRINK
LOADER_2
LOADER_1
COOKER
REDRESSER
(empty)
PK_8
NEW SILO 1
CHARGING_COMPRESS
ROTARY SIEVE
PENNAUT
PRE-DRYER SHAKER
PLANSIFTER
NEW SILO 5
CHARGING_COMPRESS
NEW SILO REGRIND
OLD SILO REGRIND
LOADER_4
WEEKLY BD MONTHLY BD BD COMPARISON TOP BREAKDOWNS
S LINE BD FRQ.
FREQUENCY.
302
255
240
221
193
168
156
148
144
122
105
97
96
84
82
80
75
G MACHINE BD FRQ.
67
66
56
55
54
42
33
32
26
23
14
14
14
11
9
7
7
4
4
4
3
3
3
3
3
2
2
2
OP BREAKDOWNS PERFORMANCE
HOME
MAINTENANCE COST PER MONTHS MAINTENANCE COST PER ASSET MAINTENANCE COST PER ASSET SUBGROUP
PAGE
Month Name MAINTENANCE COST COST(₦/TON) LINES MAINTENANCE COST MAINTENANCE COST(₦/TON) SUBGROUP CODE MAINTENANCE COST
May ₦143,688,332.63 ₦9,320.33 PVLG 1 ₦100,443,260.80 ₦354.54 SHARED ₦72,568,356.04
June ₦105,960,965.80 ₦7,185.88 FVLG 2 ₦86,727,685.66 ₦306.13 FVLG 2-SPREADER ₦35,558,390.69
July ₦66,270,429.15 ₦5,869.88 PVSG ₦85,437,077.20 ₦301.57 FVLG 4-SPREADER ₦31,762,995.00
August ₦180,334,480.82 ₦12,442.90 FVLG 3 ₦79,010,307.92 ₦278.89 STEAM BOILER ₦31,463,055.43
September ₦61,881,435.05 ₦4,364.30 FVLG 4 ₦69,406,892.76 ₦244.99 PVSG-PRESS ₦29,690,996.41
October ₦117,610,744.90 ₦8,007.76 FVLG 1 ₦61,159,516.24 ₦215.88 FVLG 1-PRESS ₦29,640,632.59
UTILITY ₦56,077,099.78 ₦197.94 PVSG-PK-2 ₦23,793,661.26
COUSC ₦27,259,369.75 ₦96.22 PVLG 1-PRE-DRYER ₦23,498,764.35
PVLG 2 ₦4,983,734.97 ₦17.59 COUS-PK-1 ₦18,294,522.10
Total ₦825,611,747.78 ₦2,914.22 FVLG 2-PK-2 ₦17,981,589.09
FVLG 3-PK-6 ₦16,482,519.56
PVLG 1-LINE ₦16,155,306.60
PVLG 1-PRESS ₦14,517,228.89
PVSG-PK-3 ₦13,289,853.85
FVLG 3-DRYER ₦12,865,636.70
PVSG-PK-1 ₦12,714,793.92
FVLG 3-LINE ₦11,975,823.08
Open in Power BI FVLG 3-PRESS ₦11,831,974.07
2023
NO OF NO OF
PASTA 1 PASTA 2
Bagco Pasta
Sum Vol Sum Target MW/DAY LINES LINES
KWH/Ton KWH/Ton
MORNING MORNING
SHIFT SHIFT
NO OF NO OF
NOODLES NOODLES
Noodles
Sum Vol Target MW/DAY LINES LINES
KWH/Ton
(MORNING (NIGHT
SHIFT) SHIFT)
119.98 104.74
Nov-23
Bagco & Pasta KWH/ton
800.0
700.0
NO OF NO OF
PASTA 1 PASTA 2 600.0
LINES LINES
NIGHT NIGHT 500.0
SHIFT SHIFT
400.0
KW/KWH
300.0
2 5 200.0
2 3 100.0
2 5
0.0
1 5
23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
1 5 ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ e c/
N N N N N /N /N /N /N /N /N /N /N /N /N D
1/ 3/ 5/ 7/ 9/ 11 13 15 17 19 21 23 25 27 29 1/
2 4
2 5
Bagco KWH/Ton Pasta KWH/Ton Target
2 5
2 5
1 5
2 4
2 5
2 4
2 5
2 5
2 4
2 5
2 4
1 4
2 5
2 4
2 4
2 4
2 4
0 0
0 0
0 0
0 0
0 0
0 0
0 0
44 108
500.0
400.0
300.0
KW/KWH
200.0
100.0
0.0
23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ e c/
N N N N N /N /N /N /N /N /N /N /N /N /N D
1/ 3/ 5/ 7/ 9/ 11 13 15 17 19 21 23 25 27 29 1/
3.00
2.00
1.00
0.00
23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 2
ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
3 23 23 23 23 1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 10/ 11/ 12/ 13/ 14/ 15/ 16/ 17/ 18/ 19/ 20/ 21/ 22/ 23/ 24/ 25/ 26/ 27/ 28/ 29/
ov/ ov/ ov/ e c/
/N /N /N D
25 27 29 1/ MW/DAY NO OF PASTA 1 LINES MORNIN
NO OF PASTA 2 LINES MORNING SHIFT NO OF PASTA 1 LINES NIGHT S
Target NO OF PASTA 2 LINES NIGHT SHIFT
23 Noodles MW/dayNov-23
1.9
1.7
1.5
1.3
1.1
0.9
MW
0.7
0.5
0.3
0.1
-0.1
23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
3 23 23 23 v/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ec/
/2 v/ v/ c/
o
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N D
ov o o De 1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 10/ 11/ 12/ 13/ 14/ 15/ 16/ 17/ 18/ 19/ 20/ 21/ 22/ 23/ 24/ 25/ 26/ 27/ 28/ 29/ 30/ 1/ 2
/N /N 1/
27 29
3
NO OF LINES
0
3 3 3 3 3 3 3 3 3 3 3 3 3 3
/2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2
ov Nov Nov Nov Nov Nov Nov Nov Nov Nov Nov Nov Dec Dec
/ / / / / / / / / / / / /
20 21 22 23 24 25 26 27 28 29 30 1 2
NO OF PASTA 1 LINES MORNING SHIFT
NO OF PASTA 1 LINES NIGHT SHIFT
v-23
7
5
NO OF LINES
0
3 3 3 3 3 3 3 3 3 3 3 3
/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 c/2 c/2
o o o o o o o o o e e
/N 3/N 4/N 5/N 6/N 7/N 8/N 9/N 0/N 1/D 2/D
2 2 2 2 2 2 2 3
OILERS 2023
Nov/23
2023
BOILERS
119.98 83.65
Volume
No of lines No of lines Corrector
No of boilers Remarks
(Morning) (Night) Time
Taken
3 7 7 8:00
3 6 5 8:00 Bagco supplied only one WHR point for
morning shift. We
Bagco supplied only ran sixto
one totwo
fiveWHR
lines for
3 7 7 8:00 todays shift
point
Bagcofor night shift.
