Cocn04924usa22 Rev0 MP02-001 - SN#5849-3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CERTIFIED BY BUREAU VERITAS NORTH AMERICA Inc.

In accordance with Standard DNV-ST-E271, 2.7-1 Offshore Containers,


January 2021, Amended October 2021 requirements

CERTIFICATE OF CONFORMITY
N°: COCN04924USA22, REV. 0
BV Ref. N°: 18321-102046.01

Issued within the scope of Bureau Veritas General Conditions of Service,


by BUREAU VERITAS NORTH AMERICA

Equipment Serial N°: 5849-3

Descriptions: MUD PUMP SKID ASSEMBLY

Assembly N°: MP02-001 REV 0

Manufacturer: MITEY TITAN Industries Inc.


3051-84 Ave NW, Edmonton AB T6P 1K1 Canada

Client: Thien Nam Offshore Services (TOS)

Operation Limitations:

Description Units Description Units


Max. Gross Weight: 6000 kg Design Temperature Range: 0 °C
Tare Mass: 3650 kg Max. Sling Angles with Vertical: 45°
Payload: 2350 kg Forklift Pockets Distance: N/A
Min. Test Load, All Point Lifting: 15000 kg Shackle WLL: 6.5 t
Min. Test Load, 2 Point Lifting: 9000 kg Shackle Nominal Bolt Diameter: 25 mm
Min. Test Load, Vertical Impact Test: 6000 kg Skid External Dimensions (L x W x H): 1982 x 1982 x 1944 mm

The above described supply has been surveyed by BUREAU VERITAS based on the tests/inspections set forth in the following
document: The supply was found to be in general accordance with the terms of the following document and therein detailed
conditions:

IRC N° Rev Assembly ID Description Date


IRCN04320USA22 0 MP02-001 REV 0 MUD PUMP SKID ASSEMBLY January 31, 2022

The following activities were performed with satisfactory results:


 Reviewed of general arrangement drawing(s)
 Reviewed of material documentation
 Reviewed report on traceability of materials
 Reviewed of welding procedure specifications (WPS)
 Reviewed report from manufacturing inspection
 Reviewed report from dimensional control
 Reviewed report from non-destructive examination (NDT)
 Witnessed production testing
 Reviewed report from production testing
 Visual inspection of offshore container
 Reviewed report from final inspection
 Visual inspection for plating and marking
 Visual inspection of lifting set
 Issued Bureau Veritas offshore container certificate

The latest published General Conditions of Service of Bureau Veritas are applicable Page 1 of 2
Any person not a party to the contract pursuant to which this document is delivered may not assert a claim against Bureau Veritas for any liability arising out of errors
or omissions which may be contained in said document, or for errors of judgment, fault or negligence committed by personnel of the society or its agents in the
establishment or issuance of this document, and in connection with any activities for which it may provide.
CERTIFIED BY BUREAU VERITAS NORTH AMERICA Inc.
In accordance with Standard DNV-ST-E271, 2.7-1 Offshore Containers,
January 2021, Amended October 2021 requirements

CERTIFICATE OF CONFORMITY
N°: COCN04924USA22, REV. 0
BV Ref. N°: 18321-102046.01

Issued within the scope of Bureau Veritas General Conditions of Service,


by BUREAU VERITAS NORTH AMERICA

This offshore container, or another offshore container from the same fabrication series, has been subjected to the following proof
test:

Manufacturer’s serial No. of offshore container(s) tested Test Load (2.5 x R) Test Date
5901-3 15000 kg February 15, 2022

As a result, the undersigned considers that, at the time of surveys, the above equipment was found to conform to the
requirements of the above IRC. Consequently, this certificate is considered to contribute towards a duty holder’s obligations for
the verification of the equipment’s design and manufacture under the requirements of the following regulations and/or associated
guidelines:
 DNV Standard DNV-ST-E271, 2.7-1 Offshore Containers, January 2021, Amended October 2021
 IMO MSC/Circ.860 (1998)
 SI-913 (1996) Offshore Installations and Wells, (Design and Construction) Regulations

Remarks:
 This offshore container shall be lifted or handled only when the ambient temperature is 0 °C or above.
 Marking: ONLY TO BE USED IN TEMPERATE CLIMATES
 Due date for first periodic examination: April 19, 2023

Issued at Houston Prepared by: Reviewed by:


April 20, 2022 Sergio Pereira Grant Pettit
Principal Engineer Director of Operations, Engineering

The latest published General Conditions of Service of Bureau Veritas are applicable Page 2 of 2
Any person not a party to the contract pursuant to which this document is delivered may not assert a claim against Bureau Veritas for any liability arising out of errors
or omissions which may be contained in said document, or for errors of judgment, fault or negligence committed by personnel of the society or its agents in the
establishment or issuance of this document, and in connection with any activities for which it may provide.

You might also like