SURVEY REPORT

UPPER STONE LAYER DIA. 60 cm


GABION CONSTRUCTION
APICAL PROJECT

Project Name : Gabion Construction


Date : Januari 2022
PANJANG LUAS LUAS RATA RATA VOLUME
STA
NO (M1) (M2) (M2) (M3) KET.
A P LI D = ( LI+ LI ) /2 E= D x P

1 0+025 16.380
8.00 16.380 131.04
2 0+033 16.380
17.00 16.380 278.46
3 0+050 16.380
25.00 16.380 409.50
4 0+75 16.380
25.00 16.380 409.50
5 0+100 16.380
25.00 16.380 409.50
6 0+125 16.380
7.50 16.380 122.85
7 0+132.5 16.380
17.50 16.380 286.65
8 0+150 16.380
25.00 16.380 409.50
9 0+175 16.380
25.00 16.380 409.50
10 0+200 16.380
12.50 16.380 204.75
11 0+212.5 16.380

Total 187.50 3,071.25


Already Claim 1,557.61
Claim This Period 1,513.64

Material on Site
Volume Barge 1 = 1807 Ton atau 860.48 m3
Volume Barge 2 = 2906 Ton atau 1383.81 m3
Volume Barge 3 = 2700 Ton atau 1285.71 m3
Total 7413 Ton atau 3530.00 m3
Terinstall = -----------------------------------------------> 3,071.25 m3
Sisa on site 458.75 m3
MOS (75%) 344.06 m3

TOTAL CLAIM (INSTALL+MOS) = 3,415.31 m3


ALREADY CLAIM = 1,557.61 m3
CLAIM THIS PERIOD = 1,857.70 m3

Yang Membuat, Disetujui,


PT. SAM PT. SDO