TRANSFORMER
MANAGEMENT RELAY
SITE TEST REPORT
2. VISUAL INSPECTION:
3. ELECTRICAL CHECKS:
W1-
NCT
W3-
NCT
10.1.1. SETTINGS:
A
WINDING 1 B
DELTA C
ABC
A
WINDING 2 B
WYE C
ABC
A
WINDING 3 B
N/A C
ABC
12.1.1. SETTINGS:
12.2.1. SETTINGS:
12.3.1. SETTINGS:
Notes:
P.U – Pick Up
Relay Tested with actual Settings (Without changing the settings and configuration)
Only the Enabled Functions were tested
Trip Test Was done by Secondary Injection