Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE

1. TIMBER GRADE SHALL BE SC4/C24


UNLESS OTHERWISED STATED.

2. ALL STEEL TO BE GRADE 43A.


3. SITE CONDITIONS SHALL ALLOW DESIGN
ASSUMPTIONS MADE IN ACCORDANCE
WITH BS5975-1996.

4.ALL DEMENSIONS IN MILLIMETER UNLESS


OTHERWISE NOTED.

5. CONCRETE POUR RATE TO BE 0.8m/hr.

- FIRST ISSUE 06-08-2021 LCY TP


REV. DESCRIPTION DATE BY APP

TSEUNG KWAN O -LAM TIN TUNNEL -


MAIN TUNNEL AND ASSOCIATED WORKS

Falsework & Formwork Arrangement


for Wing Slab at Abutment L1A

SHEET 1 OF 1

SUBCONTRACTOR / SUBCONSULTANT

DRG. NO. REV.


H2645/C/TKO/TC/T11/L1A _
CONTRACT NO. DATE OF ISSUE
NE/2015/01 06-08-2021
CHECKED BY DRAWN BY
TP
LCY
SCALE STATUS
NTS FOR SUBMISSION
DIMENSIONS ARE IN PAPER SIZE
MINIMETRES A3

You might also like