SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 1 OF 8

1. GENERAL DATA & INFORMATION:

Relay Make and Model Phase CT Ratio


Relay Order Code Ground CT Ratio
Relay Serial Number VT Ratio
Relay Functions Frequency & Phase Sequence
Relay Identifier/Tag Nominal Current / Voltage

2. VISUAL INSPECTION:

Item Descriptions Checked


1 Inspect for any physical damage or defects
2 Check name plate information for correctness
3 Check the tightness of all connections
4 Check for proper installation and mounting

3. ELECTRICAL CHECKS:

Item Descriptions Checked


1 Check all connections according to the wiring diagram
2 Check Auxiliary power supply and polarity for correctness
3 Check Case Earthing
5 Check LED’s for correct functioning
6 Check Binary Inputs for correct functioning
7 Check Binary outputs for correct functioning
8 Check Event Recorder for correct functioning

4. TRANSFORMER NAME PLATE DETAILS:

2 WINDING TRANSFORMER-Frequncy-60Hz, Phase Rotation: ABC, Vector Group: D/y330 (Dyn11)


Parameters Winding 1 (Primary) Winding 2 (Secondary) Winding 3 (Tertiary)
Phase to Phase Voltage (kV) -
Rated Load (MVA) -
Phase CT Primary (Amps) -
Ground CT Primary (Amps) -

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 2 OF 8

5. LOGICAL INPUT FUNCTIONING:

Input No Input Name Terminal Remarks


Input-1 LOCKOUT 86T2 D1
Input-2 TRF OIL TRIP 71X D2
Input-3 PRESSURE TRIP 63X D3
Input-4 LOCKOUT 86B1 D4
Input-5 94R TRIP 34.5KV D5
Input-6 LOCKOUT 86T1 D6
Input-7 LOGIC INPUT-7 D7
Input-8 LOGIC INPUT-8 D8
Input-9 LOGIC INPUT-9 C1
Input-10 63 PRI ALARM C2
Input-11 49 ALARM C3
Input-12 26 ALARM C4
Input-13 AUX 27 ALARM C5
Input-14 LOGIC INPUT-14 C6
Input-15 LOGIC INPUT-15 C7
Input-16 34.5 CB TRIP C8

6. OUTPUT RELAY FUNCTIONING:

Output Relay No Output Name Terminal Remarks


Relay-1 SOLID STATE TRIP E1-F1
Relay-2 INIT LOCKOUT 86T2 NO / E2-F2
Relay-3 INIT LOCKOUT 86T1 NO / E3-F3
Relay-4 SPARE 4 NO / E4-F4
Relay-5 SPARE 5 NO / E5-F5
Relay-6 INIT ABT NO / E6-F6 + NC / E7-F6
Relay-7 SR745 TRIP/FAULT NO / F7-E8 + NC / F8-E8
Relay-8 READY FOR ABT NO / E9-F9 + NC / E10-F9
SELF TEST - NO / F10-E11+NC / F11-E11

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 3 OF 8

7. PHASE CURRENT ACCURACY TEST:

7.1. WINDING 1 (PRIMARY) W1-PHASE CT RATIO: A

Applied Secondary Current Expected Primary Current Displayed Primary Current


Phase
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)
1.25 0
A 2.50 0
5.00 0
1.25 240
B 2.50 90
5.00 180
1.25 120
C 2.50 180
5.00 270

7.2. WINDING 2 (SECONDARY) W2-PHASE CT RATIO: A

Applied Secondary Current Expected Primary Current Displayed Primary Current


Phase
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)
1.25 0
A 2.50 0
5.00 0
1.25 240
B 2.50 90
5.00 180
1.25 120
C 2.50 180
5.00 270

7.3. WINDING 3 (TERTIARY) W3-PHASE CT RATIO: ______ A

Applied Secondary Current Expected Primary Current Displayed Primary Current


Phase
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 4 OF 8

8. NEUTRAL CURRENT ACCURACY TEST:

8.1. WINDING 1 (PRIMARY) W1-NEUTRAL CT RATIO: _______ A CT INPUT:

Applied Secondary Current Expected Primary Current Displayed Primary Current


CT
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)

W1-
NCT

8.2. WINDING 2 (SECONDARY) W2-NEUTRAL CT RATIO: CT INPUT:

Applied Secondary Current Expected Primary Current Displayed Primary Current


CT
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)
1.25 0 - -
W2-
2.50 0 - -
NCT
5.00 0 - -