supplied two to one WHR point,
4 7 6 8:00
we
We ran steam boiler and
ran steam boiler ran seven
for todays shiftto six
4 6 6 8:00 lines for today's shift
4 7 6 8:00 We ran seven to six lines for today's shift
4 7 7 8:00 We ran seven to six lines for today's shift
4 7 7 8:00 Bagco supplied one to two WHR point for
morning, and close
Bagco supplied twoout withWHR
to one one point
WHR for for
3 7 7 8:00 night shift. We also ran steam boiler for
today's shift
3 6 6 8:00 today's shift.
4 6 6 8:00 We ran steam boiler and three SHW
boiler
We ranfor today's
steam shiftand three SHW
boiler
4 7 7 8:00
boiler
Bagco for today's
supplied oneshift
to two WHR point,
4 7 6 8:00
we
We ran steam boiler and
ran steam boiler and three
three SHW
SHW
4 7 7 8:00 boiler, andtoday's
seven shift
to six lines for today's
boiler
Bagco for
supplied one to three WHR point
2 5 7 8:00 shift
for morning, and close out
Bagco supplied two to one WHR point with one WHRfor
2 5 6 8:00 for night shift. We ran five to seven lines
morning
Bagco shift
supplied and close out with three
one to two WHR point for to
2 6 7 8:00 for
one today's
WHR shift.
for night shift. We ran five to six
morning
We ran shift and close
linesout
forwith three to
1 7 6 8:00 lines
two WHRforseven
today'sto shift.
for night
six today's
shift. We ran six to
shift.
1 7 5 8:00 We
sevenranlines
sevenforto five lines
today's for today's
shift.
shift.
Bagco supplied three to one WHR point
2 6 7 8:00
for
Wemorning,
ran five toand sixclose
lines out with three
for today's shift.
2 5 6 8:00 WHR for night shift. We ran sixto seven
2 6 6 8:00 Bagcofor
lines supplied
today'sonly
shift.two WHR point for
morning shift. two to one WHR point for
Bagco supplied
2 6 6 8:00
today's shift
2 7 6 8:00
2 0 0 0:00
0 0 0 0:00
0 0 0 0:00
0 0 0 0:00
0 0 0 0:00
0 0 0 0:00
0 0 0 0:00
No of lines No of lines
No of boilers Remarks
(Morning) (Night)
L/ton
SCM/ton
Vol (diesel) Target
'22
'22
Nov-23
IG Noodles Daily SCM/ton
L/ton 300.00
SCM/ton
Vol (diesel) Target
'22
'22
250.00
200.00
159.1 102.2 0.0 105
169.4 93.7 0.0 105 150.00
Scm/ton
170.3 95.1 0.0 105
115.8 124.3 0.0 105 100.00
700.00
600.00
500.00
400.00
Volume
300.00
200.00
100.00
0.00
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 v/2 c/2 c/2
o o o o o o o o o o o o o o o o e e
/N 6/N 7/N 8/N 9/N 0/N 1/N 2/N 3/N 4/N 5/N 6/N 7/N 8/N 9/N 0/N 1/D 2/D
1 1 1 1 2 2 2 2 2 2 2 2 2 2 3
Target SCM/ton '22 L/ton (diesel) '23
Vol Flour input
Nov-23
Daily SCM/ton Average Scm/ton = 66.1
400.00
350.00
300.00
250.00
200.00
Volume
150.00
100.00
50.00
0.00
23 23 23 23 23 23 23 23 23 23 23 23
ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ ov/ e c/
/N /N /N /N /N /N /N /N /N /N D
11 13 15 17 19 21 23 25 27 29 1/
NB
THERE MIGHT BE NEED TO DIVE DEEPER THROUGH FROM
EACH DASHBOARD
MONTHLY METRIC TRACKER MAINTENANC
MAINTENANCE COST
WORK ORDER MANAGEMENT