CURRICULUM VITAE: ELECTRICAL ENGINEER (OHE)

NAME: NITESH KUMAR MISHRA


MOB NO.: 7564957181
Email Id: nitesh05021996@gmail.com
Address: Village – Malpura, Gopalganj, Bihar

INTRODUCTION

Dynamic, competent & result-oriented professional with 5 years of experiencein


Project Execution. Currently designated as Engineer (OHE) in L&T Inabensa
Consortium at EDFC CP-204 Project. Experienced in handling the complete
project execution works i.e. planning, execution, resource utilization,resource
management etc.

OBJECTIVE

To obtain a position that will enable me to use my Engineering, Project Planning and
Team Leading skill for organization as well as my growth.

WORK EXPERIENCE

• L&T- INABENSA
(July 2021 to Present)

Design and Construction, Installation, Testing and Commissioning of 2X25 KV, 50 HZ, AC
Traction Electrification, Works of double track railway lines on a design build lump sum basis for
Mughal Sarai to new Bhaupur section of Eastern dedicated freight corridor (CP - 204).

• Shyam Indus Power Solution Pvt. Ltd.


(September 2020 to June 2021)

Worked as Site Engineer:

Railway Electrification ( Over Head Electrification Installations ) Project-GP 234,


System-25 kv single line Section -Samastipur (Excl.)-Darbhanga-Raxaul (Excl .) in
Bihar, India under Railway electrification, danapur.
(June 2020 to August 2020)

Railway Electrification (Mainly Over Head Electrification Installations ) Project-GP 231 System-
25 kv single line(Darbhanga to jainagar) in Bihar, India under Railway electrification, danapur.

(August 2019 to June 2020)

Worked as trainee Engineer at Gr. 231, Section-(Excl.)-Madhubani-Jaynagar Section.


RESPONSIBLITIES

• Coordinating with section in-charge for planning.


• Supervising the Operation & Execution of Power supply installations 2x25kv system
at SP/SSPs

• Execution and monitoring of General electrical works as cable laying, wiring,


sub stations (Preparation of single line diagram, work load, execution of cable
laying, installation of Ring main unit panel, LT Panel, 11Kv/0.42Kv sub-station)

• Civil work of OHE – Excavation and casting of opposite, intermediate and


Every type of OHE foundation.

• Execution of OHE activities - Mast erection and grouting, Boom Assembly &
Erection, Cantilever erection, Contact, catenary, NFW,AEW Stringing,
Cantilever adjustment, dropping and clipping, ATD ADJUSTMENT, SED
checking with PMC & client.

• Neutral section & Section insulator Erection • Tower wagon checking With PMC
& client.

• Coordinating with client for planning.


• Coordinating with site staff for achieving target.
• Raise RFI for work inspection with client.
• Counselling manpower on weekly basis for better productivity.
• Preparing Daily/Weekly/Monthly planning with APM
• After completing, work DPR preparing and signing it with client.
• Visiting store to check the availability of ground stock and fabrication work.
• Giving requisition in advance to store team for daily work.
• Executing daily work on site as per approved design and ensuring quality and safety
in work.

• Preparing DPR on daily basis and getting sign of client.


ACADEMIC QUALIFICATION

COURSE UNIVERSITY/BOARD YEAR OF PASSING


Diploma in Electrical HARYANA STATE 2019
Engineering BOARD OF TECHNICAL
EDUCATION
ITI (ELECTRICIAN) NCVT 2016
Intermediate BIHAR SCHOOL 2014
EXAMINATION
BOARD,PATNA
High School BIHAR 2012
SCHOOL
EXAMINATION
BOARD,PATNA

PERSONAL SKILLS

Self-motivated, skill in problem solving, Always wanting to learn something new.