8.3. WINDING 3 (TERTIARY) W3-NEUTRAL CT RATIO: _______ A CT INPUT:

Applied Secondary Current Expected Primary Current Displayed Primary Current


CT
Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg) Magnitude (A) Angle (Deg)

W3-
NCT

9. VOLTAGE ACCURACY TEST: VT RATIO: _____________ V; VT INPUT:

Applied Secondary Voltage Expected Primary Voltage Displayed Primary Voltage


Magnitude Angle Magnitude Angle Magnitude Angle
Phase Phase Phase
(V) (Deg) (kV) (Deg) (kV) (Deg)

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 5 OF 8

10. DIFFERENTIAL ELEMENT:

10.1. PERCENT DIFFERENTIAL PROTECTION:

10.1.1. SETTINGS:

Percent Differential Function


Percent Differential Relays
Percent Differential Target
Percent Differential Pickup
Percent Differential Slope 1
Percent Differential Break Point
Percent Differential Slope 2
Percent Differential Block

10.1.2. PICKUP AND DROP OFF CHECK :

Actual Pickup Actual Dropoff Trip Time @


Winding Phase Pickup Setting
(A) (A) 2xP.U (mSec)

A
WINDING 1 B
DELTA C
ABC

A
WINDING 2 B
WYE C
ABC

A
WINDING 3 B
N/A C
ABC

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 6 OF 8

11. 2ND HARMONICS INHIBIT CHECK:

Injected Injected Measured


Inhibit Level
Winding Phase Current I1 @ Current I2 @ Harmonic Relay Status
Setting (%)
60 Hz (A) 120 Hz (A) I2/I1 (%)
A
WINDING 1
B
DELTA
C
A
WINDING 2
B
WYE
C
A
WINDING 3
B
N/A
C

12. GROUND OVERCURRENT ELEMENT:

12.1. GROUND TOC:

12.1.1. SETTINGS:

Settings W1 GND TOC W2 GND TOC W3 GND TOC


GND TOC Function
GND TOC Relays - -
GND TOC Target - -
GND TOC Pickup - -
GND TOC Curve - -
GND TOC Multiplier - -

12.1.2. PICKUP / DROPOFF AND TIMING:

Expected Trip Time Actual Trip Time


Function Pickup (A) Drop-off (A)
@ 2 x P.U (Sec) @ 2 x P.U (Sec)
W1 GND TOC - - - -
W2 GND TOC - - - -
W3 GND TOC

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 7 OF 8

12.2. GROUND INST OC1:

12.2.1. SETTINGS:

Settings W1 GND IOC1 W2 GND IOC1 W3 GND IOC1


GND IOC1 Function
GND IOC1 Relays -
GND IOC1 Target -
GND IOC1 Pickup -
GND IOC1 Delay -

12.2.2. PICKUP / DROPOFF AND TIMING:

Expected Trip Time Actual Trip Time


Function Pickup (A) Drop-off (A)
@ > P.U (Sec) @ > P.U (Sec)
W1 GND IOC1 - - - -
W2 GND IOC1
W3 GND IOC1

12.3. GROUND INST OC2:

12.3.1. SETTINGS:

Settings W1 GND IOC2 W2 GND IOC2 W3 GND IOC2


GND IOC2 Function
GND IOC2 Relays - -
GND IOC2 Target - -
GND IOC2 Pickup - -
GND IOC2 Delay - -

12.3.2. PICKUP / DROPOFF AND TIMING:

Expected Trip Time Actual Trip Time


Function Pickup (A) Drop-off (A)
@ > P.U (Sec) @ > P.U (Sec)
W1 GND IOC2 - - - -
W2 GND IOC2 - - - -
W3 GND IOC2

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR


Signature
Signature
Date
GE 745
TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT

NAME OF PLANT: PETRO RABIGH – PHASE -2 DATE:


SUBSTATION: SS- SWGR & FEEDER: PAGE 8 OF 8

13. TESTING EQUIPMENT USED:


Equipment Name Serial No Calibration Due Date
Freja-300 1002187 15-Feb-2023

Notes:

P.U – Pick Up

 Relay Tested with actual Settings (Without changing the settings and configuration)
 Only the Enabled Functions were tested
 Trip Test Was done by Secondary Injection

WITNESS ENGINEER/CONTRACTOR PSD REP./SUPERVISOR