"CONTRUCCION OF THE OPERATION ZONE (ZOP) AND THE ENTRANCE COMPLEX (CI) FOR CHANCAY

MULTIPURPOSE TERMINAL PROJECT, PERU"

Document Revew 0.00


SURVEY ACCEPTANCE PROTOCOL
Approvat Date 9/16/2022

CODE: CHECSAC-CCCC4TH-SUV-ITR-170-CI - 00046 Date of Verification: 7/21/2023


Client:
COSCO SHIPPING PORTS CHANCAY PERÚ S.A. Page: 1 de 2
Berth #2 and Junction
FRONT OR SECTOR : BERTH 2 Unit: Plateform 170 REFERENCE PLAN

JOB DESCRIPTION : inspection the coodinates and level of beam RLB-201 bottom formwork Branch: Upper Structure P114143-E-170-MS-DWG-082-R0

In-situ Casting tranverse and


PK OR LOCATION : BEAM RLB- 201 BOTTOM AXIS F / 25-27 Subentry: longitudinal beam P114143-E-170-MS-DWG-012 R0

EQUIPMENT: TOTAL STATION X LEICA X MODEL: TS10 2" R500 SERIE: 3329249

CALIBRATED EQUIPMENT: SI X NO CALIBRATION EXPIRY: D: 13 M: AUGUST Y: 2023

X: 251559.4089 1.- Location of control points 5.- Marking and layout of Track Axes
-BASE 1: 0+800 Y: 8716818.1771
Z: 5.8490 2.- Placing templates with level coordinates 6.- Slope Control

X: 251796.3203 3.- Line marking and stake out 7.- Verification of concrete levels
BASE 2 N-5 Y: 8717361.1548
Z: 4.523 4.- Tracing and Layout of structures 8.- Others:

X:
BM L-13 Y:
Z: 4.914
Datos de campo

DESIGN ACTUAL
progressive / DIFFERENCES OBSERVATION
N° Pto Axis / level / COORDINATES COORDINATES
Name
East (x) North (y) Level (Z) East (x) North (y) Level (z) East (x) North (y) Level (z)
1 RLB-201 251703.590 8717077.034 1.900 251703.592 8717077.033 1.904 0.002 -0.001 0.004

2 RLB-201 251701.337 8717074.623 1.900 251701.336 8717074.621 1.905 -0.001 -0.002 0.005

3 RLB-201 251699.085 8717072.212 1.900 251699.087 8717072.209 1.898 0.002 -0.003 -0.002

4 RLB-201 251698.129 8717071.189 1.900 251698.130 8717071.187 1.897 0.001 -0.002 -0.003

5 RLB-201 251695.876 8717068.777 1.900 251695.878 8717068.776 1.898 0.002 -0.001 -0.002

6 RLB-201 251693.623 8717066.366 1.900 251693.621 8717066.364 1.898 -0.002 -0.002 -0.002

7 RLB-201 251692.600 8717067.321 1.900 251692.599 8717067.318 1.905 -0.001 -0.003 0.005

8 RLB-201 251694.853 8717069.733 1.900 251694.856 8717069.730 1.898 0.003 -0.003 -0.002

9 RLB-201 251697.106 8717072.144 1.900 251697.105 8717072.145 1.904 -0.001 0.001 0.004

10 RLB-201 251698.062 8717073.167 1.900 251698.061 8717073.169 1.898 -0.001 0.002 -0.002

11 RLB-201 251700.314 8717075.579 1.900 251700.313 8717075.581 1.903 -0.001 0.002 0.003

12 RLB-201 251702.567 8717077.990 1.900 251702.566 8717077.988 1.905 -0.001 -0.002 0.005

COMENTARIOS

Inspection Accepted. YES NO Inspection Accepted. YES NO Inspection Accepted. YES NO


Signature: Signature: Signature:

Name: JOSE JARAMILLO M. Name: Name:


Date: 7/21/2023 Date: Date:
SURVEYOR HEAD OF TOPOGRAPHY
SUPERVISIÓN
CHECSAC-CCCC4TH CHECSAC-CCCC4TH
"CONTRUCCION OF THE OPERATION ZONE (ZOP) AND THE ENTRANCE COMPLEX (CI) FOR CHANCAY
MULTIPURPOSE TERMINAL PROJECT, PERU"

Document Revew 0.00


SURVEY ACCEPTANCE PROTOCOL
Approvat Date 9/16/2022

CODE: CHECSAC-CCCC4TH-SUV-ITR-170-CI - 00046 Date of Verification: 7/21/2023


Client:
COSCO SHIPPING PORTS CHANCAY PERÚ S.A. Page: 2 de 2

Berth #2 and Junction


FRONT OR SECTOR : BERTH 2 Unit: Plateform 170 REFERENCE PLAN

JOB DESCRIPTION : inspection the coodinates and level of beam RLB-201 bottom formwork Branch: Upper Structure P114143-E-170-MS-DWG-082-R0

In-situ Casting tranverse and


PK OR LOCATION : BEAM RLB- 201 BOTTOM AXIS F / 25-27 Subentry: longitudinal beam P114143-E-170-MS-DWG-012 R0

EQUIPMENT: TOTAL STATION X LEICA X MODEL: TS10 2" R500 SERIE: 3329249

CALIBRATED EQUIPMENT: SI X NO CALIBRATION EXPIRY: D: 13 M: AUGUST Y: 2023

X: 252165.3155 1.- Location of control points 5.- Marking and layout of Track Axes
-BASE 1: CHEC-12 Y: 8717612.3838
Z: 46.5350 2.- Placing templates with level coordinates 6.- Slope Control

X: 252079.532 3.- Line marking and stake out 7.- Verification of concrete levels
BASE 2 CHEC-11 Y: 8717943.5941
Z: 67.183 4.- Tracing and Layout of structures 8.- Others:

X:
BM: N-5 Y:
Z: 4.523
Datos de campo

PLANT

PREVIOUS VERIFIED BEAM

AXIS 28/29 25/27

BEAM CODE RLB-201 RLB-201

SECTION
TB-206

TB-207

TB-208

7 8 9 10 11 12

6 5 4 3 2 1

25 26 27
RLB - 201
P114143-E-170-MS-DWG-201-R0
COMENTARIOS

Inspection Accepted. YES NO Inspection Accepted. YES NO Inspection Accepted. YES NO


Signature: Signature: Signature:

Name: JOSE JARAMILLO M. Name: Name:


Date: 7/21/2023 Date: Date:
SURVEYOR HEAD OF TOPOGRAPHY
SUPERVISIÓN
CHECSAC-CCCC4TH CHECSAC-CCCC4TH